Chapin Rose; John C. D'Amico; Edward J. Acevedo; Michael W. Tryon; Patrick J. Verschoore
SB 2814 status: Enacted — Public Act 099-0906 (updated Dec 7, 2016).

Official summary alongside an AI-generated read on where it stands and why.
We will match the exact bill in LegiScan, check text or summary sources, and label the result clearly.
Bill summary
Public Act 0906 99TH GENERAL ASSEMBLY Public Act 099-0906 SB2814 Enrolled LRB099 19990 EGJ 44389 b `` AN ACT concerning regulation. ```Be it enacted by the People of the State of Illinois,` `represented in the General Assembly:` ` Section 1.``Findings.` (a) In 2011, the General Assembly encouraged and enabled` `the State's largest electric utilities to undertake` `substantial investment to refurbish, rebuild, modernize, and` `expand Illinois' century-old electric grid. Among those` `investments were the deployment of a smart grid and advanced` `metering infrastructure platform that would be accessible to` `all retail customers through new, digital smart meters. This` `investment, now well underway, not only allows utilities to` `continue to provide safe, reliable, and affordable service to` `the State's current and future utility customers, but also` `empowers the citizens of this State to directly access and` `participate in the rapidly emerging clean energy economy while` `also presenting them with unprecedented choices in their source` `of energy supply and pricing.` To ensure that the State and its citizens, including` `low-income citizens, are equipped to enjoy the opportunities` `and benefits of the smart grid and evolving clean energy` `marketplace, the General Assembly finds and declares that` `Illinois should continue in its efforts to build the grid of` `the future using the smart grid and advanced metering` `infrastructure platform, as well as maximize the impact of the` `State's existing energy efficiency and renewable energy` `portfolio standards. Specifically, the Generally Assembly` `finds that:` ``(1) the State should encourage: the adoption and` `deployment of cost-effective distributed energy resource` `technologies and devices, such as photovoltaics, which can` `encourage private investment in renewable energy` `resources, stimulate economic growth, enhance the` `continued diversification of Illinois' energy resource` `mix, and protect the Illinois environment; investment in` `renewable energy resources, including, but not limited to,` `photovoltaic distributed generation, which should benefit` `all citizens of the State, including low-income` `households; and` ``(2) the State's existing energy efficiency standard` `should be updated to ensure that customers continue to` `realize increased value, to incorporate and optimize` `measures enabled by the smart grid, including voltage` `optimization measures, and to provide incentives for` `electric utilities to achieve the energy savings goals.` (b) The General Assembly finds that low-income customers` `should be included within the State's efforts to expand the use` `of distributed generation technologies and devices.` Section 1.5.``Zero emission standard legislative findings.` `The General Assembly finds and declares:` ``(1) Reducing emissions of carbon dioxide and other air` `pollutants, such as sulfur oxides, nitrogen oxides, and` `particulate matter, is critical to improving air quality in` `Illinois for Illinois residents.` ``(2) Sulfur oxides, nitrogen oxides, and particulate` `emissions have significant adverse health effects on` `persons exposed to them, and carbon dioxide emissions` `result in climate change trends that could significantly` `adversely impact Illinois.` ``(3) The existing renewable portfolio standard has been` `successful in promoting the growth of renewable energy` `generation to reduce air pollution in Illinois. However, to` `achieve its environmental goals, Illinois must expand its` `commitment to zero emission energy generation and value the` `environmental attributes of zero emission generation that` `currently falls outside the scope of the existing renewable` `portfolio standard, including, but not limited to, nuclear` `power.` ``(4) Preserving existing zero emission energy` `generation and promoting new zero emission energy` `generation is vital to placing the State on a glide path to` `achieving its environmental goals and ensuring that air` `quality in Illinois continues to improve.` ``(5) The Illinois Commerce Commission, the Illinois` `Power Agency, the Illinois Environmental Protection` `Agency, and the Department of Commerce and Economic` `Opportunity issued a report dated January 5, 2015 titled` `"Potential Nuclear Power Plant Closings in Illinois" (the` `Report), which addressed the issues identified by Illinois` `House Resolution 1146 of the 98th General Assembly, which,` `among other things, urged the Illinois Environmental` `Protection Agency to prepare a report showing how the` `premature closure of existing nuclear power plants in` `Illinois will affect the societal cost of increased` `greenhouse gas emissions based upon the Environmental` `Protection Agency's published societal cost of greenhouse` `gases.` ``(6) The Report also included analysis from PJM` `Interconnection, LLC, which identified significant adverse` `consequences for electric reliability, including` `significant voltage and thermal violations in the` `interstate transmission network, in the event that` `Illinois' existing nuclear facilities close prematurely.` `The Report also found that nuclear power plants are among` `the most reliable sources of energy, which means that` `electricity from nuclear power plants is available on the` `electric grid all hours of the day and when needed, thereby` `always reducing carbon emissions.` ``(7) Illinois House Resolution 1146 further urged that` `the Report make findings concerning potential market-based` `solutions that will ensure that the premature closure of` `these nuclear power plants does not occur and that the` `associated dire consequences to the environment, electric` `reliability, and the regional economy are averted.` ``(8) The Report identified potential market-based` `solutions that will ensure that the premature closure of` `these nuclear power plants does not occur and that the` `associated dire consequences to the environment, electric` `reliability, and the regional economy are averted.` The General Assembly further finds that the Social Cost of` `Carbon is an appropriate valuation of the environmental` `benefits provided by zero emission facilities, provided that` `the valuation is subject to a price adjustment that can reduce` `the price for zero emission credits below the Social Cost of` `Carbon. This will ensure that the procurement of zero emission` `credits remains affordable for retail customers even if energy` `and capacity prices are projected to rise above 2016 levels` `reflected in the baseline market price index.` The General Assembly therefore finds that it is necessary` `to establish and implement a zero emission standard, which will` `increase the State's reliance on zero emission energy through` `the procurement of zero emission credits from zero emission` `facilities, in order to achieve the State's environmental` `objectives and reduce the adverse impact of emitted air` `pollutants on the health and welfare of the State's citizens.` Section 3.``The Illinois Administrative Procedure Act is` `amended by changing Section 5-45 as follows:` (5 ILCS 100/5-45) `(from Ch. 127, par. 1005-45)` Sec. 5-45.``Emergency rulemaking.` (a) "Emergency" means the existence of any situation that` `any agency finds reasonably constitutes a threat to the public` `interest, safety, or welfare.` (b) If any agency finds that an emergency exists that` `requires adoption of a rule upon fewer days than is required by` `Section 5-40 and states in writing its reasons for that` `finding, the agency may adopt an emergency rule without prior` `notice or hearing upon filing a notice of emergency rulemaking` `with the Secretary of State under Section 5-70. The notice` `shall include the text of the emergency rule and shall be` `published in the Illinois Register. Consent orders or other` `court orders adopting settlements negotiated by an agency may` `be adopted under this Section. Subject to applicable` `constitutional or statutory provisions, an emergency rule` `becomes effective immediately upon filing under Section 5-65 or` `at a stated date less than 10 days thereafter. The agency's` `finding and a statement of the specific reasons for the finding` `shall be filed with the rule. The agency shall take reasonable` `and appropriate measures to make emergency rules known to the` `persons who may be affected by them.` (c) An emergency rule may be effective for a period of not` `longer than 150 days, but the agency's authority to adopt an` `identical rule under Section 5-40 is not precluded. No` `emergency rule may be adopted more than once in any``24-month `24` `month``period, except that this limitation on the number of` `emergency rules that may be adopted in a``24-month `24 month `period does not apply to (i) emergency rules that make` `additions to and deletions from the Drug Manual under Section` `5-5.16 of the Illinois Public Aid Code or the generic drug` `formulary under Section 3.14 of the Illinois Food, Drug and` `Cosmetic Act, (ii) emergency rules adopted by the Pollution` `Control Board before July 1, 1997 to implement portions of the` `Livestock Management Facilities Act, (iii) emergency rules` `adopted by the Illinois Department of Public Health under` `subsections (a) through (i) of Section 2 of the Department of` `Public Health Act when necessary to protect the public's` `health, (iv) emergency rules adopted pursuant to subsection (n)` `of this Section, (v) emergency rules adopted pursuant to` `subsection (o) of this Section, or (vi) emergency rules adopted` `pursuant to subsection (c-5) of this Section. Two or more` `emergency rules having substantially the same purpose and` `effect shall be deemed to be a single rule for purposes of this` `Section.` (c-5) To facilitate the maintenance of the program of group` `health benefits provided to annuitants, survivors, and retired` `employees under the State Employees Group Insurance Act of` `1971, rules to alter the contributions to be paid by the State,` `annuitants, survivors, retired employees, or any combination` `of those entities, for that program of group health benefits,` `shall be adopted as emergency rules. The adoption of those` `rules shall be considered an emergency and necessary for the` `public interest, safety, and welfare.` (d) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 1999 budget,` `emergency rules to implement any provision of Public Act 90-587` `or 90-588 or any other budget initiative for fiscal year 1999` `may be adopted in accordance with this Section by the agency` `charged with administering that provision or initiative,` `except that the 24-month limitation on the adoption of` `emergency rules and the provisions of Sections 5-115 and 5-125` `do not apply to rules adopted under this subsection (d). The` `adoption of emergency rules authorized by this subsection (d)` `shall be deemed to be necessary for the public interest,` `safety, and welfare.` (e) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 2000 budget,` `emergency rules to implement any provision of Public Act 91-24` `or any other budget initiative for fiscal year 2000 may be` `adopted in accordance with this Section by the agency charged` `with administering that provision or initiative, except that` `the 24-month limitation on the adoption of emergency rules and` `the provisions of Sections 5-115 and 5-125 do not apply to` `rules adopted under this subsection (e). The adoption of` `emergency rules authorized by this subsection (e) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (f) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 2001 budget,` `emergency rules to implement any provision of Public Act 91-712` `or any other budget initiative for fiscal year 2001 may be` `adopted in accordance with this Section by the agency charged` `with administering that provision or initiative, except that` `the 24-month limitation on the adoption of emergency rules and` `the provisions of Sections 5-115 and 5-125 do not apply to` `rules adopted under this subsection (f). The adoption of` `emergency rules authorized by this subsection (f) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (g) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 2002 budget,` `emergency rules to implement any provision of Public Act 92-10` `or any other budget initiative for fiscal year 2002 may be` `adopted in accordance with this Section by the agency charged` `with administering that provision or initiative, except that` `the 24-month limitation on the adoption of emergency rules and` `the provisions of Sections 5-115 and 5-125 do not apply to` `rules adopted under this subsection (g). The adoption of` `emergency rules authorized by this subsection (g) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (h) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 2003 budget,` `emergency rules to implement any provision of Public Act 92-597` `or any other budget initiative for fiscal year 2003 may be` `adopted in accordance with this Section by the agency charged` `with administering that provision or initiative, except that` `the 24-month limitation on the adoption of emergency rules and` `the provisions of Sections 5-115 and 5-125 do not apply to` `rules adopted under this subsection (h). The adoption of` `emergency rules authorized by this subsection (h) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (i) In order to provide for the expeditious and timely` `implementation of the State's fiscal year 2004 budget,` `emergency rules to implement any provision of Public Act 93-20` `or any other budget initiative for fiscal year 2004 may be` `adopted in accordance with this Section by the agency charged` `with administering that provision or initiative, except that` `the 24-month limitation on the adoption of emergency rules and` `the provisions of Sections 5-115 and 5-125 do not apply to` `rules adopted under this subsection (i). The adoption of` `emergency rules authorized by this subsection (i) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (j) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2005 budget as provided under the Fiscal Year 2005 Budget` `Implementation (Human Services) Act, emergency rules to` `implement any provision of the Fiscal Year 2005 Budget` `Implementation (Human Services) Act may be adopted in` `accordance with this Section by the agency charged with` `administering that provision, except that the 24-month` `limitation on the adoption of emergency rules and the` `provisions of Sections 5-115 and 5-125 do not apply to rules` `adopted under this subsection (j). The Department of Public Aid` `may also adopt rules under this subsection (j) necessary to` `administer the Illinois Public Aid Code and the Children's` `Health Insurance Program Act. The adoption of emergency rules` `authorized by this subsection (j) shall be deemed to be` `necessary for the public interest, safety, and welfare.` (k) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2006 budget, emergency rules to implement any provision of` `Public Act 94-48 or any other budget initiative for fiscal year` `2006 may be adopted in accordance with this Section by the` `agency charged with administering that provision or` `initiative, except that the 24-month limitation on the adoption` `of emergency rules and the provisions of Sections 5-115 and` `5-125 do not apply to rules adopted under this subsection (k).` `The Department of Healthcare and Family Services may also adopt` `rules under this subsection (k) necessary to administer the` `Illinois Public Aid Code, the Senior Citizens and Persons with` `Disabilities Property Tax Relief Act, the Senior Citizens and` `Disabled Persons Prescription Drug Discount Program Act (now` `the Illinois Prescription Drug Discount Program Act), and the` `Children's Health Insurance Program Act. The adoption of` `emergency rules authorized by this subsection (k) shall be` `deemed to be necessary for the public interest, safety, and` `welfare.` (l) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2007 budget, the Department of Healthcare and Family Services` `may adopt emergency rules during fiscal year 2007, including` `rules effective July 1, 2007, in accordance with this` `subsection to the extent necessary to administer the` `Department's responsibilities with respect to amendments to` `the State plans and Illinois waivers approved by the federal` `Centers for Medicare and Medicaid Services necessitated by the` `requirements of Title XIX and Title XXI of the federal Social` `Security Act. The adoption of emergency rules authorized by` `this subsection (l) shall be deemed to be necessary for the` `public interest, safety, and welfare.` (m) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2008 budget, the Department of Healthcare and Family Services` `may adopt emergency rules during fiscal year 2008, including` `rules effective July 1, 2008, in accordance with this` `subsection to the extent necessary to administer the` `Department's responsibilities with respect to amendments to` `the State plans and Illinois waivers approved by the federal` `Centers for Medicare and Medicaid Services necessitated by the` `requirements of Title XIX and Title XXI of the federal Social` `Security Act. The adoption of emergency rules authorized by` `this subsection (m) shall be deemed to be necessary for the` `public interest, safety, and welfare.` (n) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2010 budget, emergency rules to implement any provision of` `Public Act 96-45 or any other budget initiative authorized by` `the 96th General Assembly for fiscal year 2010 may be adopted` `in accordance with this Section by the agency charged with` `administering that provision or initiative. The adoption of` `emergency rules authorized by this subsection (n) shall be` `deemed to be necessary for the public interest, safety, and` `welfare. The rulemaking authority granted in this subsection` `(n) shall apply only to rules promulgated during Fiscal Year` `2010.` (o) In order to provide for the expeditious and timely` `implementation of the provisions of the State's fiscal year` `2011 budget, emergency rules to implement any provision of` `Public Act 96-958 or any other budget initiative authorized by` `the 96th General Assembly for fiscal year 2011 may be adopted` `in accordance with this Section by the agency charged with` `administering that provision or initiative. The adoption of` `emergency rules authorized by this subsection (o) is deemed to` `be necessary for the public interest, safety, and welfare. The` `rulemaking authority granted in this subsection (o) applies` `only to rules promulgated on or after``July 1, 2010 (``the` `effective date of Public Act 96-958``)``through June 30, 2011.` (p) In order to provide for the expeditious and timely` `implementation of the provisions of Public Act 97-689,` `emergency rules to implement any provision of Public Act 97-689` `may be adopted in accordance with this subsection (p) by the` `agency charged with administering that provision or` `initiative. The 150-day limitation of the effective period of` `emergency rules does not apply to rules adopted under this` `subsection (p), and the effective period may continue through` `June 30, 2013. The 24-month limitation on the adoption of` `emergency rules does not apply to rules adopted under this` `subsection (p). The adoption of emergency rules authorized by` `this subsection (p) is deemed to be necessary for the public` `interest, safety, and welfare.` (q) In order to provide for the expeditious and timely` `implementation of the provisions of Articles 7, 8, 9, 11, and` `12 of Public Act 98-104, emergency rules to implement any` `provision of Articles 7, 8, 9, 11, and 12 of Public Act 98-104` `may be adopted in accordance with this subsection (q) by the` `agency charged with administering that provision or` `initiative. The 24-month limitation on the adoption of` `emergency rules does not apply to rules adopted under this` `subsection (q). The adoption of emergency rules authorized by` `this subsection (q) is deemed to be necessary for the public` `interest, safety, and welfare.` (r) In order to provide for the expeditious and timely` `implementation of the provisions of Public Act 98-651,` `emergency rules to implement Public Act 98-651 may be adopted` `in accordance with this subsection (r) by the Department of` `Healthcare and Family Services. The 24-month limitation on the` `adoption of emergency rules does not apply to rules adopted` `under this subsection (r). The adoption of emergency rules` `authorized by this subsection (r) is deemed to be necessary for` `the public interest, safety, and welfare.` (s) In order to provide for the expeditious and timely` `implementation of the provisions of Sections 5-5b.1 and 5A-2 of` `the Illinois Public Aid Code, emergency rules to implement any` `provision of Section 5-5b.1 or Section 5A-2 of the Illinois` `Public Aid Code may be adopted in accordance with this` `subsection (s) by the Department of Healthcare and Family` `Services. The rulemaking authority granted in this subsection` `(s) shall apply only to those rules adopted prior to July 1,` `2015. Notwithstanding any other provision of this Section, any` `emergency rule adopted under this subsection (s) shall only` `apply to payments made for State fiscal year 2015. The adoption` `of emergency rules authorized by this subsection (s) is deemed` `to be necessary for the public interest, safety, and welfare.` (t) In order to provide for the expeditious and timely` `implementation of the provisions of Article II of Public Act` `99-6, emergency rules to implement the changes made by Article` `II of Public Act 99-6 to the Emergency Telephone System Act may` `be adopted in accordance with this subsection (t) by the` `Department of State Police. The rulemaking authority granted in` `this subsection (t) shall apply only to those rules adopted` `prior to July 1, 2016. The 24-month limitation on the adoption` `of emergency rules does not apply to rules adopted under this` `subsection (t). The adoption of emergency rules authorized by` `this subsection (t) is deemed to be necessary for the public` `interest, safety, and welfare.` (u) In order to provide for the expeditious and timely` `implementation of the provisions of the Burn Victims Relief` `Act, emergency rules to implement any provision of the Act may` `be adopted in accordance with this subsection (u) by the` `Department of Insurance. The rulemaking authority granted in` `this subsection (u) shall apply only to those rules adopted` `prior to December 31, 2015. The adoption of emergency rules` `authorized by this subsection (u) is deemed to be necessary for` `the public interest, safety, and welfare.` (v) In order to provide for the expeditious and timely` `implementation of the provisions of``Public Act 99-516 `this` `amendatory Act of the 99th General Assembly``, emergency rules to` `implement``Public Act 99-516 `this amendatory Act of the 99th` `General Assembly``may be adopted in accordance with this` `subsection (v) by the Department of Healthcare and Family` `Services. The 24-month limitation on the adoption of emergency` `rules does not apply to rules adopted under this subsection` `(v). The adoption of emergency rules authorized by this` `subsection (v) is deemed to be necessary for the public` `interest, safety, and welfare.` (w) `(v)``In order to provide for the expeditious and timely` `implementation of the provisions of``Public Act 99-796 `this` `amendatory Act of the 99th General Assembly``, emergency rules to` `implement the changes made by``Public Act 99-796 `this amendatory` `Act of the 99th General Assembly``may be adopted in accordance` `with this subsection``(w) `(v)``by the Adjutant General. The` `adoption of emergency rules authorized by this subsection``(w) `(v)``is deemed to be necessary for the public interest, safety,` `and welfare.` (x) In order to provide for the expeditious and timely` `implementation of the provisions of this amendatory Act of the` `99th General Assembly, emergency rules to implement subsection` `(i) of Section 16-115D, subsection (g) of Section 16-128A, and` `subsection (a) of Section 16-128B of the Public Utilities Act` `may be adopted in accordance with this subsection (x) by the` `Illinois Commerce Commission. The rulemaking authority granted` `in this subsection (x) shall apply only to those rules adopted` `within 180 days after the effective date of this amendatory Act` `of the 99th General Assembly. The adoption of emergency rules` `authorized by this subsection (x) is deemed to be necessary for` `the public interest, safety, and welfare. `(Source: P.A. 98-104, eff. 7-22-13; 98-463, eff. 8-16-13;` `98-651, eff. 6-16-14; 99-2, eff. 3-26-15; 99-6, eff. 1-1-16;` `99-143, eff. 7-27-15; 99-455, eff. 1-1-16; 99-516, eff.` `6-30-16; 99-642, eff. 7-28-16; 99-796, eff. 1-1-17; revised` `9-21-16.)` Section 5.``The Illinois Power Agency Act is amended by` `changing Sections 1-5, 1-10, 1-20, 1-25, 1-56, and 1-75 as` `follows:` (20 ILCS 3855/1-5)` Sec. 1-5.``Legislative declarations and findings.``The` `General Assembly finds and declares:` ``(1) The health, welfare, and prosperity of all Illinois` `citizens require the provision of adequate, reliable,` `affordable, efficient, and environmentally sustainable` `electric service at the lowest total cost over time, taking` `into account any benefits of price stability.` ``(2)``(Blank). `The transition to retail competition is` `not complete. Some customers, especially residential and` `small commercial customers, have failed to benefit from` `lower electricity costs from retail and wholesale` `competition.` ``(3)``(Blank). `Escalating prices for electricity in` `Illinois pose a serious threat to the economic well-being,` `health, and safety of the residents of and the commerce and` `industry of the State.` ``(4)``It `To protect against this threat to economic` `well-being, health, and safety it``is necessary to improve` `the process of procuring electricity to serve Illinois` `residents, to promote investment in energy efficiency and` `demand-response measures, and to``maintain and``support` `development of clean coal technologies``, generation` `resources that operate at all hours of the day and under` `all weather conditions, zero emission facilities,``and` `renewable resources.` ``(5) Procuring a diverse electricity supply portfolio` `will ensure the lowest total cost over time for adequate,` `reliable, efficient, and environmentally sustainable` `electric service.` ``(6) Including``cost-effective``renewable resources``and` `zero emission credits from zero emission facilities``in that` `portfolio will reduce long-term direct and indirect costs` `to consumers by decreasing environmental impacts and by` `avoiding or delaying the need for new generation,` `transmission, and distribution infrastructure.``Developing` `new renewable energy resources in Illinois, including` `brownfield solar projects and community solar projects,` `will help to diversify Illinois electricity supply, avoid` `and reduce pollution, reduce peak demand, and enhance` `public health and well-being of Illinois residents. ``(7) Developing community solar projects in Illinois` `will help to expand access to renewable energy resources to` `more Illinois residents.` ``(8) Developing brownfield solar projects in Illinois` `will help return blighted or contaminated land to` `productive use while enhancing public health and the` `well-being of Illinois residents. ``(9) `(7)``Energy efficiency, demand-response measures,` `zero emission energy,``and renewable energy are resources` `currently underused in Illinois.``These resources should be` `used, when cost effective, to reduce costs to consumers,` `improve reliability, and improve environmental quality and` `public health. ``(10) `(8)``The State should encourage the use of advanced` `clean coal technologies that capture and sequester carbon` `dioxide emissions to advance environmental protection` `goals and to demonstrate the viability of coal and` `coal-derived fuels in a carbon-constrained economy.` ``(11) `(9)``The General Assembly enacted Public Act` `96-0795 to reform the State's purchasing processes,` `recognizing that government procurement is susceptible to` `abuse if structural and procedural safeguards are not in` `place to ensure independence, insulation, oversight, and` `transparency.` ``(12) `(10)``The principles that underlie the procurement` `reform legislation apply also in the context of power` `purchasing.` The General Assembly therefore finds that it is necessary` `to create the Illinois Power Agency and that the goals and` `objectives of that Agency are to accomplish each of the` `following:` ``(A) Develop electricity procurement plans to ensure` `adequate, reliable, affordable, efficient, and` `environmentally sustainable electric service at the lowest` `total cost over time, taking into account any benefits of` `price stability, for electric utilities that on December` `31, 2005 provided electric service to at least 100,000` `customers in Illinois and for small multi-jurisdictional` `electric utilities that (i) on December 31, 2005 served` `less than 100,000 customers in Illinois and (ii) request a` `procurement plan for their Illinois jurisdictional load.` `The procurement plan shall be updated on an annual basis` `and shall include renewable energy resources``and,` `beginning with the delivery year commencing June 1, 2017,` `zero emission credits from zero emission facilities `sufficient to achieve the standards specified in this Act.` ``(B) Conduct``the``competitive procurement processes` `identified in this Act `to procure the supply resources` `identified in the procurement plan``.` ``(C) Develop electric generation and co-generation` `facilities that use indigenous coal or renewable` `resources, or both, financed with bonds issued by the` `Illinois Finance Authority.` ``(D) Supply electricity from the Agency's facilities at` `cost to one or more of the following: municipal electric` `systems, governmental aggregators, or rural electric` `cooperatives in Illinois. ``(E) Ensure that the process of power procurement is` `conducted in an ethical and transparent fashion, immune` `from improper influence.` ``(F) Continue to review its policies and practices to` `determine how best to meet its mission of providing the` `lowest cost power to the greatest number of people, at any` `given point in time, in accordance with applicable law.` ``(G) Operate in a structurally insulated, independent,` `and transparent fashion so that nothing impedes the` `Agency's mission to secure power at the best prices the` `market will bear, provided that the Agency meets all` `applicable legal requirements.` ``(H) Implement renewable energy procurement and` `training programs throughout the State to diversify` `Illinois electricity supply, improve reliability, avoid` `and reduce pollution, reduce peak demand, and enhance` `public health and well-being of Illinois residents,` `including low-income residents. `(Source: P.A. 97-325, eff. 8-12-11; 97-618, eff. 10-26-11;` `97-813, eff. 7-13-12.)` ` (20 ILCS 3855/1-10) `` Sec. 1-10.``Definitions.` "Agency" means the Illinois Power Agency.` "Agency loan agreement" means any agreement pursuant to` `which the Illinois Finance Authority agrees to loan the` `proceeds of revenue bonds issued with respect to a project to` `the Agency upon terms providing for loan repayment installments` `at least sufficient to pay when due all principal of, interest` `and premium, if any, on those revenue bonds, and providing for` `maintenance, insurance, and other matters in respect of the` `project.` "Authority" means the Illinois Finance Authority.` "Brownfield site photovoltaic project" means photovoltaics` `that are:` ``(1) interconnected to an electric utility as defined in` `this Section, a municipal utility as defined in this` `Section, a public utility as defined in Section 3-105 of` `the Public Utilities Act, or an electric cooperative, as` `defined in Section 3-119 of the Public Utilities Act; and` ``(2) located at a site that is regulated by any of the` `following entities under the following programs:` `(A) the United States Environmental Protection` `Agency under the federal Comprehensive Environmental` `Response, Compensation, and Liability Act of 1980, as` `amended;` `(B) the United States Environmental Protection` `Agency under the Corrective Action Program of the` `federal Resource Conservation and Recovery Act, as` `amended;` `(C) the Illinois Environmental Protection Agency` `under the Illinois Site Remediation Program; or` `(D) the Illinois Environmental Protection Agency` `under the Illinois Solid Waste Program. "Clean coal facility" means an electric generating` `facility that uses primarily coal as a feedstock and that` `captures and sequesters carbon dioxide emissions at the` `following levels: at least 50% of the total carbon dioxide` `emissions that the facility would otherwise emit if, at the` `time construction commences, the facility is scheduled to` `commence operation before 2016, at least 70% of the total` `carbon dioxide emissions that the facility would otherwise emit` `if, at the time construction commences, the facility is` `scheduled to commence operation during 2016 or 2017, and at` `least 90% of the total carbon dioxide emissions that the` `facility would otherwise emit if, at the time construction` `commences, the facility is scheduled to commence operation` `after 2017. The power block of the clean coal facility shall` `not exceed allowable emission rates for sulfur dioxide,` `nitrogen oxides, carbon monoxide, particulates and mercury for` `a natural gas-fired combined-cycle facility the same size as` `and in the same location as the clean coal facility at the time` `the clean coal facility obtains an approved air permit. All` `coal used by a clean coal facility shall have high volatile` `bituminous rank and greater than 1.7 pounds of sulfur per` `million btu content, unless the clean coal facility does not` `use gasification technology and was operating as a conventional` `coal-fired electric generating facility on June 1, 2009 (the` `effective date of Public Act 95-1027).` "Clean coal SNG brownfield facility" means a facility that` `(1) has commenced construction by July 1, 2015 on an urban` `brownfield site in a municipality with at least 1,000,000` `residents; (2) uses a gasification process to produce` `substitute natural gas; (3) uses coal as at least 50% of the` `total feedstock over the term of any sourcing agreement with a` `utility and the remainder of the feedstock may be either` `petroleum coke or coal, with all such coal having a high` `bituminous rank and greater than 1.7 pounds of sulfur per` `million Btu content unless the facility reasonably determines` `that it is necessary to use additional petroleum coke to` `deliver additional consumer savings, in which case the facility` `shall use coal for at least 35% of the total feedstock over the` `term of any sourcing agreement; and (4) captures and sequesters` `at least 85% of the total carbon dioxide emissions that the` `facility would otherwise emit.` "Clean coal SNG facility" means a facility that uses a` `gasification process to produce substitute natural gas, that` `sequesters at least 90% of the total carbon dioxide emissions` `that the facility would otherwise emit, that uses at least 90%` `coal as a feedstock, with all such coal having a high` `bituminous rank and greater than 1.7 pounds of sulfur per` `million btu content, and that has a valid and effective permit` `to construct emission sources and air pollution control` `equipment and approval with respect to the federal regulations` `for Prevention of Significant Deterioration of Air Quality` `(PSD) for the plant pursuant to the federal Clean Air Act;` `provided, however, a clean coal SNG brownfield facility shall` `not be a clean coal SNG facility.` "Commission" means the Illinois Commerce Commission.` "Community renewable generation project" means an electric` `generating facility that: ``(1) is powered by wind, solar thermal energy,` `photovoltaic cells or panels, biodiesel, crops and` `untreated and unadulterated organic waste biomass, tree` `waste, and hydropower that does not involve new` `construction or significant expansion of hydropower dams; ``(2) is interconnected at the distribution system level` `of an electric utility as defined in this Section, a` `municipal utility as defined in this Section that owns or` `operates electric distribution facilities, a public` `utility as defined in Section 3-105 of the Public Utilities` `Act, or an electric cooperative, as defined in Section` `3-119 of the Public Utilities Act;` ``(3) credits the value of electricity generated by the` `facility to the subscribers of the facility; and` ``(4) is limited in nameplate capacity to less than or` `equal to 2,000 kilowatts. "Costs incurred in connection with the development and` `construction of a facility" means:` ``(1) the cost of acquisition of all real property,` `fixtures, and improvements in connection therewith and` `equipment, personal property, and other property, rights,` `and easements acquired that are deemed necessary for the` `operation and maintenance of the facility;` ``(2) financing costs with respect to bonds, notes, and` `other evidences of indebtedness of the Agency;` ``(3) all origination, commitment, utilization,` `facility, placement, underwriting, syndication, credit` `enhancement, and rating agency fees;` ``(4) engineering, design, procurement, consulting,` `legal, accounting, title insurance, survey, appraisal,` `escrow, trustee, collateral agency, interest rate hedging,` `interest rate swap, capitalized interest, contingency, as` `required by lenders, and other financing costs, and other` `expenses for professional services; and` ``(5) the costs of plans, specifications, site study and` `investigation, installation, surveys, other Agency costs` `and estimates of costs, and other expenses necessary or` `incidental to determining the feasibility of any project,` `together with such other expenses as may be necessary or` `incidental to the financing, insuring, acquisition, and` `construction of a specific project and starting up,` `commissioning, and placing that project in operation.` "Delivery services" has the same definition as found in` `Section 16-102 of the Public Utilities Act. "Delivery year" means the consecutive 12-month period` `beginning June 1 of a given year and ending May 31 of the` `following year. "Department" means the Department of Commerce and Economic` `Opportunity.` "Director" means the Director of the Illinois Power Agency.` "Demand-response" means measures that decrease peak` `electricity demand or shift demand from peak to off-peak` `periods.` "Distributed renewable energy generation device" means a` `device that is:` ``(1) powered by wind, solar thermal energy,` `photovoltaic cells``or `and``panels, biodiesel, crops and` `untreated and unadulterated organic waste biomass, tree` `waste, and hydropower that does not involve new` `construction or significant expansion of hydropower dams;` ``(2) interconnected at the distribution system level of` `either an electric utility as defined in this Section,``an` `alternative retail electric supplier as defined in Section` `16-102 of the Public Utilities Act,``a municipal utility as` `defined in``this``Section``that owns or operates electric` `distribution facilities `3-105 of the Public Utilities Act``,` `or a rural electric cooperative as defined in Section 3-119` `of the Public Utilities Act;` ``(3) located on the customer side of the customer's` `electric meter and is primarily used to offset that` `customer's electricity load; and` ``(4) limited in nameplate capacity to``less than or equal` `to `no more than``2,000 kilowatts.` "Energy efficiency" means measures that reduce the amount` `of electricity or natural gas``consumed in order `required``to` `achieve a given end use.``"Energy efficiency" includes voltage` `optimization measures that optimize the voltage at points on` `the electric distribution voltage system and thereby reduce` `electricity consumption by electric customers' end use` `devices.``"Energy efficiency" also includes measures that` `reduce the total Btus of electricity``, `and``natural gas``, and` `other fuels``needed to meet the end use or uses.` "Electric utility" has the same definition as found in` `Section 16-102 of the Public Utilities Act.` "Facility" means an electric generating unit or a` `co-generating unit that produces electricity along with` `related equipment necessary to connect the facility to an` `electric transmission or distribution system.` "Governmental aggregator" means one or more units of local` `government that individually or collectively procure` `electricity to serve residential retail electrical loads` `located within its or their jurisdiction.` "Local government" means a unit of local government as` `defined in Section 1 of Article VII of the Illinois` `Constitution.` "Municipality" means a city, village, or incorporated` `town.` "Municipal utility" means a public utility owned and` `operated by any subdivision or municipal corporation of this` `State. "Nameplate capacity" means the aggregate inverter` `nameplate capacity in kilowatts AC. "Person" means any natural person, firm, partnership,` `corporation, either domestic or foreign, company, association,` `limited liability company, joint stock company, or association` `and includes any trustee, receiver, assignee, or personal` `representative thereof.` "Project" means the planning, bidding, and construction of` `a facility.` "Public utility" has the same definition as found in` `Section 3-105 of the Public Utilities Act.` "Real property" means any interest in land together with` `all structures, fixtures, and improvements thereon, including` `lands under water and riparian rights, any easements,` `covenants, licenses, leases, rights-of-way, uses, and other` `interests, together with any liens, judgments, mortgages, or` `other claims or security interests related to real property.` "Renewable energy credit" means a tradable credit that` `represents the environmental attributes of``one megawatt hour `a` `certain amount``of energy produced from a renewable energy` `resource.` "Renewable energy resources" includes energy and its` `associated renewable energy credit or renewable energy credits` `from wind, solar thermal energy, photovoltaic cells and panels,` `biodiesel, anaerobic digestion, crops and untreated and` `unadulterated organic waste biomass, tree waste,``and `hydropower that does not involve new construction or` `significant expansion of hydropower dams``, and other` `alternative sources of environmentally preferable energy``. For` `purposes of this Act, landfill gas produced in the State is` `considered a renewable energy resource. "Renewable energy` `resources" does not include the incineration or burning of` `tires, garbage, general household, institutional, and` `commercial waste, industrial lunchroom or office waste,` `landscape waste other than tree waste, railroad crossties,` `utility poles, or construction or demolition debris, other than` `untreated and unadulterated waste wood.` "Retail customer" has the same definition as found in` `Section 16-102 of the Public Utilities Act. "Revenue bond" means any bond, note, or other evidence of` `indebtedness issued by the Authority, the principal and` `interest of which is payable solely from revenues or income` `derived from any project or activity of the Agency.` "Sequester" means permanent storage of carbon dioxide by` `injecting it into a saline aquifer, a depleted gas reservoir,` `or an oil reservoir, directly or through an enhanced oil` `recovery process that may involve intermediate storage,` `regardless of whether these activities are conducted by a clean` `coal facility, a clean coal SNG facility, a clean coal SNG` `brownfield facility, or a party with which a clean coal` `facility, clean coal SNG facility, or clean coal SNG brownfield` `facility has contracted for such purposes.` "Service area" has the same definition as found in Section` `16-102 of the Public Utilities Act. "Sourcing agreement" means (i) in the case of an electric` `utility, an agreement between the owner of a clean coal` `facility and such electric utility, which agreement shall have` `terms and conditions meeting the requirements of paragraph (3)` `of subsection (d) of Section 1-75, (ii) in the case of an` `alternative retail electric supplier, an agreement between the` `owner of a clean coal facility and such alternative retail` `electric supplier, which agreement shall have terms and` `conditions meeting the requirements of Section 16-115(d)(5) of` `the Public Utilities Act, and (iii) in case of a gas utility,` `an agreement between the owner of a clean coal SNG brownfield` `facility and the gas utility, which agreement shall have the` `terms and conditions meeting the requirements of subsection` `(h-1) of Section 9-220 of the Public Utilities Act.` "Subscriber" means a person who (i) takes delivery service` `from an electric utility, and (ii) has a subscription of no` `less than 200 watts to a community renewable generation project` `that is located in the electric utility's service area. No` `subscriber's subscriptions may total more than 40% of the` `nameplate capacity of an individual community renewable` `generation project. Entities that are affiliated by virtue of a` `common parent shall not represent multiple subscriptions that` `total more than 40% of the nameplate capacity of an individual` `community renewable generation project.` "Subscription" means an interest in a community renewable` `generation project expressed in kilowatts, which is sized` `primarily to offset part or all of the subscriber's electricity` `usage. "Substitute natural gas" or "SNG" means a gas manufactured` `by gasification of hydrocarbon feedstock, which is` `substantially interchangeable in use and distribution with` `conventional natural gas. "Total resource cost test" or "TRC test" means a standard` `that is met if, for an investment in energy efficiency or` `demand-response measures, the benefit-cost ratio is greater` `than one. The benefit-cost ratio is the ratio of the net` `present value of the total benefits of the program to the net` `present value of the total costs as calculated over the` `lifetime of the measures. A total resource cost test compares` `the sum of avoided electric utility costs, representing the` `benefits that accrue to the system and the participant in the` `delivery of those efficiency measures``and including avoided` `costs associated with reduced use of natural gas or other` `fuels, avoided costs associated with reduced water` `consumption, and avoided costs associated with reduced` `operation and maintenance costs``, as well as other quantifiable` `societal benefits,``including avoided natural gas utility` `costs,``to the sum of all incremental costs of end-use measures` `that are implemented due to the program (including both utility` `and participant contributions), plus costs to administer,` `deliver, and evaluate each demand-side program, to quantify the` `net savings obtained by substituting the demand-side program` `for supply resources. In calculating avoided costs of power and` `energy that an electric utility would otherwise have had to` `acquire, reasonable estimates shall be included of financial` `costs likely to be imposed by future regulations and` `legislation on emissions of greenhouse gases.``In discounting` `future societal costs and benefits for the purpose of` `calculating net present values, a societal discount rate based` `on actual, long-term Treasury bond yields should be used.` `Notwithstanding anything to the contrary, the TRC test shall` `not include or take into account a calculation of market price` `suppression effects or demand reduction induced price effects. "Utility-scale solar project" means an electric generating` `facility that:` ``(1) generates electricity using photovoltaic cells;` `and` ``(2) has a nameplate capacity that is greater than 2,000` `kilowatts. "Utility-scale wind project" means an electric generating` `facility that:` ``(1) generates electricity using wind; and` ``(2) has a nameplate capacity that is greater than 2,000` `kilowatts. "Zero emission credit" means a tradable credit that` `represents the environmental attributes of one megawatt hour of` `energy produced from a zero emission facility.` "Zero emission facility" means a facility that: (1) is` `fueled by nuclear power; and (2) is interconnected with PJM` `Interconnection, LLC or the Midcontinent Independent System` `Operator, Inc., or their successors.` `(Source: P.A. 97-96, eff. 7-13-11; 97-239, eff. 8-2-11; 97-491,` `eff. 8-22-11; 97-616, eff. 10-26-11; 97-813, eff. 7-13-12;` `98-90, eff. 7-15-13.) (20 ILCS 3855/1-20) Sec. 1-20.``General powers of the Agency.` (a) The Agency is authorized to do each of the following:` ``(1) Develop electricity procurement plans to ensure` `adequate, reliable, affordable, efficient, and` `environmentally sustainable electric service at the lowest` `total cost over time, taking into account any benefits of` `price stability, for electric utilities that on December` `31, 2005 provided electric service to at least 100,000` `customers in Illinois and for small multi-jurisdictional` `electric utilities that (A) on December 31, 2005 served` `less than 100,000 customers in Illinois and (B) request a` `procurement plan for their Illinois jurisdictional load.` `Except as provided in paragraph (1.5) of this subsection` `(a), the electricity `The``procurement plans shall be updated` `on an annual basis and shall include electricity generated` `from renewable resources sufficient to achieve the` `standards specified in this Act.``Beginning with the` `delivery year commencing June 1, 2017, develop procurement` `plans to include zero emission credits generated from zero` `emission facilities sufficient to achieve the standards` `specified in this Act. ``(1.5) Develop a long-term renewable resources` `procurement plan in accordance with subsection (c) of` `Section 1-75 of this Act for renewable energy credits in` `amounts sufficient to achieve the standards specified in` `this Act for delivery years commencing June 1, 2017 and for` `the programs and renewable energy credits specified in` `Section 1-56 of this Act. Electricity procurement plans for` `delivery years commencing after May 31, 2017, shall not` `include procurement of renewable energy resources. ``(2) Conduct competitive procurement processes to` `procure the supply resources identified in the``electricity `procurement plan, pursuant to Section 16-111.5 of the` `Public Utilities Act``, and, for the delivery year commencing` `June 1, 2017, conduct procurement processes to procure zero` `emission credits from zero emission facilities, under` `subsection (d-5) of Section 1-75 of this Act``.` ``(2.5) Beginning with the procurement for the 2017` `delivery year, conduct competitive procurement processes` `and implement programs to procure renewable energy credits` `identified in the long-term renewable resources` `procurement plan developed and approved under subsection` `(c) of Section 1-75 of this Act and Section 16-111.5 of the` `Public Utilities Act. ``(3) Develop electric generation and co-generation` `facilities that use indigenous coal or renewable` `resources, or both, financed with bonds issued by the` `Illinois Finance Authority.` ``(4) Supply electricity from the Agency's facilities at` `cost to one or more of the following: municipal electric` `systems, governmental aggregators, or rural electric` `cooperatives in Illinois.` (b) Except as otherwise limited by this Act, the Agency has` `all of the powers necessary or convenient to carry out the` `purposes and provisions of this Act, including without` `limitation, each of the following:` ``(1) To have a corporate seal, and to alter that seal at` `pleasure, and to use it by causing it or a facsimile to be` `affixed or impressed or reproduced in any other manner.` ``(2) To use the services of the Illinois Finance` `Authority necessary to carry out the Agency's purposes.` ``(3) To negotiate and enter into loan agreements and` `other agreements with the Illinois Finance Authority.` ``(4) To obtain and employ personnel and hire consultants` `that are necessary to fulfill the Agency's purposes, and to` `make expenditures for that purpose within the` `appropriations for that purpose.` ``(5) To purchase, receive, take by grant, gift, devise,` `bequest, or otherwise, lease, or otherwise acquire, own,` `hold, improve, employ, use, and otherwise deal in and with,` `real or personal property whether tangible or intangible,` `or any interest therein, within the State.` ``(6) To acquire real or personal property, whether` `tangible or intangible, including without limitation` `property rights, interests in property, franchises,` `obligations, contracts, and debt and equity securities,` `and to do so by the exercise of the power of eminent domain` `in accordance with Section 1-21; except that any real` `property acquired by the exercise of the power of eminent` `domain must be located within the State.` ``(7) To sell, convey, lease, exchange, transfer,` `abandon, or otherwise dispose of, or mortgage, pledge, or` `create a security interest in, any of its assets,` `properties, or any interest therein, wherever situated.` ``(8) To purchase, take, receive, subscribe for, or` `otherwise acquire, hold, make a tender offer for, vote,` `employ, sell, lend, lease, exchange, transfer, or` `otherwise dispose of, mortgage, pledge, or grant a security` `interest in, use, and otherwise deal in and with, bonds and` `other obligations, shares, or other securities (or` `interests therein) issued by others, whether engaged in a` `similar or different business or activity.` ``(9) To make and execute agreements, contracts, and` `other instruments necessary or convenient in the exercise` `of the powers and functions of the Agency under this Act,` `including contracts with any person, including personal` `service contracts, or with any local government, State` `agency, or other entity; and all State agencies and all` `local governments are authorized to enter into and do all` `things necessary to perform any such agreement, contract,` `or other instrument with the Agency. No such agreement,` `contract, or other instrument shall exceed 40 years.` ``(10) To lend money, invest and reinvest its funds in` `accordance with the Public Funds Investment Act, and take` `and hold real and personal property as security for the` `payment of funds loaned or invested.` ``(11) To borrow money at such rate or rates of interest` `as the Agency may determine, issue its notes, bonds, or` `other obligations to evidence that indebtedness, and` `secure any of its obligations by mortgage or pledge of its` `real or personal property, machinery, equipment,` `structures, fixtures, inventories, revenues, grants, and` `other funds as provided or any interest therein, wherever` `situated.` ``(12) To enter into agreements with the Illinois Finance` `Authority to issue bonds whether or not the income` `therefrom is exempt from federal taxation.` ``(13) To procure insurance against any loss in` `connection with its properties or operations in such amount` `or amounts and from such insurers, including the federal` `government, as it may deem necessary or desirable, and to` `pay any premiums therefor.` ``(14) To negotiate and enter into agreements with` `trustees or receivers appointed by United States` `bankruptcy courts or federal district courts or in other` `proceedings involving adjustment of debts and authorize` `proceedings involving adjustment of debts and authorize` `legal counsel for the Agency to appear in any such` `proceedings.` ``(15) To file a petition under Chapter 9 of Title 11 of` `the United States Bankruptcy Code or take other similar` `action for the adjustment of its debts.` ``(16) To enter into management agreements for the` `operation of any of the property or facilities owned by the` `Agency.` ``(17) To enter into an agreement to transfer and to` `transfer any land, facilities, fixtures, or equipment of` `the Agency to one or more municipal electric systems,` `governmental aggregators, or rural electric agencies or` `cooperatives, for such consideration and upon such terms as` `the Agency may determine to be in the best interest of the` `citizens of Illinois.` ``(18) To enter upon any lands and within any building` `whenever in its judgment it may be necessary for the` `purpose of making surveys and examinations to accomplish` `any purpose authorized by this Act.` ``(19) To maintain an office or offices at such place or` `places in the State as it may determine.` ``(20) To request information, and to make any inquiry,` `investigation, survey, or study that the Agency may deem` `necessary to enable it effectively to carry out the` `provisions of this Act.` ``(21) To accept and expend appropriations.` ``(22) To engage in any activity or operation that is` `incidental to and in furtherance of efficient operation to` `accomplish the Agency's purposes, including hiring` `employees that the Director deems essential for the` `operations of the Agency.` ``(23) To adopt, revise, amend, and repeal rules with` `respect to its operations, properties, and facilities as` `may be necessary or convenient to carry out the purposes of` `this Act, subject to the provisions of the Illinois` `Administrative Procedure Act and Sections 1-22 and 1-35 of` `this Act.` ``(24) To establish and collect charges and fees as` `described in this Act. ``(25) To conduct competitive gasification feedstock` `procurement processes to procure the feedstocks for the` `clean coal SNG brownfield facility in accordance with the` `requirements of Section 1-78 of this Act.` ``(26) To review, revise, and approve sourcing` `agreements and mediate and resolve disputes between gas` `utilities and the clean coal SNG brownfield facility` `pursuant to subsection (h-1) of Section 9-220 of the Public` `Utilities Act.` ``(27) To request, review and accept proposals, execute` `contracts, purchase renewable energy credits and otherwise` `dedicate funds from the Illinois Power Agency Renewable` `Energy Resources Fund to create and carry out the` `objectives of the Illinois Solar for All program in` `accordance with Section 1-56 of this Act. `(Source: P.A. 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10;` `97-96, eff. 7-13-11; 97-325, eff. 8-12-11; 97-618, eff.` `10-26-11; 97-813, eff. 7-13-12.)` (20 ILCS 3855/1-25) Sec. 1-25.``Agency subject to other laws.``Unless otherwise` `stated, the Agency is subject to the provisions of all` `applicable laws, including but not limited to, each of the` `following:` ``(1) The State Records Act.` ``(2) The Illinois Procurement Code, except that the` `Illinois Procurement Code does not apply to the hiring``or` `payment``of procurement administrators``, `or``procurement` `planning consultants``, third-party program managers, or` `other persons who will implement the programs described in` `Sections 1-56 and `pursuant to Section``1-75 of the Illinois` `Power Agency Act.` ``(3) The Freedom of Information Act.` ``(4) The State Property Control Act.` ``(5) (Blank).` ``(6) The State Officials and Employees Ethics Act. `(Source: P.A. 97-618, eff. 10-26-11.)` (20 ILCS 3855/1-56)` Sec. 1-56.``Illinois Power Agency Renewable Energy` `Resources Fund``; Illinois Solar for All Program``.` (a) The Illinois Power Agency Renewable Energy Resources` `Fund is created as a special fund in the State treasury.` (b) The Illinois Power Agency Renewable Energy Resources` `Fund shall be administered by the Agency``as described in this` `subsection (b), provided that the changes to this subsection` `(b) made by this amendatory Act of the 99th General Assembly` `shall not interfere with existing contracts under this Section. ``(1) The Illinois Power Agency Renewable Energy` `Resources Fund shall be used to purchase renewable energy` `credits according to any approved procurement plan` `developed by the Agency prior to June 1, 2017.` ``(2) The Illinois Power Agency Renewable Energy` `Resources Fund shall also be used to create the Illinois` `Solar for All Program, which shall include incentives for` `low-income distributed generation and community solar` `projects, and other associated approved expenditures. The` `objectives of the Illinois Solar for All Program are to` `bring photovoltaics to low-income communities in this` `State in a manner that maximizes the development of new` `photovoltaic generating facilities, to create a long-term,` `low-income solar marketplace throughout this State, to` `integrate, through interaction with stakeholders, with` `existing energy efficiency initiatives, and to minimize` `administrative costs. The Agency shall include a` `description of its proposed approach to the design,` `administration, implementation and evaluation of the` `Illinois Solar for All Program, as part of the long-term` `renewable resources procurement plan authorized by` `subsection (c) of Section 1-75 of this Act, and the program` `shall be designed to grow the low-income solar market. The` `Agency or utility, as applicable, shall purchase renewable` `energy credits from the (i) photovoltaic distributed` `renewable energy generation projects and (ii) community` `solar projects that are procured under procurement` `processes authorized by the long-term renewable resources` `procurement plans approved by the Commission.` ``The Illinois Solar for All Program shall include the` `program offerings described in subparagraphs (A) through` `(D) of this paragraph (2), which the Agency shall implement` `through contracts with third-party providers and, subject` `to appropriation, pay the approximate amounts identified` `using monies available in the Illinois Power Agency` `Renewable Energy Resources Fund. Each contract that` `provides for the installation of solar facilities shall` `provide that the solar facilities will produce energy and` `economic benefits, at a level determined by the Agency to` `be reasonable, for the participating low income customers.` `The monies available in the Illinois Power Agency Renewable` `Energy Resources Fund and not otherwise committed to` `contracts executed under subsection (i) of this Section` `shall be allocated among the programs described in this` `paragraph (2), as follows: 22.5% of these funds shall be` `allocated to programs described in subparagraph (A) of this` `paragraph (2), 37.5% of these funds shall be allocated to` `programs described in subparagraph (B) of this paragraph` `(2), 15% of these funds shall be allocated to programs` `described in subparagraph (C) of this paragraph (2), and` `25% of these funds, but in no event more than $50,000,000,` `shall be allocated to programs described in subparagraph` `(D) of this paragraph (2). The allocation of funds among` `subparagraphs (A), (B), or (C) of this paragraph (2) may be` `changed if the Agency or administrator, through delegated` `authority, determines incentives in subparagraphs (A),` `(B), or (C) of this paragraph (2) have not been adequately` `subscribed to fully utilize the Illinois Power Agency` `Renewable Energy Resources Fund. The determination shall` `include input through a stakeholder process. The program` `offerings described in subparagraphs (A) through (D) of` `this paragraph (2) shall also be implemented through` `contracts funded from such additional amounts as are` `allocated to one or more of the programs in the long-term` `renewable resources procurement plans as specified in` `subsection (c) of Section 1-75 of this Act and subparagraph` `(O) of paragraph (1) of such subsection (c).` ``Contracts that will be paid with funds in the Illinois` `Power Agency Renewable Energy Resources Fund shall be` `executed by the Agency. Contracts that will be paid with` `funds collected by an electric utility shall be executed by` `the electric utility.` ``Contracts under the Illinois Solar for All Program` `shall include an approach, as set forth in the long-term` `renewable resources procurement plans, to ensure the` `wholesale market value of the energy is credited to` `participating low-income customers or organizations and to` `ensure tangible economic benefits flow directly to program` `participants, except in the case of low-income` `multi-family housing where the low-income customer does` `not directly pay for energy. Priority shall be given to` `projects that demonstrate meaningful involvement of` `low-income community members in designing the initial` `proposals. Acceptable proposals to implement projects must` `demonstrate the applicant's ability to conduct initial` `community outreach, education, and recruitment of` `low-income participants in the community. Projects must` `include job training opportunities if available, and shall` `endeavor to coordinate with the job training programs` `described in paragraph (1) of subsection (a) of Section` `16-108.12 of the Public Utilities Act. `(A) Low-income distributed generation incentive.` `This program will provide incentives to low-income` `customers, either directly or through solar providers,` `to increase the participation of low-income households` `in photovoltaic on-site distributed generation.` `Companies participating in this program that install` `solar panels shall commit to hiring job trainees for a` `portion of their low-income installations, and an` `administrator shall facilitate partnering the` `companies that install solar panels with entities that` `provide solar panel installation job training. It is a` `goal of this program that a minimum of 25% of the` `incentives for this program be allocated to projects` `located within environmental justice communities.` `Contracts entered into under this paragraph may be` `entered into with an entity that will develop and` `administer the program and shall also include` `contracts for renewable energy credits from the` `photovoltaic distributed generation that is the` `subject of the program, as set forth in the long-term` `renewable resources procurement plan.` `(B) Low-Income Community Solar Project Initiative.` `Incentives shall be offered to low-income customers,` `either directly or through developers, to increase the` `participation of low-income subscribers of community` `solar projects. The developer of each project shall` `identify its partnership with community stakeholders` `regarding the location, development, and participation` `in the project, provided that nothing shall preclude a` `project from including an anchor tenant that does not` `qualify as low-income. Incentives should also be` `offered to community solar projects that are 100%` `low-income subscriber owned, which includes low-income` `households, not-for-profit organizations, and` `affordable housing owners. It is a goal of this program` `that a minimum of 25% of the incentives for this` `program be allocated to community photovoltaic` `projects in environmental justice communities.` `Contracts entered into under this paragraph may be` `entered into with developers and shall also include` `contracts for renewable energy credits related to the` `program.` `(C) Incentives for non-profits and public` `facilities. Under this program funds shall be used to` `support on-site photovoltaic distributed renewable` `energy generation devices to serve the load associated` `with not-for-profit customers and to support` `photovoltaic distributed renewable energy generation` `that uses photovoltaic technology to serve the load` `associated with public sector customers taking service` `at public buildings. It is a goal of this program that` `at least 25% of the incentives for this program be` `allocated to projects located in environmental justice` `communities. Contracts entered into under this` `paragraph may be entered into with an entity that will` `develop and administer the program or with developers` `and shall also include contracts for renewable energy` `credits related to the program.` `(D) Low-Income Community Solar Pilot Projects.` `Under this program, persons, including, but not` `limited to, electric utilities, shall propose pilot` `community solar projects. Community solar projects` `proposed under this subparagraph (D) may exceed 2,000` `kilowatts in nameplate capacity, but the amount paid` `per project under this program may not exceed` `$20,000,000. Pilot projects must result in economic` `benefits for the members of the community in which the` `project will be located. The proposed pilot project` `must include a partnership with at least one` `community-based organization. Approved pilot projects` `shall be competitively bid by the Agency, subject to` `fair and equitable guidelines developed by the Agency.` `Funding available under this subparagraph (D) may not` `be distributed solely to a utility, and at least some` `funds under this subparagraph (D) must include a` `project partnership that includes community ownership` `by the project subscribers. Contracts entered into` `under this paragraph may be entered into with an entity` `that will develop and administer the program or with` `developers and shall also include contracts for` `renewable energy credits related to the program. A` `project proposed by a utility that is implemented under` `this subparagraph (D) shall not be included in the` `utility's ratebase. ``The requirement that a qualified person, as defined in` `paragraph (1) of subsection (i) of this Section, install` `photovoltaic devices does not apply to the Illinois Solar` `for All Program described in this subsection (b). ``(3) Costs associated with the Illinois Solar for All` `Program and its components described in paragraph (2) of` `this subsection (b), including, but not limited to, costs` `associated with procuring experts, consultants, and the` `program administrator referenced in this subsection (b)` `and related incremental costs, and costs related to the` `evaluation of the Illinois Solar for All Program, may be` `paid for using monies in the Illinois Power Agency` `Renewable Energy Resources Fund, but the Agency or program` `administrator shall strive to minimize costs in the` `implementation of the program. The Agency shall purchase` `renewable energy credits from generation that is the` `subject of a contract under subparagraphs (A) through (D)` `of this paragraph (2) of this subsection (b), and may pay` `for such renewable energy credits through an upfront` `payment per installed kilowatt of nameplate capacity paid` `once the device is interconnected at the distribution` `system level of the utility and is energized. The payment` `shall be in exchange for an assignment of all renewable` `energy credits generated by the system during the first 15` `years of operation and shall be structured to overcome` `barriers to participation in the solar market by the` `low-income community. The incentives provided for in this` `Section may be implemented through the pricing of renewable` `energy credits where the prices paid for the credits are` `higher than the prices from programs offered under` `subsection (c) of Section 1-75 of this Act to account for` `the incentives. The Agency shall ensure collaboration with` `community agencies, and allocate up to 5% of the funds` `available under the Illinois Solar for All Program to` `community-based groups to assist in grassroots education` `efforts related to the Illinois Solar for All Program. The` `Agency shall retire any renewable energy credits purchased` `from this program and the credits shall count towards the` `obligation under subsection (c) of Section 1-75 of this Act` `for the electric utility to which the project is` `interconnected.` ``(4) The Agency shall, consistent with the requirements` `of this subsection (b), propose the Illinois Solar for All` `Program terms, conditions, and requirements, including the` `prices to be paid for renewable energy credits, and which` `prices may be determined through a formula, through the` `development, review, and approval of the Agency's` `long-term renewable resources procurement plan described` `in subsection (c) of Section 1-75 of this Act and Section` `16-111.5 of the Public Utilities Act. In the course of the` `Commission proceeding initiated to review and approve the` `plan, including the Illinois Solar for All Program proposed` `by the Agency, a party may propose an additional low-income` `solar or solar incentive program, or modifications to the` `programs proposed by the Agency, and the Commission may` `approve an additional program, or modifications to the` `Agency's proposed program, if the additional or modified` `program more effectively maximizes the benefits to` `low-income customers after taking into account all` `relevant factors, including, but not limited to, the extent` `to which a competitive market for low-income solar has` `developed. Following the Commission's approval of the` `Illinois Solar for All Program, the Agency or a party may` `propose adjustments to the program terms, conditions, and` `requirements, including the price offered to new systems,` `to ensure the long-term viability and success of the` `program. The Commission shall review and approve any` `modifications to the program through the plan revision` `process described in Section 16-111.5 of the Public` `Utilities Act.` ``(5) The Agency shall issue a request for qualifications` `for a third-party program administrator or administrators` `to administer all or a portion of the Illinois Solar for` `All Program. The third-party program administrator shall` `be chosen through a competitive bid process based on` `selection criteria and requirements developed by the` `Agency, including, but not limited to, experience in` `administering low-income energy programs and overseeing` `statewide clean energy or energy efficiency services. If` `the Agency retains a program administrator or` `administrators to implement all or a portion of the` `Illinois Solar for All Program, each administrator shall` `periodically submit reports to the Agency and Commission` `for each program that it administers, at appropriate` `intervals to be identified by the Agency in its long-term` `renewable resources procurement plan, provided that the` `reporting interval is at least quarterly.` ``(6) The long-term renewable resources procurement plan` `shall also provide for an independent evaluation of the` `Illinois Solar for All Program. At least every 2 years, the` `Agency shall select an independent evaluator to review and` `report on the Illinois Solar for All Program and the` `performance of the third-party program administrator of` `the Illinois Solar for All Program. The evaluation shall be` `based on objective criteria developed through a public` `stakeholder process. The process shall include feedback` `and participation from Illinois Solar for All Program` `stakeholders, including participants and organizations in` `environmental justice and historically underserved` `communities. The report shall include a summary of the` `evaluation of the Illinois Solar for All Program based on` `the stakeholder developed objective criteria. The report` `shall include the number of projects installed; the total` `installed capacity in kilowatts; the average cost per` `kilowatt of installed capacity to the extent reasonably` `obtainable by the Agency; the number of jobs or job` `opportunities created; economic, social, and environmental` `benefits created; and the total administrative costs` `expended by the Agency and program administrator to` `implement and evaluate the program. The report shall be` `delivered to the Commission and posted on the Agency's` `website, and shall be used, as needed, to revise the` `Illinois Solar for All Program. The Commission shall also` `consider the results of the evaluation as part of its` `review of the long-term renewable resources procurement` `plan under subsection (c) of Section 1-75 of this Act.` ``(7) If additional funding for the programs described in` `this subsection (b) is available under subsection (k) of` `Section 16-108 of the Public Utilities Act, then the Agency` `shall submit a procurement plan to the Commission no later` `than September 1, 2018, that proposes how the Agency will` `procure programs on behalf of the applicable utility. After` `notice and hearing, the Commission shall approve, or` `approve with modification, the plan no later than November` `1, 2018.` As used in this subsection (b), "low-income households"` `means persons and families whose income does not exceed 80% of` `area median income, adjusted for family size and revised every` `5 years.` For the purposes of this subsection (b), the Agency shall` `define "environmental justice community" as part of long-term` `renewable resources procurement plan development, to ensure,` `to the extent practicable, compatibility with other agencies'` `definitions and may, for guidance, look to the definitions used` `by federal, state, or local governments. (b-5) After the receipt of all payments required by Section` `16-115D of the Public Utilities Act, no additional funds shall` `be deposited into the Illinois Power Agency Renewable Energy` `Resources Fund unless directed by order of the Commission.` (b-10) After the receipt of all payments required by` `Section 16-115D of the Public Utilities Act and payment in full` `of all contracts executed by the Agency under subsections (b)` `and (i) of this Section, if the balance of the Illinois Power` `Agency Renewable Energy Resources Fund is under $5,000, then` `the Fund shall be inoperative and any remaining funds and any` `funds submitted to the Fund after that date, shall be` `transferred to the Supplemental Low-Income Energy Assistance` `Fund for use in the Low-Income Home Energy Assistance Program,` `as authorized by the Energy Assistance Act. `to procure` `renewable energy resources. Prior to June 1, 2011, resources` `procured pursuant to this Section shall be procured from` `facilities located in Illinois, provided the resources are` `available from those facilities. If resources are not available` `in Illinois, then they shall be procured in states that adjoin` `Illinois. If resources are not available in Illinois or in` `states that adjoin Illinois, then they may be purchased` `elsewhere. Beginning June 1, 2011, resources procured pursuant` `to this Section shall be procured from facilities located in` `Illinois or states that adjoin Illinois. If resources are not` `available in Illinois or in states that adjoin Illinois, then` `they may be procured elsewhere. To the extent available, at` `least 75% of these renewable energy resources shall come from` `wind generation. Of the renewable energy resources procured` `pursuant to this Section at least the following specified` `percentages shall come from photovoltaics on the following` `schedule: 0.5% by June 1, 2012; 1.5% by June 1, 2013; 3% by` `June 1, 2014; and 6% by June 1, 2015 and thereafter. Of the` `renewable energy resources procured pursuant to this Section,` `at least the following percentages shall come from distributed` `renewable energy generation devices: 0.5% by June 1, 2013,` `0.75% by June 1, 2014, and 1% by June 1, 2015 and thereafter.` `To the extent available, half of the renewable energy resources` `procured from distributed renewable energy generation shall` `come from devices of less than 25 kilowatts in nameplate` `capacity. Renewable energy resources procured from distributed` `generation devices may also count towards the required` `percentages for wind and solar photovoltaics. Procurement of` `renewable energy resources from distributed renewable energy` `generation devices shall be done on an annual basis through` `multi-year contracts of no less than 5 years, and shall consist` `solely of renewable energy credits.` The Agency shall create credit requirements for suppliers` `of distributed renewable energy. In order to minimize the` `administrative burden on contracting entities, the Agency` `shall solicit the use of third-party organizations to aggregate` `distributed renewable energy into groups of no less than one` `megawatt in installed capacity. These third-party` `organizations shall administer contracts with individual` `distributed renewable energy generation device owners. An` `individual distributed renewable energy generation device` `owner shall have the ability to measure the output of his or` `her distributed renewable energy generation device. (c)``(Blank). `The Agency shall procure renewable energy` `resources at least once each year in conjunction with a` `procurement event for electric utilities required to comply` `with Section 1-75 of the Act and shall, whenever possible,` `enter into long-term contracts on an annual basis for a portion` `of the incremental requirement for the given procurement year.` (d)``(Blank). `The price paid to procure renewable energy` `credits using monies from the Illinois Power Agency Renewable` `Energy Resources Fund shall not exceed the winning bid prices` `paid for like resources procured for electric utilities` `required to comply with Section 1-75 of this Act.` (e) All renewable energy credits procured using monies from` `the Illinois Power Agency Renewable Energy Resources Fund shall` `be permanently retired.` (f)``The selection of one or more third-party program` `managers or administrators, the selection of the independent` `evaluator, and the procurement processes described in this` `Section are exempt from the requirements of the Illinois` `Procurement Code, under Section 20-10 of that Code. `The` `procurement process described in this Section is exempt from` `the requirements of the Illinois Procurement Code, pursuant to` `Section 20-10 of that Code.` (g) All disbursements from the Illinois Power Agency` `Renewable Energy Resources Fund shall be made only upon` `warrants of the Comptroller drawn upon the Treasurer as` `custodian of the Fund upon vouchers signed by the Director or` `by the person or persons designated by the Director for that` `purpose. The Comptroller is authorized to draw the warrant upon` `vouchers so signed. The Treasurer shall accept all warrants so` `signed and shall be released from liability for all payments` `made on those warrants.` (h) The Illinois Power Agency Renewable Energy Resources` `Fund shall not be subject to sweeps, administrative charges, or` `chargebacks, including, but not limited to, those authorized` `under Section 8h of the State Finance Act, that would in any` `way result in the transfer of any funds from this Fund to any` `other fund of this State or in having any such funds utilized` `for any purpose other than the express purposes set forth in` `this Section. (h-5) The Agency may assess fees to each bidder to recover` `the costs incurred in connection with a procurement process` `held under this Section. Fees collected from bidders shall be` `deposited into the Renewable Energy Resources Fund. (i) Supplemental procurement process.` ``(1) Within 90 days after the effective date of this` `amendatory Act of the 98th General Assembly, the Agency` `shall develop a one-time supplemental procurement plan` `limited to the procurement of renewable energy credits, if` `available, from new or existing photovoltaics, including,` `but not limited to, distributed photovoltaic generation.` `Nothing in this subsection (i) requires procurement of wind` `generation through the supplemental procurement.` ``Renewable energy credits procured from new` `photovoltaics, including, but not limited to, distributed` `photovoltaic generation, under this subsection (i) must be` `procured from devices installed by a qualified person. In` `its supplemental procurement plan, the Agency shall` `establish contractually enforceable mechanisms for` `ensuring that the installation of new photovoltaics is` `performed by a qualified person.` ``For the purposes of this paragraph (1), "qualified` `person" means a person who performs installations of` `photovoltaics, including, but not limited to, distributed` `photovoltaic generation, and who: (A) has completed an` `apprenticeship as a journeyman electrician from a United` `States Department of Labor registered electrical` `apprenticeship and training program and received a` `certification of satisfactory completion; or (B) does not` `currently meet the criteria under clause (A) of this` `paragraph (1), but is enrolled in a United States` `Department of Labor registered electrical apprenticeship` `program, provided that the person is directly supervised by` `a person who meets the criteria under clause (A) of this` `paragraph (1); or (C) has obtained one of the following` `credentials in addition to attesting to satisfactory` `completion of at least 5 years or 8,000 hours of documented` `hands-on electrical experience: (i) a North American Board` `of Certified Energy Practitioners (NABCEP) Installer` `Certificate for Solar PV; (ii) an Underwriters` `Laboratories (UL) PV Systems Installer Certificate; (iii)` `an Electronics Technicians Association, International` `(ETAI) Level 3 PV Installer Certificate; or (iv) an` `Associate in Applied Science degree from an Illinois` `Community College Board approved community college program` `in renewable energy or a distributed generation` `technology.` ``For the purposes of this paragraph (1), "directly` `supervised" means that there is a qualified person who` `meets the qualifications under clause (A) of this paragraph` `(1) and who is available for supervision and consultation` `regarding the work performed by persons under clause (B) of` `this paragraph (1), including a final inspection of the` `installation work that has been directly supervised to` `ensure safety and conformity with applicable codes.` ``For the purposes of this paragraph (1), "install" means` `the major activities and actions required to connect, in` `accordance with applicable building and electrical codes,` `the conductors, connectors, and all associated fittings,` `devices, power outlets, or apparatuses mounted at the` `premises that are directly involved in delivering energy to` `the premises' electrical wiring from the photovoltaics,` `including, but not limited to, to distributed photovoltaic` `generation.` ``The renewable energy credits procured pursuant to the` `supplemental procurement plan shall be procured using up to` `$30,000,000 from the Illinois Power Agency Renewable` `Energy Resources Fund. The Agency shall not plan to use` `funds from the Illinois Power Agency Renewable Energy` `Resources Fund in excess of the monies on deposit in such` `fund or projected to be deposited into such fund. The` `supplemental procurement plan shall ensure adequate,` `reliable, affordable, efficient, and environmentally` `sustainable renewable energy resources (including credits)` `at the lowest total cost over time, taking into account any` `benefits of price stability.` ``To the extent available, 50% of the renewable energy` `credits procured from distributed renewable energy` `generation shall come from devices of less than 25` `kilowatts in nameplate capacity. Procurement of renewable` `energy credits from distributed renewable energy` `generation devices shall be done through multi-year` `contracts of no less than 5 years. The Agency shall create` `credit requirements for counterparties. In order to` `minimize the administrative burden on contracting` `entities, the Agency shall solicit the use of third parties` `to aggregate distributed renewable energy. These third` `parties shall enter into and administer contracts with` `individual distributed renewable energy generation device` `owners. An individual distributed renewable energy` `generation device owner shall have the ability to measure` `the output of his or her distributed renewable energy` `generation device.` ``In developing the supplemental procurement plan, the` `Agency shall hold at least one workshop open to the public` `within 90 days after the effective date of this amendatory` `Act of the 98th General Assembly and shall consider any` `comments made by stakeholders or the public. Upon` `development of the supplemental procurement plan within` `this 90-day period, copies of the supplemental procurement` `plan shall be posted and made publicly available on the` `Agency's and Commission's websites. All interested parties` `shall have 14 days following the date of posting to provide` `comment to the Agency on the supplemental procurement plan.` `All comments submitted to the Agency shall be specific,` `supported by data or other detailed analyses, and, if` `objecting to all or a portion of the supplemental` `procurement plan, accompanied by specific alternative` `wording or proposals. All comments shall be posted on the` `Agency's and Commission's websites. Within 14 days` `following the end of the 14-day review period, the Agency` `shall revise the supplemental procurement plan as` `necessary based on the comments received and file its` `revised supplemental procurement plan with the Commission` `for approval.` ``(2) Within 5 days after the filing of the supplemental` `procurement plan at the Commission, any person objecting to` `the supplemental procurement plan shall file an objection` `with the Commission. Within 10 days after the filing, the` `Commission shall determine whether a hearing is necessary.` `The Commission shall enter its order confirming or` `modifying the supplemental procurement plan within 90 days` `after the filing of the supplemental procurement plan by` `the Agency.` ``(3) The Commission shall approve the supplemental` `procurement plan of renewable energy credits to be procured` `from new or existing photovoltaics, including, but not` `limited to, distributed photovoltaic generation, if the` `Commission determines that it will ensure adequate,` `reliable, affordable, efficient, and environmentally` `sustainable electric service in the form of renewable` `energy credits at the lowest total cost over time, taking` `into account any benefits of price stability.` ``(4) The supplemental procurement process under this` `subsection (i) shall include each of the following` `components:` `(A) Procurement administrator. The Agency may` `retain a procurement administrator in the manner set` `forth in item (2) of subsection (a) of Section 1-75 of` `this Act to conduct the supplemental procurement or may` `elect to use the same procurement administrator` `administering the Agency's annual procurement under` `Section 1-75.` `(B) Procurement monitor. The procurement monitor` `retained by the Commission pursuant to Section` `16-111.5 of the Public Utilities Act shall:` (i) monitor interactions among the procurement` `administrator and bidders and suppliers;` (ii) monitor and report to the Commission on` `the progress of the supplemental procurement` `process;` (iii) provide an independent confidential` `report to the Commission regarding the results of` `the procurement events;` (iv) assess compliance with the procurement` `plan approved by the Commission for the` `supplemental procurement process;` (v) preserve the confidentiality of supplier` `and bidding information in a manner consistent` `with all applicable laws, rules, regulations, and` `tariffs;` (vi) provide expert advice to the Commission` `and consult with the procurement administrator` `regarding issues related to procurement process` `design, rules, protocols, and policy-related` `matters;` (vii) consult with the procurement` `administrator regarding the development and use of` `benchmark criteria, standard form contracts,` `credit policies, and bid documents; and` (viii) perform, with respect to the` `supplemental procurement process, any other` `procurement monitor duties specifically delineated` `within subsection (i) of this Section.` `(C) Solicitation, pre-qualification, and` `registration of bidders. The procurement administrator` `shall disseminate information to potential bidders to` `promote a procurement event, notify potential bidders` `that the procurement administrator may enter into a` `post-bid price negotiation with bidders that meet the` `applicable benchmarks, provide supply requirements,` `and otherwise explain the competitive procurement` `process. In addition to such other publication as the` `procurement administrator determines is appropriate,` `this information shall be posted on the Agency's and` `the Commission's websites. The procurement` `administrator shall also administer the` `prequalification process, including evaluation of` `credit worthiness, compliance with procurement rules,` `and agreement to the standard form contract developed` `pursuant to item (D) of this paragraph (4). The` `procurement administrator shall then identify and` `register bidders to participate in the procurement` `event.` `(D) Standard contract forms and credit terms and` `instruments. The procurement administrator, in` `consultation with the Agency, the Commission, and` `other interested parties and subject to Commission` `oversight, shall develop and provide standard contract` `forms for the supplier contracts that meet generally` `accepted industry practices as well as include any` `applicable State of Illinois terms and conditions that` `are required for contracts entered into by an agency of` `the State of Illinois. Standard credit terms and` `instruments that meet generally accepted industry` `practices shall be similarly developed. Contracts for` `new photovoltaics shall include a provision attesting` `that the supplier will use a qualified person for the` `installation of the device pursuant to paragraph (1) of` `subsection (i) of this Section. The procurement` `administrator shall make available to the Commission` `all written comments it receives on the contract forms,` `credit terms, or instruments. If the procurement` `administrator cannot reach agreement with the parties` `as to the contract terms and conditions, the` `procurement administrator must notify the Commission` `of any disputed terms and the Commission shall resolve` `the dispute. The terms of the contracts shall not be` `subject to negotiation by winning bidders, and the` `bidders must agree to the terms of the contract in` `advance so that winning bids are selected solely on the` `basis of price.` `(E) Requests for proposals; competitive` `procurement process. The procurement administrator` `shall design and issue requests for proposals to supply` `renewable energy credits in accordance with the` `supplemental procurement plan, as approved by the` `Commission. The requests for proposals shall set forth` `a procedure for sealed, binding commitment bidding` `with pay-as-bid settlement, and provision for` `selection of bids on the basis of price, provided,` `however, that no bid shall be accepted if it exceeds` `the benchmark developed pursuant to item (F) of this` `paragraph (4).` `(F) Benchmarks. Benchmarks for each product to be` `procured shall be developed by the procurement` `administrator in consultation with Commission staff,` `the Agency, and the procurement monitor for use in this` `supplemental procurement.` `(G) A plan for implementing contingencies in the` `event of supplier default, Commission rejection of` `results, or any other cause.` ``(5) Within 2 business days after opening the sealed` `bids, the procurement administrator shall submit a` `confidential report to the Commission. The report shall` `contain the results of the bidding for each of the products` `along with the procurement administrator's recommendation` `for the acceptance and rejection of bids based on the price` `benchmark criteria and other factors observed in the` `process. The procurement monitor also shall submit a` `confidential report to the Commission within 2 business` `days after opening the sealed bids. The report shall` `contain the procurement monitor's assessment of bidder` `behavior in the process as well as an assessment of the` `procurement administrator's compliance with the` `procurement process and rules. The Commission shall review` `the confidential reports submitted by the procurement` `administrator and procurement monitor and shall accept or` `reject the recommendations of the procurement` `administrator within 2 business days after receipt of the` `reports.` ``(6) Within 3 business days after the Commission` `decision approving the results of a procurement event, the` `Agency shall enter into binding contractual arrangements` `with the winning suppliers using the standard form` `contracts.` ``(7) The names of the successful bidders and the average` `of the winning bid prices for each contract type and for` `each contract term shall be made available to the public` `within 2 days after the supplemental procurement event. The` `Commission, the procurement monitor, the procurement` `administrator, the Agency, and all participants in the` `procurement process shall maintain the confidentiality of` `all other supplier and bidding information in a manner` `consistent with all applicable laws, rules, regulations,` `and tariffs. Confidential information, including the` `confidential reports submitted by the procurement` `administrator and procurement monitor pursuant to this` `Section, shall not be made publicly available and shall not` `be discoverable by any party in any proceeding, absent a` `compelling demonstration of need, nor shall those reports` `be admissible in any proceeding other than one for law` `enforcement purposes.` ``(8) The supplemental procurement provided in this` `subsection (i) shall not be subject to the requirements and` `limitations of subsections (c) and (d) of this Section.` ``(9) Expenses incurred in connection with the` `procurement process held pursuant to this Section,` `including, but not limited to, the cost of developing the` `supplemental procurement plan, the procurement` `administrator, procurement monitor, and the cost of the` `retirement of renewable energy credits purchased pursuant` `to the supplemental procurement shall be paid for from the` `Illinois Power Agency Renewable Energy Resources Fund. The` `Agency shall enter into an interagency agreement with the` `Commission to reimburse the Commission for its costs` `associated with the procurement monitor for the` `supplemental procurement process.` `(Source: P.A. 97-616, eff. 10-26-11; 98-672, eff. 6-30-14.)` (20 ILCS 3855/1-75)` Sec. 1-75.``Planning and Procurement Bureau.``The Planning` `and Procurement Bureau has the following duties and` `responsibilities:` (a) The Planning and Procurement Bureau shall each year,` `beginning in 2008, develop procurement plans and conduct` `competitive procurement processes in accordance with the` `requirements of Section 16-111.5 of the Public Utilities Act` `for the eligible retail customers of electric utilities that on` `December 31, 2005 provided electric service to at least 100,000` `customers in Illinois.``Beginning with the delivery year` `commencing on June 1, 2017, the Planning and Procurement Bureau` `shall develop plans and processes for the procurement of zero` `emission credits from zero emission facilities in accordance` `with the requirements of subsection (d-5) of this Section.``The` `Planning and Procurement Bureau shall also develop procurement` `plans and conduct competitive procurement processes in` `accordance with the requirements of Section 16-111.5 of the` `Public Utilities Act for the eligible retail customers of small` `multi-jurisdictional electric utilities that (i) on December` `31, 2005 served less than 100,000 customers in Illinois and` `(ii) request a procurement plan for their Illinois` `jurisdictional load. This Section shall not apply to a small` `multi-jurisdictional utility until such time as a small` `multi-jurisdictional utility requests the Agency to prepare a` `procurement plan for their Illinois jurisdictional load. For` `the purposes of this Section, the term "eligible retail` `customers" has the same definition as found in Section` `16-111.5(a) of the Public Utilities Act.` Beginning with the plan or plans to be implemented in the` `2017 delivery year, the Agency shall no longer include the` `procurement of renewable energy resources in the annual` `procurement plans required by this subsection (a), except as` `provided in subsection (q) of Section 16-111.5 of the Public` `Utilities Act, and shall instead develop a long-term renewable` `resources procurement plan in accordance with subsection (c) of` `this Section and Section 16-111.5 of the Public Utilities Act. ``(1) The Agency shall each year, beginning in 2008, as` `needed, issue a request for qualifications for experts or` `expert consulting firms to develop the procurement plans in` `accordance with Section 16-111.5 of the Public Utilities` `Act. In order to qualify an expert or expert consulting` `firm must have:` `(A) direct previous experience assembling` `large-scale power supply plans or portfolios for` `end-use customers;` `(B) an advanced degree in economics, mathematics,` `engineering, risk management, or a related area of` `study;` `(C) 10 years of experience in the electricity` `sector, including managing supply risk;` `(D) expertise in wholesale electricity market` `rules, including those established by the Federal` `Energy Regulatory Commission and regional transmission` `organizations;` `(E) expertise in credit protocols and familiarity` `with contract protocols;` `(F) adequate resources to perform and fulfill the` `required functions and responsibilities; and` `(G) the absence of a conflict of interest and` `inappropriate bias for or against potential bidders or` `the affected electric utilities.` ``(2) The Agency shall each year, as needed, issue a` `request for qualifications for a procurement administrator` `to conduct the competitive procurement processes in` `accordance with Section 16-111.5 of the Public Utilities` `Act. In order to qualify an expert or expert consulting` `firm must have:` `(A) direct previous experience administering a` `large-scale competitive procurement process;` `(B) an advanced degree in economics, mathematics,` `engineering, or a related area of study;` `(C) 10 years of experience in the electricity` `sector, including risk management experience;` `(D) expertise in wholesale electricity market` `rules, including those established by the Federal` `Energy Regulatory Commission and regional transmission` `organizations;` `(E) expertise in credit and contract protocols;` `(F) adequate resources to perform and fulfill the` `required functions and responsibilities; and` `(G) the absence of a conflict of interest and` `inappropriate bias for or against potential bidders or` `the affected electric utilities.` ``(3) The Agency shall provide affected utilities and` `other interested parties with the lists of qualified` `experts or expert consulting firms identified through the` `request for qualifications processes that are under` `consideration to develop the procurement plans and to serve` `as the procurement administrator. The Agency shall also` `provide each qualified expert's or expert consulting` `firm's response to the request for qualifications. All` `information provided under this subparagraph shall also be` `provided to the Commission. The Agency may provide by rule` `for fees associated with supplying the information to` `utilities and other interested parties. These parties` `shall, within 5 business days, notify the Agency in writing` `if they object to any experts or expert consulting firms on` `the lists. Objections shall be based on:` `(A) failure to satisfy qualification criteria;` `(B) identification of a conflict of interest; or` `(C) evidence of inappropriate bias for or against` `potential bidders or the affected utilities.` ``The Agency shall remove experts or expert consulting` `firms from the lists within 10 days if there is a` `reasonable basis for an objection and provide the updated` `lists to the affected utilities and other interested` `parties. If the Agency fails to remove an expert or expert` `consulting firm from a list, an objecting party may seek` `review by the Commission within 5 days thereafter by filing` `a petition, and the Commission shall render a ruling on the` `petition within 10 days. There is no right of appeal of the` `Commission's ruling.` ``(4) The Agency shall issue requests for proposals to` `the qualified experts or expert consulting firms to develop` `a procurement plan for the affected utilities and to serve` `as procurement administrator.` ``(5) The Agency shall select an expert or expert` `consulting firm to develop procurement plans based on the` `proposals submitted and shall award contracts of up to 5` `years to those selected.` ``(6) The Agency shall select an expert or expert` `consulting firm, with approval of the Commission, to serve` `as procurement administrator based on the proposals` `submitted. If the Commission rejects, within 5 days, the` `Agency's selection, the Agency shall submit another` `recommendation within 3 days based on the proposals` `submitted. The Agency shall award a 5-year contract to the` `expert or expert consulting firm so selected with` `Commission approval.` (b) The experts or expert consulting firms retained by the` `Agency shall, as appropriate, prepare procurement plans, and` `conduct a competitive procurement process as prescribed in` `Section 16-111.5 of the Public Utilities Act, to ensure` `adequate, reliable, affordable, efficient, and environmentally` `sustainable electric service at the lowest total cost over` `time, taking into account any benefits of price stability, for` `eligible retail customers of electric utilities that on` `December 31, 2005 provided electric service to at least 100,000` `customers in the State of Illinois, and for eligible Illinois` `retail customers of small multi-jurisdictional electric` `utilities that (i) on December 31, 2005 served less than` `100,000 customers in Illinois and (ii) request a procurement` `plan for their Illinois jurisdictional load.` (c) Renewable portfolio standard.` ``(1)``(A) The Agency shall develop a long-term renewable` `resources procurement plan that shall include procurement` `programs and competitive procurement events necessary to` `meet the goals set forth in this subsection (c). The` `initial long-term renewable resources procurement plan` `shall be released for comment no later than 160 days after` `the effective date of this amendatory Act of the 99th` `General Assembly. The Agency shall review, and may revise` `on an expedited basis, the long-term renewable resources` `procurement plan at least every 2 years, which shall be` `conducted in conjunction with the procurement plan under` `Section 16-111.5 of the Public Utilities Act to the extent` `practicable to minimize administrative expense. The` `long-term renewable resources procurement plans shall be` `subject to review and approval by the Commission under` `Section 16-111.5 of the Public Utilities Act.` ``(B) Subject to subparagraph (F) of this paragraph (1),` `the long-term renewable resources procurement plan shall` `include the goals for procurement of renewable energy` `credits to meet at least the following overall percentages:` `13% by the 2017 delivery year; increasing by at least 1.5%` `each delivery year thereafter to at least 25% by the 2025` `delivery year; and continuing at no less than 25% for each` `delivery year thereafter. In the event of a conflict` `between these goals and the new wind and new photovoltaic` `procurement requirements described in items (i) through` `(iii) of subparagraph (C) of this paragraph (1), the` `long-term plan shall prioritize compliance with the new` `wind and new photovoltaic procurement requirements` `described in items (i) through (iii) of subparagraph (C) of` `this paragraph (1) over the annual percentage targets` `described in this subparagraph (B). For the delivery year beginning June 1, 2017, the` `procurement plan shall include cost-effective renewable energy` `resources equal to at least 13% of each utility's load for` `eligible retail customers and 13% of the applicable portion of` `each utility's load for retail customers who are not eligible` `retail customers, which applicable portion shall equal 50% of` `the utility's load for retail customers who are not eligible` `retail customers on February 28, 2017. For the delivery year beginning June 1, 2018, the` `procurement plan shall include cost-effective renewable energy` `resources equal to at least 14.5% of each utility's load for` `eligible retail customers and 14.5% of the applicable portion` `of each utility's load for retail customers who are not` `eligible retail customers, which applicable portion shall` `equal 75% of the utility's load for retail customers who are` `not eligible retail customers on February 28, 2017. For the delivery year beginning June 1, 2019, and for each` `year thereafter, the procurement plans shall include` `cost-effective renewable energy resources equal to a minimum` `percentage of each utility's load for all retail customers as` `follows: 16% by June 1, 2019; increasing by 1.5% each year` `thereafter to 25% by June 1, 2025; and 25% by June 1, 2026 and` `each year thereafter.` ``For each delivery year, the Agency shall first` `recognize each utility's obligations for that delivery` `year under existing contracts. Any renewable energy` `credits under existing contracts, including renewable` `energy credits as part of renewable energy resources, shall` `be used to meet the goals set forth in this subsection (c)` `for the delivery year. ``(C) Of the renewable energy credits procured under this` `subsection (c), at least 75% shall come from wind and` `photovoltaic projects. The long-term renewable resources` `procurement plan described in subparagraph (A) of this` `paragraph (1) shall include the procurement of renewable` `energy credits in amounts equal to at least the following: `(i) By the end of the 2020 delivery year:` At least 2,000,000 renewable energy credits` `for each delivery year shall come from new wind` `projects; and` At least 2,000,000 renewable energy credits` `for each delivery year shall come from new` `photovoltaic projects; of that amount, to the` `extent possible, the Agency shall procure: at` `least 50% from solar photovoltaic projects using` `the program outlined in subparagraph (K) of this` `paragraph (1) from distributed renewable energy` `generation devices or community renewable` `generation projects; at least 40% from` `utility-scale solar projects; at least 2% from` `brownfield site photovoltaic projects that are not` `community renewable generation projects; and the` `remainder shall be determined through the` `long-term planning process described in` `subparagraph (A) of this paragraph (1).` `(ii) By the end of the 2025 delivery year:` At least 3,000,000 renewable energy credits` `for each delivery year shall come from new wind` `projects; and` At least 3,000,000 renewable energy credits` `for each delivery year shall come from new` `photovoltaic projects; of that amount, to the` `extent possible, the Agency shall procure: at` `least 50% from solar photovoltaic projects using` `the program outlined in subparagraph (K) of this` `paragraph (1) from distributed renewable energy` `devices or community renewable generation` `projects; at least 40% from utility-scale solar` `projects; at least 2% from brownfield site` `photovoltaic projects that are not community` `renewable generation projects; and the remainder` `shall be determined through the long-term planning` `process described in subparagraph (A) of this` `paragraph (1).` `(iii) By the end of the 2030 delivery year:` At least 4,000,000 renewable energy credits` `for each delivery year shall come from new wind` `projects; and` At least 4,000,000 renewable energy credits` `for each delivery year shall come from new` `photovoltaic projects; of that amount, to the` `extent possible, the Agency shall procure: at` `least 50% from solar photovoltaic projects using` `the program outlined in subparagraph (K) of this` `paragraph (1) from distributed renewable energy` `devices or community renewable generation` `projects; at least 40% from utility-scale solar` `projects; at least 2% from brownfield site` `photovoltaic projects that are not community` `renewable generation projects; and the remainder` `shall be determined through the long-term planning` `process described in subparagraph (A) of this` `paragraph (1).` `For purposes of this Section:` "New wind projects" means wind renewable` `energy facilities that are energized after June 1,` `2017 for the delivery year commencing June 1, 2017` `or within 3 years after the date the Commission` `approves contracts for subsequent delivery years.` "New photovoltaic projects" means photovoltaic` `renewable energy facilities that are energized` `after June 1, 2017. Photovoltaic projects` `developed under Section 1-56 of this Act shall not` `apply towards the new photovoltaic project` `requirements in this subparagraph (C).` ``(D) Renewable energy credits shall be cost effective.` `For purposes of this subsection (c), "cost effective" means` `that the costs of procuring renewable energy resources do` `not cause the limit stated in subparagraph (E) of this` `paragraph (1) to be exceeded and, for renewable energy` `credits procured through a competitive procurement event,` `do not exceed benchmarks based on market prices for like` `products in the region. For purposes of this subsection` `(c), "like products" means contracts for renewable energy` `credits from the same or substantially similar technology,` `same or substantially similar vintage (new or existing),` `the same or substantially similar quantity, and the same or` `substantially similar contract length and structure.` `Benchmarks shall be developed by the procurement` `administrator, in consultation with the Commission staff,` `Agency staff, and the procurement monitor and shall be` `subject to Commission review and approval. If price` `benchmarks for like products in the region are not` `available, the procurement administrator shall establish` `price benchmarks based on publicly available data on` `regional technology costs and expected current and future` `regional energy prices. The benchmarks in this Section` `shall not be used to curtail or otherwise reduce` `contractual obligations entered into by or through the` `Agency prior to the effective date of this amendatory Act` `of the 99th General Assembly. ``(E) For purposes of this subsection (c), the required` `procurement of cost-effective renewable energy resources` `for a particular year commencing prior to June 1, 2017` `shall be measured as a percentage of the actual amount of` `electricity (megawatt-hours) supplied by the electric` `utility to eligible retail customers in the delivery year` `ending immediately prior to the procurement, and, for` `delivery years commencing on and after June 1, 2017, the` `required procurement of cost-effective renewable energy` `resources for a particular year shall be measured as a` `percentage of the actual amount of electricity` `(megawatt-hours) delivered by the electric utility in the` `delivery year ending immediately prior to the procurement,` `to all retail customers in its service territory. For` `purposes of this subsection (c), the amount paid per` `kilowatthour means the total amount paid for electric` `service expressed on a per kilowatthour basis. For purposes` `of this subsection (c), the total amount paid for electric` `service includes without limitation amounts paid for` `supply, transmission, distribution, surcharges, and add-on` `taxes. ``Notwithstanding the requirements of this subsection` `(c), the total of renewable energy resources procured under` `the procurement plan for any single year shall be subject` `to the limitations of this subparagraph (E). Such` `procurement shall be reduced for all retail customers based` `on the amount necessary to limit the annual estimated` `average net increase due to the costs of these resources` `included in the amounts paid by eligible retail customers` `in connection with electric service to no more than the` `greater of 2.015% of the amount paid per kilowatthour by` `those customers during the year ending May 31, 2007 or the` `incremental amount per kilowatthour paid for these` `resources in 2011. To arrive at a maximum dollar amount of` `renewable energy resources to be procured for the` `particular delivery year, the resulting per kilowatthour` `amount shall be applied to the actual amount of` `kilowatthours of electricity delivered, or applicable` `portion of such amount as specified in paragraph (1) of` `this subsection (c), as applicable, by the electric utility` `in the delivery year immediately prior to the procurement` `to all retail customers in its service territory. The` `calculations required by this subparagraph (E) shall be` `made only once for each delivery year at the time that the` `renewable energy resources are procured. Once the` `determination as to the amount of renewable energy` `resources to procure is made based on the calculations set` `forth in this subparagraph (E) and the contracts procuring` `those amounts are executed, no subsequent rate impact` `determinations shall be made and no adjustments to those` `contract amounts shall be allowed. All costs incurred under` `such contracts shall be fully recoverable by the electric` `utility as provided in this Section. ``(F) If the limitation on the amount of renewable energy` `resources procured in subparagraph (E) of this paragraph` `(1) prevents the Agency from meeting all of the goals in` `this subsection (c), the Agency's long-term plan shall` `prioritize compliance with the requirements of this` `subsection (c) regarding renewable energy credits in the` `following order:` `(i) renewable energy credits under existing` `contractual obligations;` `(i-5)funding for the Illinois Solar for All` `Program, as described in subparagraph (O) of this` `paragraph (1); `(ii) renewable energy credits necessary to comply` `with the new wind and new photovoltaic procurement` `requirements described in items (i) through (iii) of` `subparagraph (C) of this paragraph (1); and` `(iii) renewable energy credits necessary to meet` `the remaining requirements of this subsection (c).` ``(G) The following provisions shall apply to the` `Agency's procurement of renewable energy credits under` `this subsection (c):` `(i) Notwithstanding whether a long-term renewable` `resources procurement plan has been approved, the` `Agency shall conduct an initial forward procurement` `for renewable energy credits from new utility-scale` `wind projects within 160 days after the effective date` `of this amendatory Act of the 99th General Assembly.` `For the purposes of this initial forward procurement,` `the Agency shall solicit 15-year contracts for` `delivery of 1,000,000 renewable energy credits` `delivered annually from new utility-scale wind` `projects to begin delivery on June 1, 2019, if` `available, but not later than June 1, 2021. Payments to` `suppliers of renewable energy credits shall commence` `upon delivery. Renewable energy credits procured under` `this initial procurement shall be included in the` `Agency's long-term plan and shall apply to all` `renewable energy goals in this subsection (c).` `(ii) Notwithstanding whether a long-term renewable` `resources procurement plan has been approved, the` `Agency shall conduct an initial forward procurement` `for renewable energy credits from new utility-scale` `solar projects and brownfield site photovoltaic` `projects within one year after the effective date of` `this amendatory Act of the 99th General Assembly. For` `the purposes of this initial forward procurement, the` `Agency shall solicit 15-year contracts for delivery of` `1,000,000 renewable energy credits delivered annually` `from new utility-scale solar projects and brownfield` `site photovoltaic projects to begin delivery on June 1,` `2019, if available, but not later than June 1, 2021.` `The Agency may structure this initial procurement in` `one or more discrete procurement events. Payments to` `suppliers of renewable energy credits shall commence` `upon delivery. Renewable energy credits procured under` `this initial procurement shall be included in the` `Agency's long-term plan and shall apply to all` `renewable energy goals in this subsection (c).` `(iii) Subsequent forward procurements for` `utility-scale wind projects shall solicit at least` `1,000,000 renewable energy credits delivered annually` `per procurement event and shall be planned, scheduled,` `and designed such that the cumulative amount of` `renewable energy credits delivered from all new wind` `projects in each delivery year shall not exceed the` `Agency's projection of the cumulative amount of` `renewable energy credits that will be delivered from` `all new photovoltaic projects, including utility-scale` `and distributed photovoltaic devices, in the same` `delivery year at the time scheduled for wind contract` `delivery.` `(iv) If, at any time after the time set for` `delivery of renewable energy credits pursuant to the` `initial procurements in items (i) and (ii) of this` `subparagraph (G), the cumulative amount of renewable` `energy credits projected to be delivered from all new` `wind projects in a given delivery year exceeds the` `cumulative amount of renewable energy credits` `projected to be delivered from all new photovoltaic` `projects in that delivery year by 200,000 or more` `renewable energy credits, then the Agency shall within` `60 days adjust the procurement programs in the` `long-term renewable resources procurement plan to` `ensure that the projected cumulative amount of` `renewable energy credits to be delivered from all new` `wind projects does not exceed the projected cumulative` `amount of renewable energy credits to be delivered from` `all new photovoltaic projects by 200,000 or more` `renewable energy credits, provided that nothing in` `this Section shall preclude the projected cumulative` `amount of renewable energy credits to be delivered from` `all new photovoltaic projects from exceeding the` `projected cumulative amount of renewable energy` `credits to be delivered from all new wind projects in` `each delivery year and provided further that nothing in` `this item (iv) shall require the curtailment of an` `executed contract. The Agency shall update, on a` `quarterly basis, its projection of the renewable` `energy credits to be delivered from all projects in` `each delivery year. Notwithstanding anything to the` `contrary, the Agency may adjust the timing of` `procurement events conducted under this subparagraph` `(G). The long-term renewable resources procurement` `plan shall set forth the process by which the` `adjustments may be made.` `(v) All procurements under this subparagraph (G)` `shall comply with the geographic requirements in` `subparagraph (I) of this paragraph (1) and shall follow` `the procurement processes and procedures described in` `this Section and Section 16-111.5 of the Public` `Utilities Act to the extent practicable, and these` `processes and procedures may be expedited to` `accommodate the schedule established by this` `subparagraph (G).` ``(H) The procurement of renewable energy resources for a` `given delivery year shall be reduced as described in this` `subparagraph (H) if an alternate retail electric supplier` `meets the requirements described in this subparagraph (H). `(i) Within 45 days after the effective date of this` `amendatory Act of the 99th General Assembly, an` `alternative retail electric supplier or its successor` `shall submit an informational filing to the Illinois` `Commerce Commission certifying that, as of December` `31, 2015, the alternative retail electric supplier` `owned one or more electric generating facilities that` `generates renewable energy resources as defined in` `Section 1-10 of this Act, provided that such facilities` `are not powered by wind or photovoltaics, and the` `facilities generate one renewable energy credit for` `each megawatthour of energy produced from the` `facility.` `The informational filing shall identify each` `facility that was eligible to satisfy the alternative` `retail electric supplier's obligations under Section` `16-115D of the Public Utilities Act as described in` `this item (i).` `(ii) For a given delivery year, the alternative` `retail electric supplier may elect to supply its retail` `customers with renewable energy credits from the` `facility or facilities described in item (i) of this` `subparagraph (H) that continue to be owned by the` `alternative retail electric supplier.` `(iii) The alternative retail electric supplier` `shall notify the Agency and the applicable utility, no` `later than February 28 of the year preceding the` `applicable delivery year or 15 days after the effective` `date of this amendatory Act of the 99th General` `Assembly, whichever is later, of its election under` `item (ii) of this subparagraph (H) to supply renewable` `energy credits to retail customers of the utility. Such` `election shall identify the amount of renewable energy` `credits to be supplied by the alternative retail` `electric supplier to the utility's retail customers` `and the source of the renewable energy credits` `identified in the informational filing as described in` `item (i) of this subparagraph (H), subject to the` `following limitations:` For the delivery year beginning June 1, 2018,` `the maximum amount of renewable energy credits to` `be supplied by an alternative retail electric` `supplier under this subparagraph (H) shall be 68%` `multiplied by 25% multiplied by 14.5% multiplied` `by the amount of metered electricity` `(megawatt-hours) delivered by the alternative` `retail electric supplier to Illinois retail` `customers during the delivery year ending May 31,` `2016.` For delivery years beginning June 1, 2019 and` `each year thereafter, the maximum amount of` `renewable energy credits to be supplied by an` `alternative retail electric supplier under this` `subparagraph (H) shall be 68% multiplied by 50%` `multiplied by 16% multiplied by the amount of` `metered electricity (megawatt-hours) delivered by` `the alternative retail electric supplier to` `Illinois retail customers during the delivery year` `ending May 31, 2016, provided that the 16% value` `shall increase by 1.5% each delivery year` `thereafter to 25% by the delivery year beginning` `June 1, 2025, and thereafter the 25% value shall` `apply to each delivery year.` `For each delivery year, the total amount of` `renewable energy credits supplied by all alternative` `retail electric suppliers under this subparagraph (H)` `shall not exceed 9% of the Illinois target renewable` `energy credit quantity. The Illinois target renewable` `energy credit quantity for the delivery year beginning` `June 1, 2018 is 14.5% multiplied by the total amount of` `metered electricity (megawatt-hours) delivered in the` `delivery year immediately preceding that delivery` `year, provided that the 14.5% shall increase by 1.5%` `each delivery year thereafter to 25% by the delivery` `year beginning June 1, 2025, and thereafter the 25%` `value shall apply to each delivery year.` `If the requirements set forth in items (i) through` `(iii) of this subparagraph (H) are met, the charges` `that would otherwise be applicable to the retail` `customers of the alternative retail electric supplier` `under paragraph (6) of this subsection (c) for the` `applicable delivery year shall be reduced by the ratio` `of the quantity of renewable energy credits supplied by` `the alternative retail electric supplier compared to` `that supplier's target renewable energy credit` `quantity. The supplier's target renewable energy` `credit quantity for the delivery year beginning June 1,` `2018 is 14.5% multiplied by the total amount of metered` `electricity (megawatt-hours) delivered by the` `alternative retail supplier in that delivery year,` `provided that the 14.5% shall increase by 1.5% each` `delivery year thereafter to 25% by the delivery year` `beginning June 1, 2025, and thereafter the 25% value` `shall apply to each delivery year. `On or before April 1 of each year, the Agency shall` `annually publish a report on its website that` `identifies the aggregate amount of renewable energy` `credits supplied by alternative retail electric` `suppliers under this subparagraph (H). ``(I) The Agency shall design its long-term renewable` `energy procurement plan to maximize the State's interest in` `the health, safety, and welfare of its residents, including` `but not limited to minimizing sulfur dioxide, nitrogen` `oxide, particulate matter and other pollution that` `adversely affects public health in this State, increasing` `fuel and resource diversity in this State, enhancing the` `reliability and resiliency of the electricity distribution` `system in this State, meeting goals to limit carbon dioxide` `emissions under federal or State law, and contributing to a` `cleaner and healthier environment for the citizens of this` `State. In order to further these legislative purposes,` `renewable energy credits shall be eligible to be counted` `toward the renewable energy requirements of this` `subsection (c) if they are generated from facilities` `located in this State. The Agency may qualify renewable` `energy credits from facilities located in states adjacent` `to Illinois if the generator demonstrates and the Agency` `determines that the operation of such facility or` `facilities will help promote the State's interest in the` `health, safety, and welfare of its residents based on the` `public interest criteria described above. To ensure that` `the public interest criteria are applied to the procurement` `and given full effect, the Agency's long-term procurement` `plan shall describe in detail how each public interest` `factor shall be considered and weighted for facilities` `located in states adjacent to Illinois.` ``(J) In order to promote the competitive development of` `renewable energy resources in furtherance of the State's` `interest in the health, safety, and welfare of its` `residents, renewable energy credits shall not be eligible` `to be counted toward the renewable energy requirements of` `this subsection (c) if they are sourced from a generating` `unit whose costs were being recovered through rates` `regulated by this State or any other state or states on or` `after January 1, 2017. Each contract executed to purchase` `renewable energy credits under this subsection (c) shall` `provide for the contract's termination if the costs of the` `generating unit supplying the renewable energy credits` `subsequently begin to be recovered through rates regulated` `by this State or any other state or states; and each` `contract shall further provide that, in that event, the` `supplier of the credits must return 110% of all payments` `received under the contract. Amounts returned under the` `requirements of this subparagraph (J) shall be retained by` `the utility and all of these amounts shall be used for the` `procurement of additional renewable energy credits from` `new wind or new photovoltaic resources as defined in this` `subsection (c). The long-term plan shall provide that these` `renewable energy credits shall be procured in the next` `procurement event.` ``Notwithstanding the limitations of this subparagraph` `(J), renewable energy credits sourced from generating` `units that are constructed, purchased, owned, or leased by` `an electric utility as part of an approved project,` `program, or pilot under Section 1-56 of this Act shall be` `eligible to be counted toward the renewable energy` `requirements of this subsection (c), regardless of how the` `costs of these units are recovered.` ``(K) The long-term renewable resources procurement plan` `developed by the Agency in accordance with subparagraph (A)` `of this paragraph (1) shall include an Adjustable Block` `program for the procurement of renewable energy credits` `from new photovoltaic projects that are distributed` `renewable energy generation devices or new photovoltaic` `community renewable generation projects. The Adjustable` `Block program shall be designed to provide a transparent` `schedule of prices and quantities to enable the` `photovoltaic market to scale up and for renewable energy` `credit prices to adjust at a predictable rate over time.` `The prices set by the Adjustable Block program can be` `reflected as a set value or as the product of a formula.` ``The Adjustable Block program shall include for each` `category of eligible projects: a schedule of standard block` `purchase prices to be offered; a series of steps, with` `associated nameplate capacity and purchase prices that` `adjust from step to step; and automatic opening of the next` `step as soon as the nameplate capacity and available` `purchase prices for an open step are fully committed or` `reserved. Only projects energized on or after June 1, 2017` `shall be eligible for the Adjustable Block program. For` `each block group the Agency shall determine the number of` `blocks, the amount of generation capacity in each block,` `and the purchase price for each block, provided that the` `purchase price provided and the total amount of generation` `in all blocks for all block groups shall be sufficient to` `meet the goals in this subsection (c). The Agency may` `periodically review its prior decisions establishing the` `number of blocks, the amount of generation capacity in each` `block, and the purchase price for each block, and may` `propose, on an expedited basis, changes to these previously` `set values, including but not limited to redistributing` `these amounts and the available funds as necessary and` `appropriate, subject to Commission approval as part of the` `periodic plan revision process described in Section` `16-111.5 of the Public Utilities Act. The Agency may define` `different block sizes, purchase prices, or other distinct` `terms and conditions for projects located in different` `utility service territories if the Agency deems it` `necessary to meet the goals in this subsection (c).` ``The Adjustable Block program shall include at least the` `following block groups in at least the following amounts,` `which may be adjusted upon review by the Agency and` `approval by the Commission as described in this` `subparagraph (K):` `(i) At least 25% from distributed renewable energy` `generation devices with a nameplate capacity of no more` `than 10 kilowatts.` `(ii) At least 25% from distributed renewable` `energy generation devices with a nameplate capacity of` `more than 10 kilowatts and no more than 2,000` `kilowatts. The Agency may create sub-categories within` `this category to account for the differences between` `projects for small commercial customers, large` `commercial customers, and public or non-profit` `customers.` `(iii) At least 25% from photovoltaic community` `renewable generation projects.` `(iv) The remaining 25% shall be allocated as` `specified by the Agency in the long-term renewable` `resources procurement plan.` ``The Adjustable Block program shall be designed to` `ensure that renewable energy credits are procured from` `photovoltaic distributed renewable energy generation` `devices and new photovoltaic community renewable energy` `generation projects in diverse locations and are not` `concentrated in a few geographic areas.` ``(L) The procurement of photovoltaic renewable energy` `credits under items (i) through (iv) of subparagraph (K) of` `this paragraph (1) shall be subject to the following` `contract and payment terms:` `(i) The Agency shall procure contracts of at least` `15 years in length.` `(ii) For those renewable energy credits that` `qualify and are procured under item (i) of subparagraph` `(K) of this paragraph (1), the renewable energy credit` `purchase price shall be paid in full by the contracting` `utilities at the time that the facility producing the` `renewable energy credits is interconnected at the` `distribution system level of the utility and` `energized. The electric utility shall receive and` `retire all renewable energy credits generated by the` `project for the first 15 years of operation.` `(iii) For those renewable energy credits that` `qualify and are procured under item (ii) and (iii) of` `subparagraph (K) of this paragraph (1) and any` `additional categories of distributed generation` `included in the long-term renewable resources` `procurement plan and approved by the Commission, 20` `percent of the renewable energy credit purchase price` `shall be paid by the contracting utilities at the time` `that the facility producing the renewable energy` `credits is interconnected at the distribution system` `level of the utility and energized. The remaining` `portion shall be paid ratably over the subsequent` `4-year period. The electric utility shall receive and` `retire all renewable energy credits generated by the` `project for the first 15 years of operation.` `(iv) Each contract shall include provisions to` `ensure the delivery of the renewable energy credits for` `the full term of the contract. `(v) The utility shall be the counterparty to the` `contracts executed under this subparagraph (L) that` `are approved by the Commission under the process` `described in Section 16-111.5 of the Public Utilities` `Act. No contract shall be executed for an amount that` `is less than one renewable energy credit per year.` `(vi) If, at any time, approved applications for the` `Adjustable Block program exceed funds collected by the` `electric utility or would cause the Agency to exceed` `the limitation described in subparagraph (E) of this` `paragraph (1) on the amount of renewable energy` `resources that may be procured, then the Agency shall` `consider future uncommitted funds to be reserved for` `these contracts on a first-come, first-served basis,` `with the delivery of renewable energy credits required` `beginning at the time that the reserved funds become` `available.` `(vii) Nothing in this Section shall require the` `utility to advance any payment or pay any amounts that` `exceed the actual amount of revenues collected by the` `utility under paragraph (6) of this subsection (c) and` `subsection (k) of Section 16-108 of the Public` `Utilities Act, and contracts executed under this` `Section shall expressly incorporate this limitation. ``(M) The Agency shall be authorized to retain one or` `more experts or expert consulting firms to develop,` `administer, implement, operate, and evaluate the` `Adjustable Block program described in subparagraph (K) of` `this paragraph (1), and the Agency shall retain the` `consultant or consultants in the same manner, to the extent` `practicable, as the Agency retains others to administer` `provisions of this Act, including, but not limited to, the` `procurement administrator. The selection of experts and` `expert consulting firms and the procurement process` `described in this subparagraph (M) are exempt from the` `requirements of Section 20-10 of the Illinois Procurement` `Code, under Section 20-10 of that Code. The Agency shall` `strive to minimize administrative expenses in the` `implementation of the Adjustable Block program.` ``The Agency and its consultant or consultants shall` `monitor block activity, share program activity with` `stakeholders and conduct regularly scheduled meetings to` `discuss program activity and market conditions. If` `necessary, the Agency may make prospective administrative` `adjustments to the Adjustable Block program design, such as` `redistributing available funds or making adjustments to` `purchase prices as necessary to achieve the goals of this` `subsection (c). Program modifications to any price,` `capacity block, or other program element that do not` `deviate from the Commission's approved value by more than` `25% shall take effect immediately and are not subject to` `Commission review and approval. Program modifications to` `any price, capacity block, or other program element that` `deviate more than 25% from the Commission's approved value` `must be approved by the Commission as a long-term plan` `amendment under Section 16-111.5 of the Public Utilities` `Act. The Agency shall consider stakeholder feedback when` `making adjustments to the Adjustable Block design and shall` `notify stakeholders in advance of any planned changes.` ``(N) The long-term renewable resources procurement plan` `required by this subsection (c) shall include a community` `renewable generation program. The Agency shall establish` `the terms, conditions, and program requirements for` `community renewable generation projects with a goal to` `expand renewable energy generating facility access to a` `broader group of energy consumers, to ensure robust` `participation opportunities for residential and small` `commercial customers and those who cannot install` `renewable energy on their own properties. Any plan approved` `by the Commission shall allow subscriptions to community` `renewable generation projects to be portable and` `transferable. For purposes of this subparagraph (N),` `"portable" means that subscriptions may be retained by the` `subscriber even if the subscriber relocates or changes its` `address within the same utility service territory; and` `"transferable" means that a subscriber may assign or sell` `subscriptions to another person within the same utility` `service territory.` ``Electric utilities shall provide a monetary credit to a` `subscriber's subsequent bill for service for the` `proportional output of a community renewable generation` `project attributable to that subscriber as specified in` `Section 16-107.5 of the Public Utilities Act.` ``The Agency shall purchase renewable energy credits` `from subscribed shares of photovoltaic community renewable` `generation projects through the Adjustable Block program` `described in subparagraph (K) of this paragraph (1) or` `through the Illinois Solar for All Program described in` `Section 1-56 of this Act. The electric utility shall` `purchase any unsubscribed energy from community renewable` `generation projects that are Qualifying Facilities ("QF")` `under the electric utility's tariff for purchasing the` `output from QFs under Public Utilities Regulatory Policies` `Act of 1978. ``The owners of and any subscribers to a community` `renewable generation project shall not be considered` `public utilities or alternative retail electricity` `suppliers under the Public Utilities Act solely as a result` `of their interest in or subscription to a community` `renewable generation project and shall not be required to` `become an alternative retail electric supplier by` `participating in a community renewable generation project` `with a public utility.` ``(O) For the delivery year beginning June 1, 2018, the` `long-term renewable resources procurement plan required by` `this subsection (c) shall provide for the Agency to procure` `contracts to continue offering the Illinois Solar for All` `Program described in subsection (b) of Section 1-56 of this` `Act, and the contracts approved by the Commission shall be` `executed by the utilities that are subject to this` `subsection (c). The long-term renewable resources` `procurement plan shall allocate 5% of the funds available` `under the plan for the applicable delivery year, or` `$10,000,000 per delivery year, whichever is greater, to` `fund the programs, and the plan shall determine the amount` `of funding to be apportioned to the programs identified in` `subsection (b) of Section 1-56 of this Act; provided that` `for the delivery years beginning June 1, 2017, June 1,` `2021, and June 1, 2025, the long-term renewable resources` `procurement plan shall allocate 10% of the funds available` `under the plan for the applicable delivery year, or` `$20,000,000 per delivery year, whichever is greater, and` `$10,000,000 of such funds in such year shall be used by an` `electric utility that serves more than 3,000,000 retail` `customers in the State to implement a Commission-approved` `plan under Section 16-108.12 of the Public Utilities Act.` `In making the determinations required under this` `subparagraph (O), the Commission shall consider the` `experience and performance under the programs and any` `evaluation reports. The Commission shall also provide for` `an independent evaluation of those programs on a periodic` `basis that are funded under this subparagraph (O). `The` `procurement plans shall include cost-effective renewable` `energy resources. A minimum percentage of each utility's` `total supply to serve the load of eligible retail` `customers, as defined in Section 16-111.5(a) of the Public` `Utilities Act, procured for each of the following years` `shall be generated from cost-effective renewable energy` `resources: at least 2% by June 1, 2008; at least 4% by June` `1, 2009; at least 5% by June 1, 2010; at least 6% by June 1,` `2011; at least 7% by June 1, 2012; at least 8% by June 1,` `2013; at least 9% by June 1, 2014; at least 10% by June 1,` `2015; and increasing by at least 1.5% each year thereafter` `to at least 25% by June 1, 2025. To the extent that it is` `available, at least 75% of the renewable energy resources` `used to meet these standards shall come from wind` `generation and, beginning on June 1, 2011, at least the` `following percentages of the renewable energy resources` `used to meet these standards shall come from photovoltaics` `on the following schedule: 0.5% by June 1, 2012, 1.5% by` `June 1, 2013; 3% by June 1, 2014; and 6% by June 1, 2015 and` `thereafter. Of the renewable energy resources procured` `pursuant to this Section, at least the following` `percentages shall come from distributed renewable energy` `generation devices: 0.5% by June 1, 2013, 0.75% by June 1,` `2014, and 1% by June 1, 2015 and thereafter. To the extent` `available, half of the renewable energy resources procured` `from distributed renewable energy generation shall come` `from devices of less than 25 kilowatts in nameplate` `capacity. Renewable energy resources procured from` `distributed generation devices may also count towards the` `required percentages for wind and solar photovoltaics.` `Procurement of renewable energy resources from distributed` `renewable energy generation devices shall be done on an` `annual basis through multi-year contracts of no less than 5` `years, and shall consist solely of renewable energy` `credits.` ``The Agency shall create credit requirements for` `suppliers of distributed renewable energy. In order to` `minimize the administrative burden on contracting` `entities, the Agency shall solicit the use of third-party` `organizations to aggregate distributed renewable energy` `into groups of no less than one megawatt in installed` `capacity. These third-party organizations shall administer` `contracts with individual distributed renewable energy` `generation device owners. An individual distributed` `renewable energy generation device owner shall have the` `ability to measure the output of his or her distributed` `renewable energy generation device.` ``For purposes of this subsection (c), "cost-effective"` `means that the costs of procuring renewable energy` `resources do not cause the limit stated in paragraph (2) of` `this subsection (c) to be exceeded and do not exceed` `benchmarks based on market prices for renewable energy` `resources in the region, which shall be developed by the` `procurement administrator, in consultation with the` `Commission staff, Agency staff, and the procurement` `monitor and shall be subject to Commission review and` `approval. ``(2)``(Blank). `For purposes of this subsection (c), the` `required procurement of cost-effective renewable energy` `resources for a particular year shall be measured as a` `percentage of the actual amount of electricity` `(megawatt-hours) supplied by the electric utility to` `eligible retail customers in the planning year ending` `immediately prior to the procurement. For purposes of this` `subsection (c), the amount paid per kilowatthour means the` `total amount paid for electric service expressed on a per` `kilowatthour basis. For purposes of this subsection (c),` `the total amount paid for electric service includes without` `limitation amounts paid for supply, transmission,` `distribution, surcharges, and add-on taxes.` ``Notwithstanding the requirements of this subsection` `(c), the total of renewable energy resources procured` `pursuant to the procurement plan for any single year shall` `be reduced by an amount necessary to limit the annual` `estimated average net increase due to the costs of these` `resources included in the amounts paid by eligible retail` `customers in connection with electric service to:` `(A) in 2008, no more than 0.5% of the amount paid` `per kilowatthour by those customers during the year` `ending May 31, 2007;` `(B) in 2009, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2008 or 1% of the amount` `paid per kilowatthour by those customers during the` `year ending May 31, 2007;` `(C) in 2010, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2009 or 1.5% of the` `amount paid per kilowatthour by those customers during` `the year ending May 31, 2007;` `(D) in 2011, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2010 or 2% of the amount` `paid per kilowatthour by those customers during the` `year ending May 31, 2007; and `(E) thereafter, the amount of renewable energy` `resources procured pursuant to the procurement plan` `for any single year shall be reduced by an amount` `necessary to limit the estimated average net increase` `due to the cost of these resources included in the` `amounts paid by eligible retail customers in` `connection with electric service to no more than the` `greater of 2.015% of the amount paid per kilowatthour` `by those customers during the year ending May 31, 2007` `or the incremental amount per kilowatthour paid for` `these resources in 2011.` `No later than June 30, 2011, the Commission shall` `review the limitation on the amount of renewable energy` `resources procured pursuant to this subsection (c) and` `report to the General Assembly its findings as to` `whether that limitation unduly constrains the` `procurement of cost-effective renewable energy` `resources.` ``(3)``(Blank). `Through June 1, 2011, renewable energy` `resources shall be counted for the purpose of meeting the` `renewable energy standards set forth in paragraph (1) of` `this subsection (c) only if they are generated from` `facilities located in the State, provided that` `cost-effective renewable energy resources are available` `from those facilities. If those cost-effective resources` `are not available in Illinois, they shall be procured in` `states that adjoin Illinois and may be counted towards` `compliance. If those cost-effective resources are not` `available in Illinois or in states that adjoin Illinois,` `they shall be purchased elsewhere and shall be counted` `towards compliance. After June 1, 2011, cost-effective` `renewable energy resources located in Illinois and in` `states that adjoin Illinois may be counted towards` `compliance with the standards set forth in paragraph (1) of` `this subsection (c). If those cost-effective resources are` `not available in Illinois or in states that adjoin` `Illinois, they shall be purchased elsewhere and shall be` `counted towards compliance. ``(4) The electric utility shall retire all renewable` `energy credits used to comply with the standard.` ``(5) Beginning with the``2010 delivery year and ending` `June 1, 2017 `year commencing June 1, 2010``, an electric` `utility subject to this subsection (c) shall apply the` `lesser of the maximum alternative compliance payment rate` `or the most recent estimated alternative compliance` `payment rate for its service territory for the` `corresponding compliance period, established pursuant to` `subsection (d) of Section 16-115D of the Public Utilities` `Act to its retail customers that take service pursuant to` `the electric utility's hourly pricing tariff or tariffs.` `The electric utility shall retain all amounts collected as` `a result of the application of the alternative compliance` `payment rate or rates to such customers, and, beginning in` `2011, the utility shall include in the information provided` `under item (1) of subsection (d) of Section 16-111.5 of the` `Public Utilities Act the amounts collected under the` `alternative compliance payment rate or rates for the prior` `year ending May 31. Notwithstanding any limitation on the` `procurement of renewable energy resources imposed by item` `(2) of this subsection (c), the Agency shall increase its` `spending on the purchase of renewable energy resources to` `be procured by the electric utility for the next plan year` `by an amount equal to the amounts collected by the utility` `under the alternative compliance payment rate or rates in` `the prior year ending May 31.` ``(6) The electric utility shall be entitled to recover` `all of its costs associated with the procurement of` `renewable energy credits under plans approved under this` `Section and Section 16-111.5 of the Public Utilities Act.` `These costs shall include associated reasonable expenses` `for implementing the procurement programs, including, but` `not limited to, the costs of administering and evaluating` `the Adjustable Block program, through an automatic` `adjustment clause tariff in accordance with subsection (k)` `of Section 16-108 of the Public Utilities Act.` ``(7) Renewable energy credits procured from new` `photovoltaic projects or new distributed renewable energy` `generation devices under this Section after the effective` `date of this amendatory Act of the 99th General Assembly` `must be procured from devices installed by a qualified` `person in compliance with the requirements of Section` `16-128A of the Public Utilities Act and any rules or` `regulations adopted thereunder.` ``In meeting the renewable energy requirements of this` `subsection (c), to the extent feasible and consistent with` `State and federal law, the renewable energy credit` `procurements, Adjustable Block solar program, and` `community renewable generation program shall provide` `employment opportunities for all segments of the` `population and workforce, including minority-owned and` `female-owned business enterprises, and shall not,` `consistent with State and federal law, discriminate based` `on race or socioeconomic status. (d) Clean coal portfolio standard.` ``(1) The procurement plans shall include electricity` `generated using clean coal. Each utility shall enter into` `one or more sourcing agreements with the initial clean coal` `facility, as provided in paragraph (3) of this subsection` `(d), covering electricity generated by the initial clean` `coal facility representing at least 5% of each utility's` `total supply to serve the load of eligible retail customers` `in 2015 and each year thereafter, as described in paragraph` `(3) of this subsection (d), subject to the limits specified` `in paragraph (2) of this subsection (d). It is the goal of` `the State that by January 1, 2025, 25% of the electricity` `used in the State shall be generated by cost-effective` `clean coal facilities. For purposes of this subsection (d),` `"cost-effective" means that the expenditures pursuant to` `such sourcing agreements do not cause the limit stated in` `paragraph (2) of this subsection (d) to be exceeded and do` `not exceed cost-based benchmarks, which shall be developed` `to assess all expenditures pursuant to such sourcing` `agreements covering electricity generated by clean coal` `facilities, other than the initial clean coal facility, by` `the procurement administrator, in consultation with the` `Commission staff, Agency staff, and the procurement` `monitor and shall be subject to Commission review and` `approval.` ``A utility party to a sourcing agreement shall` `immediately retire any emission credits that it receives in` `connection with the electricity covered by such agreement.` ``Utilities shall maintain adequate records documenting` `the purchases under the sourcing agreement to comply with` `this subsection (d) and shall file an accounting with the` `load forecast that must be filed with the Agency by July 15` `of each year, in accordance with subsection (d) of Section` `16-111.5 of the Public Utilities Act.` ``A utility shall be deemed to have complied with the` `clean coal portfolio standard specified in this subsection` `(d) if the utility enters into a sourcing agreement as` `required by this subsection (d).` ``(2) For purposes of this subsection (d), the required` `execution of sourcing agreements with the initial clean` `coal facility for a particular year shall be measured as a` `percentage of the actual amount of electricity` `(megawatt-hours) supplied by the electric utility to` `eligible retail customers in the planning year ending` `immediately prior to the agreement's execution. For` `purposes of this subsection (d), the amount paid per` `kilowatthour means the total amount paid for electric` `service expressed on a per kilowatthour basis. For purposes` `of this subsection (d), the total amount paid for electric` `service includes without limitation amounts paid for` `supply, transmission, distribution, surcharges and add-on` `taxes.` ``Notwithstanding the requirements of this subsection` `(d), the total amount paid under sourcing agreements with` `clean coal facilities pursuant to the procurement plan for` `any given year shall be reduced by an amount necessary to` `limit the annual estimated average net increase due to the` `costs of these resources included in the amounts paid by` `eligible retail customers in connection with electric` `service to:` `(A) in 2010, no more than 0.5% of the amount paid` `per kilowatthour by those customers during the year` `ending May 31, 2009;` `(B) in 2011, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2010 or 1% of the amount` `paid per kilowatthour by those customers during the` `year ending May 31, 2009;` `(C) in 2012, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2011 or 1.5% of the` `amount paid per kilowatthour by those customers during` `the year ending May 31, 2009;` `(D) in 2013, the greater of an additional 0.5% of` `the amount paid per kilowatthour by those customers` `during the year ending May 31, 2012 or 2% of the amount` `paid per kilowatthour by those customers during the` `year ending May 31, 2009; and` `(E) thereafter, the total amount paid under` `sourcing agreements with clean coal facilities` `pursuant to the procurement plan for any single year` `shall be reduced by an amount necessary to limit the` `estimated average net increase due to the cost of these` `resources included in the amounts paid by eligible` `retail customers in connection with electric service` `to no more than the greater of (i) 2.015% of the amount` `paid per kilowatthour by those customers during the` `year ending May 31, 2009 or (ii) the incremental amount` `per kilowatthour paid for these resources in 2013.` `These requirements may be altered only as provided by` `statute.` ``No later than June 30, 2015, the Commission shall` `review the limitation on the total amount paid under` `sourcing agreements, if any, with clean coal facilities` `pursuant to this subsection (d) and report to the General` `Assembly its findings as to whether that limitation unduly` `constrains the amount of electricity generated by` `cost-effective clean coal facilities that is covered by` `sourcing agreements.` ``(3) Initial clean coal facility. In order to promote` `development of clean coal facilities in Illinois, each` `electric utility subject to this Section shall execute a` `sourcing agreement to source electricity from a proposed` `clean coal facility in Illinois (the "initial clean coal` `facility") that will have a nameplate capacity of at least` `500 MW when commercial operation commences, that has a` `final Clean Air Act permit on the effective date of this` `amendatory Act of the 95th General Assembly, and that will` `meet the definition of clean coal facility in Section 1-10` `of this Act when commercial operation commences. The` `sourcing agreements with this initial clean coal facility` `shall be subject to both approval of the initial clean coal` `facility by the General Assembly and satisfaction of the` `requirements of paragraph (4) of this subsection (d) and` `shall be executed within 90 days after any such approval by` `the General Assembly. The Agency and the Commission shall` `have authority to inspect all books and records associated` `with the initial clean coal facility during the term of` `such a sourcing agreement. A utility's sourcing agreement` `for electricity produced by the initial clean coal facility` `shall include:` `(A) a formula contractual price (the "contract` `price") approved pursuant to paragraph (4) of this` `subsection (d), which shall:` (i) be determined using a cost of service` `methodology employing either a level or deferred` `capital recovery component, based on a capital` `structure consisting of 45% equity and 55% debt,` `and a return on equity as may be approved by the` `Federal Energy Regulatory Commission, which in any` `case may not exceed the lower of 11.5% or the rate` `of return approved by the General Assembly` `pursuant to paragraph (4) of this subsection (d);` `and` (ii) provide that all miscellaneous net` `revenue, including but not limited to net revenue` `from the sale of emission allowances, if any,` `substitute natural gas, if any, grants or other` `support provided by the State of Illinois or the` `United States Government, firm transmission` `rights, if any, by-products produced by the` `facility, energy or capacity derived from the` `facility and not covered by a sourcing agreement` `pursuant to paragraph (3) of this subsection (d) or` `item (5) of subsection (d) of Section 16-115 of the` `Public Utilities Act, whether generated from the` `synthesis gas derived from coal, from SNG, or from` `natural gas, shall be credited against the revenue` `requirement for this initial clean coal facility;` `(B) power purchase provisions, which shall:` (i) provide that the utility party to such` `sourcing agreement shall pay the contract price` `for electricity delivered under such sourcing` `agreement;` (ii) require delivery of electricity to the` `regional transmission organization market of the` `utility that is party to such sourcing agreement;` (iii) require the utility party to such` `sourcing agreement to buy from the initial clean` `coal facility in each hour an amount of energy` `equal to all clean coal energy made available from` `the initial clean coal facility during such hour` `times a fraction, the numerator of which is such` `utility's retail market sales of electricity` `(expressed in kilowatthours sold) in the State` `during the prior calendar month and the` `denominator of which is the total retail market` `sales of electricity (expressed in kilowatthours` `sold) in the State by utilities during such prior` `month and the sales of electricity (expressed in` `kilowatthours sold) in the State by alternative` `retail electric suppliers during such prior month` `that are subject to the requirements of this` `subsection (d) and paragraph (5) of subsection (d)` `of Section 16-115 of the Public Utilities Act,` `provided that the amount purchased by the utility` `in any year will be limited by paragraph (2) of` `this subsection (d); and` (iv) be considered pre-existing contracts in` `such utility's procurement plans for eligible` `retail customers;` `(C) contract for differences provisions, which` `shall:` (i) require the utility party to such sourcing` `agreement to contract with the initial clean coal` `facility in each hour with respect to an amount of` `energy equal to all clean coal energy made` `available from the initial clean coal facility` `during such hour times a fraction, the numerator of` `which is such utility's retail market sales of` `electricity (expressed in kilowatthours sold) in` `the utility's service territory in the State` `during the prior calendar month and the` `denominator of which is the total retail market` `sales of electricity (expressed in kilowatthours` `sold) in the State by utilities during such prior` `month and the sales of electricity (expressed in` `kilowatthours sold) in the State by alternative` `retail electric suppliers during such prior month` `that are subject to the requirements of this` `subsection (d) and paragraph (5) of subsection (d)` `of Section 16-115 of the Public Utilities Act,` `provided that the amount paid by the utility in any` `year will be limited by paragraph (2) of this` `subsection (d);` (ii) provide that the utility's payment` `obligation in respect of the quantity of` `electricity determined pursuant to the preceding` `clause (i) shall be limited to an amount equal to` `(1) the difference between the contract price` `determined pursuant to subparagraph (A) of` `paragraph (3) of this subsection (d) and the` `day-ahead price for electricity delivered to the` `regional transmission organization market of the` `utility that is party to such sourcing agreement` `(or any successor delivery point at which such` `utility's supply obligations are financially` `settled on an hourly basis) (the "reference` `price") on the day preceding the day on which the` `electricity is delivered to the initial clean coal` `facility busbar, multiplied by (2) the quantity of` `electricity determined pursuant to the preceding` `clause (i); and` (iii) not require the utility to take physical` `delivery of the electricity produced by the` `facility;` `(D) general provisions, which shall:` (i) specify a term of no more than 30 years,` `commencing on the commercial operation date of the` `facility;` (ii) provide that utilities shall maintain` `adequate records documenting purchases under the` `sourcing agreements entered into to comply with` `this subsection (d) and shall file an accounting` `with the load forecast that must be filed with the` `Agency by July 15 of each year, in accordance with` `subsection (d) of Section 16-111.5 of the Public` `Utilities Act;` (iii) provide that all costs associated with` `the initial clean coal facility will be` `periodically reported to the Federal Energy` `Regulatory Commission and to purchasers in` `accordance with applicable laws governing` `cost-based wholesale power contracts;` (iv) permit the Illinois Power Agency to` `assume ownership of the initial clean coal` `facility, without monetary consideration and` `otherwise on reasonable terms acceptable to the` `Agency, if the Agency so requests no less than 3` `years prior to the end of the stated contract term;` (v) require the owner of the initial clean coal` `facility to provide documentation to the` `Commission each year, starting in the facility's` `first year of commercial operation, accurately` `reporting the quantity of carbon emissions from` `the facility that have been captured and` `sequestered and report any quantities of carbon` `released from the site or sites at which carbon` `emissions were sequestered in prior years, based` `on continuous monitoring of such sites. If, in any` `year after the first year of commercial operation,` `the owner of the facility fails to demonstrate that` `the initial clean coal facility captured and` `sequestered at least 50% of the total carbon` `emissions that the facility would otherwise emit` `or that sequestration of emissions from prior` `years has failed, resulting in the release of` `carbon dioxide into the atmosphere, the owner of` `the facility must offset excess emissions. Any` `such carbon offsets must be permanent, additional,` `verifiable, real, located within the State of` `Illinois, and legally and practicably enforceable.` `The cost of such offsets for the facility that are` `not recoverable shall not exceed $15 million in any` `given year. No costs of any such purchases of` `carbon offsets may be recovered from a utility or` `its customers. All carbon offsets purchased for` `this purpose and any carbon emission credits` `associated with sequestration of carbon from the` `facility must be permanently retired. The initial` `clean coal facility shall not forfeit its` `designation as a clean coal facility if the` `facility fails to fully comply with the applicable` `carbon sequestration requirements in any given` `year, provided the requisite offsets are` `purchased. However, the Attorney General, on` `behalf of the People of the State of Illinois, may` `specifically enforce the facility's sequestration` `requirement and the other terms of this contract` `provision. Compliance with the sequestration` `requirements and offset purchase requirements` `specified in paragraph (3) of this subsection (d)` `shall be reviewed annually by an independent` `expert retained by the owner of the initial clean` `coal facility, with the advance written approval` `of the Attorney General. The Commission may, in the` `course of the review specified in item (vii),` `reduce the allowable return on equity for the` `facility if the facility wilfully fails to comply` `with the carbon capture and sequestration` `requirements set forth in this item (v);` (vi) include limits on, and accordingly` `provide for modification of, the amount the` `utility is required to source under the sourcing` `agreement consistent with paragraph (2) of this` `subsection (d);` (vii) require Commission review: (1) to` `determine the justness, reasonableness, and` `prudence of the inputs to the formula referenced in` `subparagraphs (A)(i) through (A)(iii) of paragraph` `(3) of this subsection (d), prior to an adjustment` `in those inputs including, without limitation, the` `capital structure and return on equity, fuel` `costs, and other operations and maintenance costs` `and (2) to approve the costs to be passed through` `to customers under the sourcing agreement by which` `the utility satisfies its statutory obligations.` `Commission review shall occur no less than every 3` `years, regardless of whether any adjustments have` `been proposed, and shall be completed within 9` `months;` (viii) limit the utility's obligation to such` `amount as the utility is allowed to recover through` `tariffs filed with the Commission, provided that` `neither the clean coal facility nor the utility` `waives any right to assert federal pre-emption or` `any other argument in response to a purported` `disallowance of recovery costs;` (ix) limit the utility's or alternative retail` `electric supplier's obligation to incur any` `liability until such time as the facility is in` `commercial operation and generating power and` `energy and such power and energy is being delivered` `to the facility busbar;` (x) provide that the owner or owners of the` `initial clean coal facility, which is the` `counterparty to such sourcing agreement, shall` `have the right from time to time to elect whether` `the obligations of the utility party thereto shall` `be governed by the power purchase provisions or the` `contract for differences provisions;` (xi) append documentation showing that the` `formula rate and contract, insofar as they relate` `to the power purchase provisions, have been` `approved by the Federal Energy Regulatory` `Commission pursuant to Section 205 of the Federal` `Power Act;` (xii) provide that any changes to the terms of` `the contract, insofar as such changes relate to the` `power purchase provisions, are subject to review` `under the public interest standard applied by the` `Federal Energy Regulatory Commission pursuant to` `Sections 205 and 206 of the Federal Power Act; and` (xiii) conform with customary lender` `requirements in power purchase agreements used as` `the basis for financing non-utility generators.` ``(4) Effective date of sourcing agreements with the` `initial clean coal facility.` ``Any proposed sourcing agreement with the initial clean` `coal facility shall not become effective unless the` `following reports are prepared and submitted and` `authorizations and approvals obtained:` `(i) Facility cost report. The owner of the initial` `clean coal facility shall submit to the Commission, the` `Agency, and the General Assembly a front-end` `engineering and design study, a facility cost report,` `method of financing (including but not limited to` `structure and associated costs), and an operating and` `maintenance cost quote for the facility (collectively` `"facility cost report"), which shall be prepared in` `accordance with the requirements of this paragraph (4)` `of subsection (d) of this Section, and shall provide` `the Commission and the Agency access to the work` `papers, relied upon documents, and any other backup` `documentation related to the facility cost report.` `(ii) Commission report. Within 6 months following` `receipt of the facility cost report, the Commission, in` `consultation with the Agency, shall submit a report to` `the General Assembly setting forth its analysis of the` `facility cost report. Such report shall include, but` `not be limited to, a comparison of the costs associated` `with electricity generated by the initial clean coal` `facility to the costs associated with electricity` `generated by other types of generation facilities, an` `analysis of the rate impacts on residential and small` `business customers over the life of the sourcing` `agreements, and an analysis of the likelihood that the` `initial clean coal facility will commence commercial` `operation by and be delivering power to the facility's` `busbar by 2016. To assist in the preparation of its` `report, the Commission, in consultation with the` `Agency, may hire one or more experts or consultants,` `the costs of which shall be paid for by the owner of` `the initial clean coal facility. The Commission and` `Agency may begin the process of selecting such experts` `or consultants prior to receipt of the facility cost` `report.` `(iii) General Assembly approval. The proposed` `sourcing agreements shall not take effect unless,` `based on the facility cost report and the Commission's` `report, the General Assembly enacts authorizing` `legislation approving (A) the projected price, stated` `in cents per kilowatthour, to be charged for` `electricity generated by the initial clean coal` `facility, (B) the projected impact on residential and` `small business customers' bills over the life of the` `sourcing agreements, and (C) the maximum allowable` `return on equity for the project; and` `(iv) Commission review. If the General Assembly` `enacts authorizing legislation pursuant to` `subparagraph (iii) approving a sourcing agreement, the` `Commission shall, within 90 days of such enactment,` `complete a review of such sourcing agreement. During` `such time period, the Commission shall implement any` `directive of the General Assembly, resolve any` `disputes between the parties to the sourcing agreement` `concerning the terms of such agreement, approve the` `form of such agreement, and issue an order finding that` `the sourcing agreement is prudent and reasonable.` ``The facility cost report shall be prepared as follows:` `(A) The facility cost report shall be prepared by` `duly licensed engineering and construction firms` `detailing the estimated capital costs payable to one or` `more contractors or suppliers for the engineering,` `procurement and construction of the components` `comprising the initial clean coal facility and the` `estimated costs of operation and maintenance of the` `facility. The facility cost report shall include:` (i) an estimate of the capital cost of the core` `plant based on one or more front end engineering` `and design studies for the gasification island and` `related facilities. The core plant shall include` `all civil, structural, mechanical, electrical,` `control, and safety systems.` (ii) an estimate of the capital cost of the` `balance of the plant, including any capital costs` `associated with sequestration of carbon dioxide` `emissions and all interconnects and interfaces` `required to operate the facility, such as` `transmission of electricity, construction or` `backfeed power supply, pipelines to transport` `substitute natural gas or carbon dioxide, potable` `water supply, natural gas supply, water supply,` `water discharge, landfill, access roads, and coal` `delivery.` `The quoted construction costs shall be expressed` `in nominal dollars as of the date that the quote is` `prepared and shall include capitalized financing costs` `during construction, taxes, insurance, and other` `owner's costs, and an assumed escalation in materials` `and labor beyond the date as of which the construction` `cost quote is expressed.` `(B) The front end engineering and design study for` `the gasification island and the cost study for the` `balance of plant shall include sufficient design work` `to permit quantification of major categories of` `materials, commodities and labor hours, and receipt of` `quotes from vendors of major equipment required to` `construct and operate the clean coal facility.` `(C) The facility cost report shall also include an` `operating and maintenance cost quote that will provide` `the estimated cost of delivered fuel, personnel,` `maintenance contracts, chemicals, catalysts,` `consumables, spares, and other fixed and variable` `operations and maintenance costs. The delivered fuel` `cost estimate will be provided by a recognized third` `party expert or experts in the fuel and transportation` `industries. The balance of the operating and` `maintenance cost quote, excluding delivered fuel` `costs, will be developed based on the inputs provided` `by duly licensed engineering and construction firms` `performing the construction cost quote, potential` `vendors under long-term service agreements and plant` `operating agreements, or recognized third party plant` `operator or operators.` `The operating and maintenance cost quote` `(including the cost of the front end engineering and` `design study) shall be expressed in nominal dollars as` `of the date that the quote is prepared and shall` `include taxes, insurance, and other owner's costs, and` `an assumed escalation in materials and labor beyond the` `date as of which the operating and maintenance cost` `quote is expressed.` `(D) The facility cost report shall also include an` `analysis of the initial clean coal facility's ability` `to deliver power and energy into the applicable` `regional transmission organization markets and an` `analysis of the expected capacity factor for the` `initial clean coal facility.` `(E) Amounts paid to third parties unrelated to the` `owner or owners of the initial clean coal facility to` `prepare the core plant construction cost quote,` `including the front end engineering and design study,` `and the operating and maintenance cost quote will be` `reimbursed through Coal Development Bonds.` ``(5) Re-powering and retrofitting coal-fired power` `plants previously owned by Illinois utilities to qualify as` `clean coal facilities. During the 2009 procurement` `planning process and thereafter, the Agency and the` `Commission shall consider sourcing agreements covering` `electricity generated by power plants that were previously` `owned by Illinois utilities and that have been or will be` `converted into clean coal facilities, as defined by Section` `1-10 of this Act. Pursuant to such procurement planning` `process, the owners of such facilities may propose to the` `Agency sourcing agreements with utilities and alternative` `retail electric suppliers required to comply with` `subsection (d) of this Section and item (5) of subsection` `(d) of Section 16-115 of the Public Utilities Act, covering` `electricity generated by such facilities. In the case of` `sourcing agreements that are power purchase agreements,` `the contract price for electricity sales shall be` `established on a cost of service basis. In the case of` `sourcing agreements that are contracts for differences,` `the contract price from which the reference price is` `subtracted shall be established on a cost of service basis.` `The Agency and the Commission may approve any such utility` `sourcing agreements that do not exceed cost-based` `benchmarks developed by the procurement administrator, in` `consultation with the Commission staff, Agency staff and` `the procurement monitor, subject to Commission review and` `approval. The Commission shall have authority to inspect` `all books and records associated with these clean coal` `facilities during the term of any such contract.` ``(6) Costs incurred under this subsection (d) or` `pursuant to a contract entered into under this subsection` `(d) shall be deemed prudently incurred and reasonable in` `amount and the electric utility shall be entitled to full` `cost recovery pursuant to the tariffs filed with the` `Commission.` (d-5) Zero emission standard.` ``(1) Beginning with the delivery year commencing on June` `1, 2017, the Agency shall, for electric utilities that` `serve at least 100,000 retail customers in this State,` `procure contracts with zero emission facilities that are` `reasonably capable of generating cost-effective zero` `emission credits in an amount approximately equal to 16% of` `the actual amount of electricity delivered by each electric` `utility to retail customers in the State during calendar` `year 2014. For an electric utility serving fewer than` `100,000 retail customers in this State that requested,` `under Section 16-111.5 of the Public Utilities Act, that` `the Agency procure power and energy for all or a portion of` `the utility's Illinois load for the delivery year` `commencing June 1, 2016, the Agency shall procure contracts` `with zero emission facilities that are reasonably capable` `of generating cost-effective zero emission credits in an` `amount approximately equal to 16% of the portion of power` `and energy to be procured by the Agency for the utility.` `The duration of the contracts procured under this` `subsection (d-5) shall be for a term of 10 years ending May` `31, 2027. The quantity of zero emission credits to be` `procured under the contracts shall be all of the zero` `emission credits generated by the zero emission facility in` `each delivery year; however, if the zero emission facility` `is owned by more than one entity, then the quantity of zero` `emission credits to be procured under the contracts shall` `be the amount of zero emission credits that are generated` `from the portion of the zero emission facility that is` `owned by the winning supplier.` ``The 16% value identified in this paragraph (1) is the` `average of the percentage targets in subparagraph (B) of` `paragraph (1) of subsection (c) of Section 1-75 of this Act` `for the 5 delivery years beginning June 1, 2017.` ``The procurement process shall be subject to the` `following provisions:` `(A) Those zero emission facilities that intend to` `participate in the procurement shall submit to the` `Agency the following eligibility information for each` `zero emission facility on or before the date` `established by the Agency:` (i) the in-service date and remaining useful` `life of the zero emission facility;` (ii) the amount of power generated annually` `for each of the years 2005 through 2015, and the` `projected zero emission credits to be generated` `over the remaining useful life of the zero emission` `facility, which shall be used to determine the` `capability of each facility;` (iii) the annual zero emission facility cost` `projections, expressed on a per megawatthour` `basis, over the next 6 delivery years, which shall` `include the following: operation and maintenance` `expenses; fully allocated overhead costs, which` `shall be allocated using the methodology developed` `by the Institute for Nuclear Power Operations;` `fuel expenditures; non-fuel capital expenditures;` `spent fuel expenditures; a return on working` `capital; the cost of operational and market risks` `that could be avoided by ceasing operation; and any` `other costs necessary for continued operations,` `provided that "necessary" means, for purposes of` `this item (iii), that the costs could reasonably be` `avoided only by ceasing operations of the zero` `emission facility; and` (iv) a commitment to continue operating, for` `the duration of the contract or contracts executed` `under the procurement held under this subsection` `(d-5), the zero emission facility that produces` `the zero emission credits to be procured in the` `procurement.` ``The information described in item (iii) of this` `subparagraph (A) may be submitted on a confidential basis` `and shall be treated and maintained by the Agency, the` `procurement administrator, and the Commission as` `confidential and proprietary and exempt from disclosure` `under subparagraphs (a) and (g) of paragraph (1) of Section` `7 of the Freedom of Information Act. The Office of Attorney` `General shall have access to, and maintain the` `confidentiality of, such information pursuant to Section` `6.5 of the Attorney General Act. `(B) The price for each zero emission credit` `procured under this subsection (d-5) for each delivery` `year shall be in an amount that equals the Social Cost` `of Carbon, expressed on a price per megawatthour basis.` `However, to ensure that the procurement remains` `affordable to retail customers in this State if` `electricity prices increase, the price in an` `applicable delivery year shall be reduced below the` `Social Cost of Carbon by the amount ("Price` `Adjustment") by which the market price index for the` `applicable delivery year exceeds the baseline market` `price index for the consecutive 12-month period ending` `May 31, 2016. If the Price Adjustment is greater than` `or equal to the Social Cost of Carbon in an applicable` `delivery year, then no payments shall be due in that` `delivery year. The components of this calculation are` `defined as follows:` (i) Social Cost of Carbon: The Social Cost of` `Carbon is $16.50 per megawatthour, which is based` `on the U.S. Interagency Working Group on Social` `Cost of Carbon's price in the August 2016 Technical` `Update using a 3% discount rate, adjusted for` `inflation for each year of the program. Beginning` `with the delivery year commencing June 1, 2023, the` `price per megawatthour shall increase by $1 per` `megawatthour, and continue to increase by an` `additional $1 per megawatthour each delivery year` `thereafter.` (ii) Baseline market price index: The baseline` `market price index for the consecutive 12-month` `period ending May 31, 2016 is $31.40 per` `megawatthour, which is based on the sum of (aa) the` `average day-ahead energy price across all hours of` `such 12-month period at the PJM Interconnection` `LLC Northern Illinois Hub, (bb) 50% multiplied by` `the Base Residual Auction, or its successor,` `capacity price for the rest of the RTO zone group` `determined by PJM Interconnection LLC, divided by` `24 hours per day, and (cc) 50% multiplied by the` `Planning Resource Auction, or its successor,` `capacity price for Zone 4 determined by the` `Midcontinent Independent System Operator, Inc.,` `divided by 24 hours per day. (iii) Market price index: The market price` `index for a delivery year shall be the sum of` `projected energy prices and projected capacity` `prices determined as follows:` ``(aa) Projected energy prices: the` `projected energy prices for the applicable` `delivery year shall be calculated once for the` `year using the forward market price for the PJM` `Interconnection, LLC Northern Illinois Hub.` `The forward market price shall be calculated as` `follows: the energy forward prices for each` `month of the applicable delivery year averaged` `for each trade date during the calendar year` `immediately preceding that delivery year to` `produce a single energy forward price for the` `delivery year. The forward market price` `calculation shall use data published by the` `Intercontinental Exchange, or its successor.` ``(bb) Projected capacity prices:` `(I) For the delivery years commencing` `June 1, 2017, June 1, 2018, and June 1,` `2019, the projected capacity price shall` `be equal to the sum of (1) 50% multiplied` `by the Base Residual Auction, or its` `successor, price for the rest of the RTO` `zone group as determined by PJM` `Interconnection LLC, divided by 24 hours` `per day and, (2) 50% multiplied by the` `resource auction price determined in the` `resource auction administered by the` `Midcontinent Independent System Operator,` `Inc., in which the largest percentage of` `load cleared for Local Resource Zone 4,` `divided by 24 hours per day, and where such` `price is determined by the Midcontinent` `Independent System Operator, Inc.` `(II) For the delivery year commencing` `June 1, 2020, and each year thereafter, the` `projected capacity price shall be equal to` `the sum of (1) 50% multiplied by the Base` `Residual Auction, or its successor, price` `for the ComEd zone as determined by PJM` `Interconnection LLC, divided by 24 hours` `per day, and (2) 50% multiplied by the` `resource auction price determined in the` `resource auction administered by the` `Midcontinent Independent System Operator,` `Inc., in which the largest percentage of` `load cleared for Local Resource Zone 4,` `divided by 24 hours per day, and where such` `price is determined by the Midcontinent` `Independent System Operator, Inc.` `For purposes of this subsection (d-5):` "Rest of the RTO" and "ComEd Zone" shall have` `the meaning ascribed to them by PJM` `Interconnection, LLC. "RTO" means regional transmission` `organization. `(C) No later than 45 days after the effective date` `of this amendatory Act of the 99th General Assembly,` `the Agency shall publish its proposed zero emission` `standard procurement plan. The plan shall be` `consistent with the provisions of this paragraph (1)` `and shall provide that winning bids shall be selected` `based on public interest criteria that include, but are` `not limited to, minimizing carbon dioxide emissions` `that result from electricity consumed in Illinois and` `minimizing sulfur dioxide, nitrogen oxide, and` `particulate matter emissions that adversely affect the` `citizens of this State. In particular, the selection of` `winning bids shall take into account the incremental` `environmental benefits resulting from the procurement,` `such as any existing environmental benefits that are` `preserved by the procurements held under this` `amendatory Act of the 99th General Assembly and would` `cease to exist if the procurements were not held,` `including the preservation of zero emission` `facilities. The plan shall also describe in detail how` `each public interest factor shall be considered and` `weighted in the bid selection process to ensure that` `the public interest criteria are applied to the` `procurement and given full effect.` `For purposes of developing the plan, the Agency` `shall consider any reports issued by a State agency,` `board, or commission under House Resolution 1146 of the` `98th General Assembly and paragraph (4) of subsection` `(d) of Section 1-75 of this Act, as well as publicly` `available analyses and studies performed by or for` `regional transmission organizations that serve the` `State and their independent market monitors.` `Upon publishing of the zero emission standard` `procurement plan, copies of the plan shall be posted` `and made publicly available on the Agency's website.` `All interested parties shall have 10 days following the` `date of posting to provide comment to the Agency on the` `plan. All comments shall be posted to the Agency's` `website. Following the end of the comment period, but` `no more than 60 days later than the effective date of` `this amendatory Act of the 99th General Assembly, the` `Agency shall revise the plan as necessary based on the` `comments received and file its zero emission standard` `procurement plan with the Commission.` `If the Commission determines that the plan will` `result in the procurement of cost-effective zero` `emission credits, then the Commission shall, after` `notice and hearing, but no later than 45 days after the` `Agency filed the plan, approve the plan or approve with` `modification. For purposes of this subsection (d-5),` `"cost effective" means the projected costs of` `procuring zero emission credits from zero emission` `facilities do not cause the limit stated in paragraph` `(2) of this subsection to be exceeded.` `(C-5) As part of the Commission's review and` `acceptance or rejection of the procurement results,` `the Commission shall, in its public notice of` `successful bidders:` (i) identify how the winning bids satisfy the` `public interest criteria described in subparagraph` `(C) of this paragraph (1) of minimizing carbon` `dioxide emissions that result from electricity` `consumed in Illinois and minimizing sulfur` `dioxide, nitrogen oxide, and particulate matter` `emissions that adversely affect the citizens of` `this State;` (ii) specifically address how the selection of` `winning bids takes into account the incremental` `environmental benefits resulting from the` `procurement, including any existing environmental` `benefits that are preserved by the procurements` `held under this amendatory Act of the 99th General` `Assembly and would have ceased to exist if the` `procurements had not been held, such as the` `preservation of zero emission facilities;` (iii) quantify the environmental benefit of` `preserving the resources identified in item (ii)` `of this subparagraph (C-5), including the` `following:` ``(aa) the value of avoided greenhouse gas` `emissions measured as the product of the zero` `emission facilities' output over the contract` `term multiplied by the U.S. Environmental` `Protection Agency eGrid subregion carbon` `dioxide emission rate and the U.S. Interagency` `Working Group on Social Cost of Carbon's price` `in the August 2016 Technical Update using a 3%` `discount rate, adjusted for inflation for each` `delivery year; and` ``(bb) the costs of replacement with other` `zero carbon dioxide resources, including wind` `and photovoltaic, based upon the simple` `average of the following:` `(I) the price, or if there is more than` `one price, the average of the prices, paid` `for renewable energy credits from new` `utility-scale wind projects in the` `procurement events specified in item (i)` `of subparagraph (G) of paragraph (1) of` `subsection (c) of Section 1-75 of this Act;` `and` `(II) the price, or if there is more` `than one price, the average of the prices,` `paid for renewable energy credits from new` `utility-scale solar projects and` `brownfield site photovoltaic projects in` `the procurement events specified in item` `(ii) of subparagraph (G) of paragraph (1)` `of subsection (c) of Section 1-75 of this` `Act and, after January 1, 2015, renewable` `energy credits from photovoltaic` `distributed generation projects in` `procurement events held under subsection` `(c) of Section 1-75 of this Act. `Each utility shall enter into binding contractual arrangements` `with the winning suppliers.` `The procurement described in this subsection` `(d-5), including, but not limited to, the execution of` `all contracts procured, shall be completed no later` `than May 10, 2017. Based on the effective date of this` `amendatory Act of the 99th General Assembly, the Agency` `and Commission may, as appropriate, modify the various` `dates and timelines under this subparagraph and` `subparagraphs (C) and (D) of this paragraph (1). The` `procurement and plan approval processes required by` `this subsection (d-5) shall be conducted in` `conjunction with the procurement and plan approval` `processes required by subsection (c) of this Section` `and Section 16-111.5 of the Public Utilities Act, to` `the extent practicable. Notwithstanding whether a` `procurement event is conducted under Section 16-111.5` `of the Public Utilities Act, the Agency shall` `immediately initiate a procurement process on the` `effective date of this amendatory Act of the 99th` `General Assembly.` `(D) Following the procurement event described in` `this paragraph (1) and consistent with subparagraph` `(B) of this paragraph (1), the Agency shall calculate` `the payments to be made under each contract for the` `next delivery year based on the market price index for` `that delivery year. The Agency shall publish the` `payment calculations no later than May 25, 2017 and` `every May 25 thereafter.` `(E) Notwithstanding the requirements of this` `subsection (d-5), the contracts executed under this` `subsection (d-5) shall provide that the zero emission` `facility may, as applicable, suspend or terminate` `performance under the contracts in the following` `instances:` (i) A zero emission facility shall be excused` `from its performance under the contract for any` `cause beyond the control of the resource,` `including, but not restricted to, acts of God,` `flood, drought, earthquake, storm, fire,` `lightning, epidemic, war, riot, civil disturbance` `or disobedience, labor dispute, labor or material` `shortage, sabotage, acts of public enemy,` `explosions, orders, regulations or restrictions` `imposed by governmental, military, or lawfully` `established civilian authorities, which, in any of` `the foregoing cases, by exercise of commercially` `reasonable efforts the zero emission facility` `could not reasonably have been expected to avoid,` `and which, by the exercise of commercially` `reasonable efforts, it has been unable to` `overcome. In such event, the zero emission` `facility shall be excused from performance for the` `duration of the event, including, but not limited` `to, delivery of zero emission credits, and no` `payment shall be due to the zero emission facility` `during the duration of the event.` (ii) A zero emission facility shall be` `permitted to terminate the contract if legislation` `is enacted into law by the General Assembly that` `imposes or authorizes a new tax, special` `assessment, or fee on the generation of` `electricity, the ownership or leasehold of a` `generating unit, or the privilege or occupation of` `such generation, ownership, or leasehold of` `generation units by a zero emission facility.` `However, the provisions of this item (ii) do not` `apply to any generally applicable tax, special` `assessment or fee, or requirements imposed by` `federal law.` (iii) A zero emission facility shall be` `permitted to terminate the contract in the event` `that the resource requires capital expenditures in` `excess of $40,000,000 that were neither known nor` `reasonably foreseeable at the time it executed the` `contract and that a prudent owner or operator of` `such resource would not undertake.` (iv) A zero emission facility shall be` `permitted to terminate the contract in the event` `the Nuclear Regulatory Commission terminates the` `resource's license.` `(F) If the zero emission facility elects to` `terminate a contract under this subparagraph (E, of` `this paragraph (1), then the Commission shall reopen` `the docket in which the Commission approved the zero` `emission standard procurement plan under subparagraph` `(C) of this paragraph (1) and, after notice and` `hearing, enter an order acknowledging the contract` `termination election if such termination is consistent` `with the provisions of this subsection (d-5).` ``(2) For purposes of this subsection (d-5), the amount` `paid per kilowatthour means the total amount paid for` `electric service expressed on a per kilowatthour basis. For` `purposes of this subsection (d-5), the total amount paid` `for electric service includes, without limitation, amounts` `paid for supply, transmission, distribution, surcharges,` `and add-on taxes.` ``Notwithstanding the requirements of this subsection` `(d-5), the contracts executed under this subsection (d-5)` `shall provide that the total of zero emission credits` `procured under a procurement plan shall be subject to the` `limitations of this paragraph (2). For each delivery year,` `the contractual volume receiving payments in such year` `shall be reduced for all retail customers based on the` `amount necessary to limit the net increase that delivery` `year to the costs of those credits included in the amounts` `paid by eligible retail customers in connection with` `electric service to no more than 1.65% of the amount paid` `per kilowatthour by eligible retail customers during the` `year ending May 31, 2009. The result of this computation` `shall apply to and reduce the procurement for all retail` `customers, and all those customers shall pay the same` `single, uniform cents per kilowatthour charge under` `subsection (k) of Section 16-108 of the Public Utilities` `Act. To arrive at a maximum dollar amount of zero emission` `credits to be paid for the particular delivery year, the` `resulting per kilowatthour amount shall be applied to the` `actual amount of kilowatthours of electricity delivered by` `the electric utility in the delivery year immediately prior` `to the procurement, to all retail customers in its service` `territory. Unpaid contractual volume for any delivery year` `shall be paid in any subsequent delivery year in which such` `payments can be made without exceeding the amount specified` `in this paragraph (2). The calculations required by this` `paragraph (2) shall be made only once for each procurement` `plan year. Once the determination as to the amount of zero` `emission credits to be paid is made based on the` `calculations set forth in this paragraph (2), no subsequent` `rate impact determinations shall be made and no adjustments` `to those contract amounts shall be allowed. All costs` `incurred under those contracts and in implementing this` `subsection (d-5) shall be recovered by the electric utility` `as provided in this Section.` ``No later than June 30, 2019, the Commission shall` `review the limitation on the amount of zero emission` `credits procured under this subsection (d-5) and report to` `the General Assembly its findings as to whether that` `limitation unduly constrains the procurement of` `cost-effective zero emission credits. ``(3) Six years after the execution of a contract under` `this subsection (d-5), the Agency shall determine whether` `the actual zero emission credit payments received by the` `supplier over the 6-year period exceed the Average ZEC` `Payment. In addition, at the end of the term of a contract` `executed under this subsection (d-5), or at the time, if` `any, a zero emission facility's contract is terminated` `under subparagraph (E) of paragraph (1) of this subsection` `(d-5), then the Agency shall determine whether the actual` `zero emission credit payments received by the supplier over` `the term of the contract exceed the Average ZEC Payment,` `after taking into account any amounts previously credited` `back to the utility under this paragraph (3). If the Agency` `determines that the actual zero emission credit payments` `received by the supplier over the relevant period exceed` `the Average ZEC Payment, then the supplier shall credit the` `difference back to the utility. The amount of the credit` `shall be remitted to the applicable electric utility no` `later than 120 days after the Agency's determination, which` `the utility shall reflect as a credit on its retail` `customer bills as soon as practicable; however, the credit` `remitted to the utility shall not exceed the total amount` `of payments received by the facility under its contract.` ``For purposes of this Section, the Average ZEC Payment` `shall be calculated by multiplying the quantity of zero` `emission credits delivered under the contract times the` `average contract price. The average contract price shall be` `determined by subtracting the amount calculated under` `subparagraph (B) of this paragraph (3) from the amount` `calculated under subparagraph (A) of this paragraph (3), as` `follows:` `(A) The average of the Social Cost of Carbon, as` `defined in subparagraph (B) of paragraph (1) of this` `subsection (d-5), during the term of the contract.` `(B) The average of the market price indices, as` `defined in subparagraph (B) of paragraph (1) of this` `subsection (d-5), during the term of the contract,` `minus the baseline market price index, as defined in` `subparagraph (B) of paragraph (1) of this subsection` `(d-5).` If the subtraction yields a negative number, then the` `Average ZEC Payment shall be zero. ``(4) Cost-effective zero emission credits procured from` `zero emission facilities shall satisfy the applicable` `definitions set forth in Section 1-10 of this Act.` ``(5) The electric utility shall retire all zero emission` `credits used to comply with the requirements of this` `subsection (d-5).` ``(6) Electric utilities shall be entitled to recover all` `of the costs associated with the procurement of zero` `emission credits through an automatic adjustment clause` `tariff in accordance with subsection (k) and (m) of Section` `16-108 of the Public Utilities Act, and the contracts` `executed under this subsection (d-5) shall provide that the` `utilities' payment obligations under such contracts shall` `be reduced if an adjustment is required under subsection` `(m) of Section 16-108 of the Public Utilities Act.` ``(7) This subsection (d-5) shall become inoperative on` `January 1, 2028. (e) The draft procurement plans are subject to public` `comment, as required by Section 16-111.5 of the Public` `Utilities Act.` (f) The Agency shall submit the final procurement plan to` `the Commission. The Agency shall revise a procurement plan if` `the Commission determines that it does not meet the standards` `set forth in Section 16-111.5 of the Public Utilities Act.` (g) The Agency shall assess fees to each affected utility` `to recover the costs incurred in preparation of the annual` `procurement plan for the utility.` (h) The Agency shall assess fees to each bidder to recover` `the costs incurred in connection with a competitive procurement` `process. (i) A renewable energy credit, carbon emission credit, or` `zero emission credit can only be used once to comply with a` `single portfolio or other standard as set forth in subsection` `(c), subsection (d), or subsection (d-5) of this Section,` `respectively. A renewable energy credit, carbon emission` `credit, or zero emission credit cannot be used to satisfy the` `requirements of more than one standard. If more than one type` `of credit is issued for the same megawatt hour of energy, only` `one credit can be used to satisfy the requirements of a single` `standard. After such use, the credit must be retired together` `with any other credits issued for the same megawatt hour of` `energy. `(Source: P.A. 98-463, eff. 8-16-13; 99-536, eff. 7-8-16.)` Section 10.``The Illinois Procurement Code is amended by` `changing Section 20-10 as follows:` `` (30 ILCS 500/20-10) ` (Text of Section from P.A. 96-159, 96-588, 97-96, 97-895,` `and 98-1076)` Sec. 20-10.``Competitive sealed bidding; reverse auction. (a) Conditions for use. All contracts shall be awarded by` `competitive sealed bidding except as otherwise provided in` `Section 20-5. (b) Invitation for bids. An invitation for bids shall be` `issued and shall include a purchase description and the` `material contractual terms and conditions applicable to the` `procurement. (c) Public notice. Public notice of the invitation for bids` `shall be published in the Illinois Procurement Bulletin at` `least 14 calendar days before the date set in the invitation` `for the opening of bids. (d) Bid opening. Bids shall be opened publicly in the` `presence of one or more witnesses at the time and place` `designated in the invitation for bids. The name of each bidder,` `the amount of each bid, and other relevant information as may` `be specified by rule shall be recorded. After the award of the` `contract, the winning bid and the record of each unsuccessful` `bid shall be open to public inspection. (e) Bid acceptance and bid evaluation. Bids shall be` `unconditionally accepted without alteration or correction,` `except as authorized in this Code. Bids shall be evaluated` `based on the requirements set forth in the invitation for bids,` `which may include criteria to determine acceptability such as` `inspection, testing, quality, workmanship, delivery, and` `suitability for a particular purpose. Those criteria that will` `affect the bid price and be considered in evaluation for award,` `such as discounts, transportation costs, and total or life` `cycle costs, shall be objectively measurable. The invitation` `for bids shall set forth the evaluation criteria to be used. (f) Correction or withdrawal of bids. Correction or` `withdrawal of inadvertently erroneous bids before or after` `award, or cancellation of awards of contracts based on bid` `mistakes, shall be permitted in accordance with rules. After` `bid opening, no changes in bid prices or other provisions of` `bids prejudicial to the interest of the State or fair` `competition shall be permitted. All decisions to permit the` `correction or withdrawal of bids based on bid mistakes shall be` `supported by written determination made by a State purchasing` `officer. (g) Award. The contract shall be awarded with reasonable` `promptness by written notice to the lowest responsible and` `responsive bidder whose bid meets the requirements and criteria` `set forth in the invitation for bids, except when a State` `purchasing officer determines it is not in the best interest of` `the State and by written explanation determines another bidder` `shall receive the award. The explanation shall appear in the` `appropriate volume of the Illinois Procurement Bulletin. The` `written explanation must include: ``(1) a description of the agency's needs;` ``(2) a determination that the anticipated cost will be` `fair and reasonable;` ``(3) a listing of all responsible and responsive` `bidders; and` ``(4) the name of the bidder selected, the total contract` `price, and the reasons for selecting that bidder.` Each chief procurement officer may adopt guidelines to` `implement the requirements of this subsection (g).` The written explanation shall be filed with the Legislative` `Audit Commission and the Procurement Policy Board, and be made` `available for inspection by the public, within 30 calendar days` `after the agency's decision to award the contract.` (h) Multi-step sealed bidding. When it is considered` `impracticable to initially prepare a purchase description to` `support an award based on price, an invitation for bids may be` `issued requesting the submission of unpriced offers to be` `followed by an invitation for bids limited to those bidders` `whose offers have been qualified under the criteria set forth` `in the first solicitation. (i) Alternative procedures. Notwithstanding any other` `provision of this Act to the contrary, the Director of the` `Illinois Power Agency may create alternative bidding` `procedures to be used in procuring professional services under` `Section 1-56, subsections `subsection``(a)``and (c)``of Section` `1-75 and subsection (d) of Section 1-78 of the Illinois Power` `Agency Act and Section 16-111.5(c) of the Public Utilities Act` `and to procure renewable energy resources under Section 1-56 of` `the Illinois Power Agency Act. These alternative procedures` `shall be set forth together with the other criteria contained` `in the invitation for bids, and shall appear in the appropriate` `volume of the Illinois Procurement Bulletin.` (j) Reverse auction. Notwithstanding any other provision` `of this Section and in accordance with rules adopted by the` `chief procurement officer, that chief procurement officer may` `procure supplies or services through a competitive electronic` `auction bidding process after the chief procurement officer` `determines that the use of such a process will be in the best` `interest of the State. The chief procurement officer shall` `publish that determination in his or her next volume of the` `Illinois Procurement Bulletin.` An invitation for bids shall be issued and shall include` `(i) a procurement description, (ii) all contractual terms,` `whenever practical, and (iii) conditions applicable to the` `procurement, including a notice that bids will be received in` `an electronic auction manner.` Public notice of the invitation for bids shall be given in` `the same manner as provided in subsection (c).` Bids shall be accepted electronically at the time and in` `the manner designated in the invitation for bids. During the` `auction, a bidder's price shall be disclosed to other bidders.` `Bidders shall have the opportunity to reduce their bid prices` `during the auction. At the conclusion of the auction, the` `record of the bid prices received and the name of each bidder` `shall be open to public inspection.` After the auction period has terminated, withdrawal of bids` `shall be permitted as provided in subsection (f).` The contract shall be awarded within 60 calendar days after` `the auction by written notice to the lowest responsible bidder,` `or all bids shall be rejected except as otherwise provided in` `this Code. Extensions of the date for the award may be made by` `mutual written consent of the State purchasing officer and the` `lowest responsible bidder.` This subsection does not apply to (i) procurements of` `professional and artistic services, (ii) telecommunications` `services, communication services, and information services,` `and (iii) contracts for construction projects, including` `design professional services.` `(Source: P.A. 97-96, eff. 7-13-11; 97-895, eff. 8-3-12;` `98-1076, eff. 1-1-15.) (Text of Section from P.A. 96-159, 96-795, 97-96, 97-895,` `and 98-1076) Sec. 20-10.``Competitive sealed bidding; reverse auction. (a) Conditions for use. All contracts shall be awarded by` `competitive sealed bidding except as otherwise provided in` `Section 20-5. (b) Invitation for bids. An invitation for bids shall be` `issued and shall include a purchase description and the` `material contractual terms and conditions applicable to the` `procurement. (c) Public notice. Public notice of the invitation for bids` `shall be published in the Illinois Procurement Bulletin at` `least 14 calendar days before the date set in the invitation` `for the opening of bids. (d) Bid opening. Bids shall be opened publicly in the` `presence of one or more witnesses at the time and place` `designated in the invitation for bids. The name of each bidder,` `the amount of each bid, and other relevant information as may` `be specified by rule shall be recorded. After the award of the` `contract, the winning bid and the record of each unsuccessful` `bid shall be open to public inspection. (e) Bid acceptance and bid evaluation. Bids shall be` `unconditionally accepted without alteration or correction,` `except as authorized in this Code. Bids shall be evaluated` `based on the requirements set forth in the invitation for bids,` `which may include criteria to determine acceptability such as` `inspection, testing, quality, workmanship, delivery, and` `suitability for a particular purpose. Those criteria that will` `affect the bid price and be considered in evaluation for award,` `such as discounts, transportation costs, and total or life` `cycle costs, shall be objectively measurable. The invitation` `for bids shall set forth the evaluation criteria to be used. (f) Correction or withdrawal of bids. Correction or` `withdrawal of inadvertently erroneous bids before or after` `award, or cancellation of awards of contracts based on bid` `mistakes, shall be permitted in accordance with rules. After` `bid opening, no changes in bid prices or other provisions of` `bids prejudicial to the interest of the State or fair` `competition shall be permitted. All decisions to permit the` `correction or withdrawal of bids based on bid mistakes shall be` `supported by written determination made by a State purchasing` `officer. (g) Award. The contract shall be awarded with reasonable` `promptness by written notice to the lowest responsible and` `responsive bidder whose bid meets the requirements and criteria` `set forth in the invitation for bids, except when a State` `purchasing officer determines it is not in the best interest of` `the State and by written explanation determines another bidder` `shall receive the award. The explanation shall appear in the` `appropriate volume of the Illinois Procurement Bulletin. The` `written explanation must include: ``(1) a description of the agency's needs;` ``(2) a determination that the anticipated cost will be` `fair and reasonable;` ``(3) a listing of all responsible and responsive` `bidders; and` ``(4) the name of the bidder selected, the total contract` `price, and the reasons for selecting that bidder.` Each chief procurement officer may adopt guidelines to` `implement the requirements of this subsection (g).` The written explanation shall be filed with the Legislative` `Audit Commission and the Procurement Policy Board, and be made` `available for inspection by the public, within 30 days after` `the agency's decision to award the contract.` (h) Multi-step sealed bidding. When it is considered` `impracticable to initially prepare a purchase description to` `support an award based on price, an invitation for bids may be` `issued requesting the submission of unpriced offers to be` `followed by an invitation for bids limited to those bidders` `whose offers have been qualified under the criteria set forth` `in the first solicitation. (i) Alternative procedures. Notwithstanding any other` `provision of this Act to the contrary, the Director of the` `Illinois Power Agency may create alternative bidding` `procedures to be used in procuring professional services under` `subsections `subsection``(a)``and (c)``of Section 1-75 and` `subsection (d) of Section 1-78 of the Illinois Power Agency Act` `and Section 16-111.5(c) of the Public Utilities Act and to` `procure renewable energy resources under Section 1-56 of the` `Illinois Power Agency Act. These alternative procedures shall` `be set forth together with the other criteria contained in the` `invitation for bids, and shall appear in the appropriate volume` `of the Illinois Procurement Bulletin.` (j) Reverse auction. Notwithstanding any other provision` `of this Section and in accordance with rules adopted by the` `chief procurement officer, that chief procurement officer may` `procure supplies or services through a competitive electronic` `auction bidding process after the chief procurement officer` `determines that the use of such a process will be in the best` `interest of the State. The chief procurement officer shall` `publish that determination in his or her next volume of the` `Illinois Procurement Bulletin.` An invitation for bids shall be issued and shall include` `(i) a procurement description, (ii) all contractual terms,` `whenever practical, and (iii) conditions applicable to the` `procurement, including a notice that bids will be received in` `an electronic auction manner.` Public notice of the invitation for bids shall be given in` `the same manner as provided in subsection (c).` Bids shall be accepted electronically at the time and in` `the manner designated in the invitation for bids. During the` `auction, a bidder's price shall be disclosed to other bidders.` `Bidders shall have the opportunity to reduce their bid prices` `during the auction. At the conclusion of the auction, the` `record of the bid prices received and the name of each bidder` `shall be open to public inspection.` After the auction period has terminated, withdrawal of bids` `shall be permitted as provided in subsection (f).` The contract shall be awarded within 60 calendar days after` `the auction by written notice to the lowest responsible bidder,` `or all bids shall be rejected except as otherwise provided in` `this Code. Extensions of the date for the award may be made by` `mutual written consent of the State purchasing officer and the` `lowest responsible bidder.` This subsection does not apply to (i) procurements of` `professional and artistic services, (ii) telecommunications` `services, communication services, and information services,` `and (iii) contracts for construction projects, including` `design professional services.` `(Source: P.A. 97-96, eff. 7-13-11; 97-895, eff. 8-3-12;` `98-1076, eff. 1-1-15``.)` Section 15.``The Public Utilities Act is amended by changing` `Sections 5-117, 5-202.1, 8-103, 8-104, 16-107, 16-107.5,` `16-108, 16-108.5, 16-111.1, 16-111.5, 16-111.5B, 16-111.7,` `16-115D, 16-119A, 16-127, and 16-128A and by adding Sections` `8-103B, 9-107, 16-107.6, 16-108.10, 16-108.11, 16-108.12,` `16-108.15, and 16-108.16 as follows:` (220 ILCS 5/5-117)` Sec. 5-117.``Supplier diversity goals.` (a) The public policy of this State is to collaboratively` `work with companies that serve Illinois residents to improve` `their supplier diversity in a non-antagonistic manner.` (b) The Commission shall require all gas, electric, and` `water companies with at least 100,000 customers under its` `authority``, as well as suppliers of wind energy, solar energy,` `hydroelectricity, nuclear energy, and any other supplier of` `energy within this State,``to submit an annual report by April` `15, 2015 and every April 15 thereafter, in a searchable Adobe` `PDF format, on all procurement goals and actual spending for` `female-owned, minority-owned, veteran-owned, and small` `business enterprises in the previous calendar year. These goals` `shall be expressed as a percentage of the total work performed` `by the entity submitting the report, and the actual spending` `for all female-owned, minority-owned, veteran-owned, and small` `business enterprises shall also be expressed as a percentage of` `the total work performed by the entity submitting the report.` (c) Each participating company in its annual report shall` `include the following information:` ``(1) an explanation of the plan for the next year to` `increase participation;` ``(2) an explanation of the plan to increase the goals;` ``(3) the areas of procurement each company shall be` `actively seeking more participation in in the next year;` ``(4) an outline of the plan to alert and encourage` `potential vendors in that area to seek business from the` `company;` ``(5) an explanation of the challenges faced in finding` `quality vendors and offer any suggestions for what the` `Commission could do to be helpful to identify those` `vendors;` ``(6) a list of the certifications the company` `recognizes;` ``(7) the point of contact for any potential vendor who` `wishes to do business with the company and explain the` `process for a vendor to enroll with the company as a` `minority-owned, women-owned, or veteran-owned company; and` ``(8) any particular success stories to encourage other` `companies to emulate best practices.` (d) Each annual report shall include as much State-specific` `data as possible. If the submitting entity does not submit` `State-specific data, then the company shall include any` `national data it does have and explain why it could not submit` `State-specific data and how it intends to do so in future` `reports, if possible.` (e) Each annual report shall include the rules,` `regulations, and definitions used for the procurement goals in` `the company's annual report.` (f) The Commission and all participating entities shall` `hold an annual workshop open to the public in 2015 and every` `year thereafter on the state of supplier diversity to` `collaboratively seek solutions to structural impediments to` `achieving stated goals, including testimony from each` `participating entity as well as subject matter experts and` `advocates. The Commission shall publish a database on its` `website of the point of contact for each participating entity` `for supplier diversity, along with a list of certifications` `each company recognizes from the information submitted in each` `annual report. The Commission shall publish each annual report` `on its website and shall maintain each annual report for at` `least 5 years. `(Source: P.A. 98-1056, eff. 8-26-14.)` (220 ILCS 5/5-202.1) ` Sec. 5-202.1.``Misrepresentation before Commission;` `penalty. (a) Any person or corporation, as defined in Sections 3-113` `and 3-114 of this Act, who knowingly misrepresents facts``to the` `Commission in response to any Commission contact, inquiry or` `discussion``or knowingly aids another in doing so``in response to` `any Commission contact, inquiry or discussion``or knowingly` `permits another to misrepresent facts through testimony or the` `offering or withholding of material information in any` `proceeding shall be subject to a civil penalty. Whenever the` `Commission is of the opinion that a person or corporation is` `misrepresenting or has misrepresented facts, the Commission` `may initiate a proceeding to determine whether a` `misrepresentation has in fact occurred. If the Commission finds` `that a person or corporation has violated this Section, the` `Commission shall impose a penalty of not less than $1,000``and` `not greater than $500,000``. Each misrepresentation of a fact` `found by the Commission shall constitute a separate and` `distinct violation. In determining the amount of the penalty to` `be assessed, the Commission may consider any matters of record` `in aggravation or mitigation of the penalty, as set forth in` `Section 4-203, including but not limited to the following: `` ``(1) the presence or absence of due diligence on the` `part of the violator in attempting to comply with the Act; `` ``(2) any economic benefits accrued, or expected to be` `accrued, by the violator because of the misrepresentation;` `and `` ``(3) the amount of monetary penalty that will serve to` `deter further violations by the violator and to otherwise` `aid in enhancing voluntary compliance with the Act. (b) Any action to enforce civil penalties arising under` `this Section shall be undertaken pursuant to Section 4-203. (c) For purposes of this Section, "Commission," as defined` `in Section 3-102, refers to any Commissioner, agent, or` `employee of the Illinois Commerce commission, and also refers` `to any other person engaged to represent the Commission in` `carrying out its regulatory or law enforcement obligations. `(Source: P.A. 93-457, eff. 8-8-03.) ` (220 ILCS 5/8-103) `` Sec. 8-103.``Energy efficiency and demand-response` `measures.` (a) It is the policy of the State that electric utilities` `are required to use cost-effective energy efficiency and` `demand-response measures to reduce delivery load. Requiring` `investment in cost-effective energy efficiency and` `demand-response measures will reduce direct and indirect costs` `to consumers by decreasing environmental impacts and by` `avoiding or delaying the need for new generation, transmission,` `and distribution infrastructure. It serves the public interest` `to allow electric utilities to recover costs for reasonably and` `prudently incurred expenses for energy efficiency and` `demand-response measures. As used in this Section,` `"cost-effective" means that the measures satisfy the total` `resource cost test. The low-income measures described in` `subsection (f)(4) of this Section shall not be required to meet` `the total resource cost test. For purposes of this Section, the` `terms "energy-efficiency", "demand-response", "electric` `utility", and "total resource cost test" shall have the` `meanings set forth in the Illinois Power Agency Act. For` `purposes of this Section, the amount per kilowatthour means the` `total amount paid for electric service expressed on a per` `kilowatthour basis. For purposes of this Section, the total` `amount paid for electric service includes without limitation` `estimated amounts paid for supply, transmission, distribution,` `surcharges, and add-on-taxes.` (a-5) This Section applies to electric utilities serving` `500,000 or less but more than 200,000 retail customers in this` `State. Through December 31, 2017, this Section also applies to` `electric utilities serving more than 500,000 retail customers` `in the State. (b) Electric utilities shall implement cost-effective` `energy efficiency measures to meet the following incremental` `annual energy savings goals:` ``(1) 0.2% of energy delivered in the year commencing` `June 1, 2008;` ``(2) 0.4% of energy delivered in the year commencing` `June 1, 2009;` ``(3) 0.6% of energy delivered in the year commencing` `June 1, 2010;` ``(4) 0.8% of energy delivered in the year commencing` `June 1, 2011;` ``(5) 1% of energy delivered in the year commencing June` `1, 2012;` ``(6) 1.4% of energy delivered in the year commencing` `June 1, 2013;` ``(7) 1.8% of energy delivered in the year commencing` `June 1, 2014; and` ``(8) 2% of energy delivered in the year commencing June` `1, 2015 and each year thereafter.` Electric utilities may comply with this subsection (b) by` `meeting the annual incremental savings goal in the applicable` `year or by showing that the total cumulative annual savings` `within a 3-year planning period associated with measures` `implemented after May 31, 2014 was equal to the sum of each` `annual incremental savings requirement from May 31, 2014` `through the end of the applicable year.` (c) Electric utilities shall implement cost-effective` `demand-response measures to reduce peak demand by 0.1% over the` `prior year for eligible retail customers, as defined in Section` `16-111.5 of this Act, and for customers that elect hourly` `service from the utility pursuant to Section 16-107 of this` `Act, provided those customers have not been declared` `competitive. This requirement commences June 1, 2008 and` `continues for 10 years.` (d) Notwithstanding the requirements of subsections (b)` `and (c) of this Section, an electric utility shall reduce the` `amount of energy efficiency and demand-response measures` `implemented over a 3-year planning period by an amount` `necessary to limit the estimated average annual increase in the` `amounts paid by retail customers in connection with electric` `service due to the cost of those measures to:` ``(1) in 2008, no more than 0.5% of the amount paid per` `kilowatthour by those customers during the year ending May` `31, 2007;` ``(2) in 2009, the greater of an additional 0.5% of the` `amount paid per kilowatthour by those customers during the` `year ending May 31, 2008 or 1% of the amount paid per` `kilowatthour by those customers during the year ending May` `31, 2007;` ``(3) in 2010, the greater of an additional 0.5% of the` `amount paid per kilowatthour by those customers during the` `year ending May 31, 2009 or 1.5% of the amount paid per` `kilowatthour by those customers during the year ending May` `31, 2007;` ``(4) in 2011, the greater of an additional 0.5% of the` `amount paid per kilowatthour by those customers during the` `year ending May 31, 2010 or 2% of the amount paid per` `kilowatthour by those customers during the year ending May` `31, 2007; and` ``(5) thereafter, the amount of energy efficiency and` `demand-response measures implemented for any single year` `shall be reduced by an amount necessary to limit the` `estimated average net increase due to the cost of these` `measures included in the amounts paid by eligible retail` `customers in connection with electric service to no more` `than the greater of 2.015% of the amount paid per` `kilowatthour by those customers during the year ending May` `31, 2007 or the incremental amount per kilowatthour paid` `for these measures in 2011.` No later than June 30, 2011, the Commission shall review` `the limitation on the amount of energy efficiency and` `demand-response measures implemented pursuant to this Section` `and report to the General Assembly its findings as to whether` `that limitation unduly constrains the procurement of energy` `efficiency and demand-response measures.` (e) Electric utilities shall be responsible for overseeing` `the design, development, and filing of energy efficiency and` `demand-response plans with the Commission. Electric utilities` `shall implement 100% of the demand-response measures in the` `plans. Electric utilities shall implement 75% of the energy` `efficiency measures approved by the Commission, and may, as` `part of that implementation, outsource various aspects of` `program development and implementation. The remaining 25% of` `those energy efficiency measures approved by the Commission` `shall be implemented by the Department of Commerce and Economic` `Opportunity, and must be designed in conjunction with the` `utility and the filing process. The Department may outsource` `development and implementation of energy efficiency measures.` `A minimum of 10% of the entire portfolio of cost-effective` `energy efficiency measures shall be procured from units of` `local government, municipal corporations, school districts,` `and community college districts. The Department shall` `coordinate the implementation of these measures.` The apportionment of the dollars to cover the costs to` `implement the Department's share of the portfolio of energy` `efficiency measures shall be made to the Department once the` `Department has executed rebate agreements, grants, or` `contracts for energy efficiency measures and provided` `supporting documentation for those rebate agreements, grants,` `and contracts to the utility. The Department is authorized to` `adopt any rules necessary and prescribe procedures in order to` `ensure compliance by applicants in carrying out the purposes of` `rebate agreements for energy efficiency measures implemented` `by the Department made under this Section.` The details of the measures implemented by the Department` `shall be submitted by the Department to the Commission in` `connection with the utility's filing regarding the energy` `efficiency and demand-response measures that the utility` `implements.` A utility providing approved energy efficiency and` `demand-response measures in the State shall be permitted to` `recover costs of those measures through an automatic adjustment` `clause tariff filed with and approved by the Commission. The` `tariff shall be established outside the context of a general` `rate case. Each year the Commission shall initiate a review to` `reconcile any amounts collected with the actual costs and to` `determine the required adjustment to the annual tariff factor` `to match annual expenditures.` Each utility shall include, in its recovery of costs, the` `costs estimated for both the utility's and the Department's` `implementation of energy efficiency and demand-response` `measures. Costs collected by the utility for measures` `implemented by the Department shall be submitted to the` `Department pursuant to Section 605-323 of the Civil` `Administrative Code of Illinois, shall be deposited into the` `Energy Efficiency Portfolio Standards Fund, and shall be used` `by the Department solely for the purpose of implementing these` `measures. A utility shall not be required to advance any moneys` `to the Department but only to forward such funds as it has` `collected. The Department shall report to the Commission on an` `annual basis regarding the costs actually incurred by the` `Department in the implementation of the measures. Any changes` `to the costs of energy efficiency measures as a result of plan` `modifications shall be appropriately reflected in amounts` `recovered by the utility and turned over to the Department.` The portfolio of measures, administered by both the` `utilities and the Department, shall, in combination, be` `designed to achieve the annual savings targets described in` `subsections (b) and (c) of this Section, as modified by` `subsection (d) of this Section.` The utility and the Department shall agree upon a` `reasonable portfolio of measures and determine the measurable` `corresponding percentage of the savings goals associated with` `measures implemented by the utility or Department.` No utility shall be assessed a penalty under subsection (f)` `of this Section for failure to make a timely filing if that` `failure is the result of a lack of agreement with the` `Department with respect to the allocation of responsibilities` `or related costs or target assignments. In that case, the` `Department and the utility shall file their respective plans` `with the Commission and the Commission shall determine an` `appropriate division of measures and programs that meets the` `requirements of this Section.` If the Department is unable to meet incremental annual` `performance goals for the portion of the portfolio implemented` `by the Department, then the utility and the Department shall` `jointly submit a modified filing to the Commission explaining` `the performance shortfall and recommending an appropriate` `course going forward, including any program modifications that` `may be appropriate in light of the evaluations conducted under` `item (7) of subsection (f) of this Section. In this case, the` `utility obligation to collect the Department's costs and turn` `over those funds to the Department under this subsection (e)` `shall continue only if the Commission approves the` `modifications to the plan proposed by the Department.` (f) No later than November 15, 2007, each electric utility` `shall file an energy efficiency and demand-response plan with` `the Commission to meet the energy efficiency and` `demand-response standards for 2008 through 2010. No later than` `October 1, 2010, each electric utility shall file an energy` `efficiency and demand-response plan with the Commission to meet` `the energy efficiency and demand-response standards for 2011` `through 2013. Every 3 years thereafter, each electric utility` `shall file, no later than September 1, an energy efficiency and` `demand-response plan with the Commission. If a utility does not` `file such a plan by September 1 of an applicable year, it shall` `face a penalty of $100,000 per day until the plan is filed.` `Each utility's plan shall set forth the utility's proposals to` `meet the utility's portion of the energy efficiency standards` `identified in subsection (b) and the demand-response standards` `identified in subsection (c) of this Section as modified by` `subsections (d) and (e), taking into account the unique` `circumstances of the utility's service territory. The` `Commission shall seek public comment on the utility's plan and` `shall issue an order approving or disapproving each plan within` `5 months after its submission. If the Commission disapproves a` `plan, the Commission shall, within 30 days, describe in detail` `the reasons for the disapproval and describe a path by which` `the utility may file a revised draft of the plan to address the` `Commission's concerns satisfactorily. If the utility does not` `refile with the Commission within 60 days, the utility shall be` `subject to penalties at a rate of $100,000 per day until the` `plan is filed. This process shall continue, and penalties shall` `accrue, until the utility has successfully filed a portfolio of` `energy efficiency and demand-response measures. Penalties` `shall be deposited into the Energy Efficiency Trust Fund. In` `submitting proposed energy efficiency and demand-response` `plans and funding levels to meet the savings goals adopted by` `this Act the utility shall:` ``(1) Demonstrate that its proposed energy efficiency` `and demand-response measures will achieve the requirements` `that are identified in subsections (b) and (c) of this` `Section, as modified by subsections (d) and (e).` ``(2) Present specific proposals to implement new` `building and appliance standards that have been placed into` `effect.` ``(3) Present estimates of the total amount paid for` `electric service expressed on a per kilowatthour basis` `associated with the proposed portfolio of measures` `designed to meet the requirements that are identified in` `subsections (b) and (c) of this Section, as modified by` `subsections (d) and (e).` ``(4) Coordinate with the Department to present a` `portfolio of energy efficiency measures proportionate to` `the share of total annual utility revenues in Illinois from` `households at or below 150% of the poverty level. The` `energy efficiency programs shall be targeted to households` `with incomes at or below 80% of area median income.` ``(5) Demonstrate that its overall portfolio of energy` `efficiency and demand-response measures, not including` `programs covered by item (4) of this subsection (f), are` `cost-effective using the total resource cost test and` `represent a diverse cross-section of opportunities for` `customers of all rate classes to participate in the` `programs.` ``(6) Include a proposed cost-recovery tariff mechanism` `to fund the proposed energy efficiency and demand-response` `measures and to ensure the recovery of the prudently and` `reasonably incurred costs of Commission-approved programs.` ``(7) Provide for an annual independent evaluation of the` `performance of the cost-effectiveness of the utility's` `portfolio of measures and the Department's portfolio of` `measures, as well as a full review of the 3-year results of` `the broader net program impacts and, to the extent` `practical, for adjustment of the measures on a` `going-forward basis as a result of the evaluations. The` `resources dedicated to evaluation shall not exceed 3% of` `portfolio resources in any given year.` (g) No more than 3% of energy efficiency and` `demand-response program revenue may be allocated for` `demonstration of breakthrough equipment and devices.` (h) This Section does not apply to an electric utility that` `on December 31, 2005 provided electric service to fewer than` `100,000 customers in Illinois.` (i) If, after 2 years, an electric utility fails to meet` `the efficiency standard specified in subsection (b) of this` `Section, as modified by subsections (d) and (e), it shall make` `a contribution to the Low-Income Home Energy Assistance` `Program. The combined total liability for failure to meet the` `goal shall be $1,000,000, which shall be assessed as follows: a` `large electric utility shall pay $665,000, and a medium` `electric utility shall pay $335,000. If, after 3 years, an` `electric utility fails to meet the efficiency standard` `specified in subsection (b) of this Section, as modified by` `subsections (d) and (e), it shall make a contribution to the` `Low-Income Home Energy Assistance Program. The combined total` `liability for failure to meet the goal shall be $1,000,000,` `which shall be assessed as follows: a large electric utility` `shall pay $665,000, and a medium electric utility shall pay` `$335,000. In addition, the responsibility for implementing the` `energy efficiency measures of the utility making the payment` `shall be transferred to the Illinois Power Agency if, after 3` `years, or in any subsequent 3-year period, the utility fails to` `meet the efficiency standard specified in subsection (b) of` `this Section, as modified by subsections (d) and (e). The` `Agency shall implement a competitive procurement program to` `procure resources necessary to meet the standards specified in` `this Section as modified by subsections (d) and (e), with costs` `for those resources to be recovered in the same manner as` `products purchased through the procurement plan as provided in` `Section 16-111.5. The Director shall implement this` `requirement in connection with the procurement plan as provided` `in Section 16-111.5.` For purposes of this Section, (i) a "large electric` `utility" is an electric utility that, on December 31, 2005,` `served more than 2,000,000 electric customers in Illinois; (ii)` `a "medium electric utility" is an electric utility that, on` `December 31, 2005, served 2,000,000 or fewer but more than` `100,000 electric customers in Illinois; and (iii) Illinois` `electric utilities that are affiliated by virtue of a common` `parent company are considered a single electric utility.` (j) If, after 3 years, or any subsequent 3-year period, the` `Department fails to implement the Department's share of energy` `efficiency measures required by the standards in subsection` `(b), then the Illinois Power Agency may assume responsibility` `for and control of the Department's share of the required` `energy efficiency measures. The Agency shall implement a` `competitive procurement program to procure resources necessary` `to meet the standards specified in this Section, with the costs` `of these resources to be recovered in the same manner as` `provided for the Department in this Section.` (k) No electric utility shall be deemed to have failed to` `meet the energy efficiency standards to the extent any such` `failure is due to a failure of the Department or the Agency. (l)(1) The energy efficiency and demand-response plans of` `electric utilities serving more than 500,000 retail customers` `in the State that were approved by the Commission on or before` `the effective date of this amendatory Act of the 99th General` `Assembly for the period June 1, 2014 through May 31, 2017 shall` `continue to be in force and effect through December 31, 2017 so` `that the energy efficiency programs set forth in those plans` `continue to be offered during the period June 1, 2017 through` `December 31, 2017. Each such utility is authorized to increase,` `on a pro rata basis, the energy savings goals and budgets` `approved in its plan to reflect the additional 7 months of the` `plan's operation, provided that such increase shall also` `incorporate reductions to goals and budgets to reflect the` `proportion of the utility's load attributable to customers who` `are exempt from this Section under subsection (m) of this` `Section. ``(2) If an electric utility serving more than 500,000` `retail customers in the State filed with the Commission,` `under subsection (f) of this Section, its proposed energy` `efficiency and demand-response plan for the period June 1,` `2017 through May 31, 2020, and the Commission has not yet` `entered its final order approving such plan on or before` `the effective date of this amendatory Act of the 99th` `General Assembly, then the utility shall file a notice of` `withdrawal with the Commission, following such effective` `date, to withdraw the proposed energy efficiency and` `demand-response plan. Upon receipt of such notice, the` `Commission shall dismiss with prejudice any docket that had` `been initiated to investigate such plan, and the plan and` `the record related thereto shall not be the subject of any` `further hearing, investigation, or proceeding of any kind. ``(3) For those electric utilities that serve more than` `500,000 retail customers in the State, this amendatory Act` `of the 99th General Assembly preempts and supersedes any` `orders entered by the Commission that approved such` `utilities' energy efficiency and demand response plans for` `the period commencing June 1, 2017 and ending May 31, 2020.` `Any such orders shall be void, and the provisions of` `paragraph (1) of this subsection (l) shall apply. `(m) Notwithstanding anything to the contrary, after May 31,` `2017, this Section does not apply to any retail customers of an` `electric utility that serves more than 3,000,000 retail` `customers in the State and whose total highest 30 minute demand` `was more than 10,000 kilowatts, or any retail customers of an` `electric utility that serves less than 3,000,000 retail` `customers but more than 500,000 retail customers in the State` `and whose total highest 15 minute demand was more than 10,000` `kilowatts. For purposes of this subsection (m), "retail` `customer" has the meaning set forth in Section 16-102 of this` `Act. The criteria for determining whether this subsection (m)` `is applicable to a retail customer shall be based on the 12` `consecutive billing periods prior to the start of the first` `year of each such multi-year plan. `(Source: P.A. 97-616, eff. 10-26-11; 97-841, eff. 7-20-12;` `98-90, eff. 7-15-13.) (220 ILCS 5/8-103B new)` Sec. 8-103B.``Energy efficiency and demand-response` `measures.` (a) It is the policy of the State that electric utilities` `are required to use cost-effective energy efficiency and` `demand-response measures to reduce delivery load. Requiring` `investment in cost-effective energy efficiency and` `demand-response measures will reduce direct and indirect costs` `to consumers by decreasing environmental impacts and by` `avoiding or delaying the need for new generation, transmission,` `and distribution infrastructure. It serves the public interest` `to allow electric utilities to recover costs for reasonably and` `prudently incurred expenditures for energy efficiency and` `demand-response measures. As used in this Section,` `"cost-effective" means that the measures satisfy the total` `resource cost test. The low-income measures described in` `subsection (c) of this Section shall not be required to meet` `the total resource cost test. For purposes of this Section, the` `terms "energy-efficiency", "demand-response", "electric` `utility", and "total resource cost test" have the meanings set` `forth in the Illinois Power Agency Act. (a-5) This Section applies to electric utilities serving` `more than 500,000 retail customers in the State for those` `multi-year plans commencing after December 31, 2017. (b) For purposes of this Section, electric utilities` `subject to this Section that serve more than 3,000,000 retail` `customers in the State shall be deemed to have achieved a` `cumulative persisting annual savings of 6.6% from energy` `efficiency measures and programs implemented during the period` `beginning January 1, 2012 and ending December 31, 2017, which` `percent is based on the deemed average weather normalized sales` `of electric power and energy during calendar years 2014, 2015,` `and 2016 of 88,000,000 MWhs. For the purposes of this` `subsection (b) and subsection (b-5), the 88,000,000 MWhs of` `deemed electric power and energy sales shall be reduced by the` `number of MWhs equal to the sum of the annual consumption of` `customers that are exempt from subsections (a) through (j) of` `this Section under subsection (l) of this Section, as averaged` `across the calendar years 2014, 2015, and 2016. After 2017, the` `deemed value of cumulative persisting annual savings from` `energy efficiency measures and programs implemented during the` `period beginning January 1, 2012 and ending December 31, 2017,` `shall be reduced each year, as follows, and the applicable` `value shall be applied to and count toward the utility's` `achievement of the cumulative persisting annual savings goals` `set forth in subsection (b-5):` ``(1) 5.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2018;` ``(2) 5.2% deemed cumulative persisting annual savings` `for the year ending December 31, 2019;` ``(3) 4.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2020;` ``(4) 4.0% deemed cumulative persisting annual savings` `for the year ending December 31, 2021;` ``(5) 3.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2022;` ``(6) 3.1% deemed cumulative persisting annual savings` `for the year ending December 31, 2023;` ``(7) 2.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2024;` ``(8) 2.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2025;` ``(9) 2.3% deemed cumulative persisting annual savings` `for the year ending December 31, 2026;` ``(10) 2.1% deemed cumulative persisting annual savings` `for the year ending December 31, 2027;` ``(11) 1.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2028;` ``(12) 1.7% deemed cumulative persisting annual savings` `for the year ending December 31, 2029; and` ``(13) 1.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2030.` For purposes of this Section, "cumulative persisting` `annual savings" means the total electric energy savings in a` `given year from measures installed in that year or in previous` `years, but no earlier than January 1, 2012, that are still` `operational and providing savings in that year because the` `measures have not yet reached the end of their useful lives.` (b-5) Beginning in 2018, electric utilities subject to this` `Section that serve more than 3,000,000 retail customers in the` `State shall achieve the following cumulative persisting annual` `savings goals, as modified by subsection (f) of this Section` `and as compared to the deemed baseline of 88,000,000 MWhs of` `electric power and energy sales set forth in subsection (b), as` `reduced by the number of MWhs equal to the sum of the annual` `consumption of customers that are exempt from subsections (a)` `through (j) of this Section under subsection (l) of this` `Section as averaged across the calendar years 2014, 2015, and` `2016, through the implementation of energy efficiency measures` `during the applicable year and in prior years, but no earlier` `than January 1, 2012:` ``(1) 7.8% cumulative persisting annual savings for the` `year ending December 31, 2018;` ``(2) 9.1% cumulative persisting annual savings for the` `year ending December 31, 2019;` ``(3) 10.4% cumulative persisting annual savings for the` `year ending December 31, 2020;` ``(4) 11.8% cumulative persisting annual savings for the` `year ending December 31, 2021;` ``(5) 13.1% cumulative persisting annual savings for the` `year ending December 31, 2022;` ``(6) 14.4% cumulative persisting annual savings for the` `year ending December 31, 2023;` ``(7) 15.7% cumulative persisting annual savings for the` `year ending December 31, 2024;` ``(8) 17% cumulative persisting annual savings for the` `year ending December 31, 2025;` ``(9) 17.9% cumulative persisting annual savings for the` `year ending December 31, 2026;` ``(10) 18.8% cumulative persisting annual savings for` `the year ending December 31, 2027;` ``(11) 19.7% cumulative persisting annual savings for` `the year ending December 31, 2028;` ``(12) 20.6% cumulative persisting annual savings for` `the year ending December 31, 2029; and` ``(13) 21.5% cumulative persisting annual savings for` `the year ending December 31, 2030.` (b-10) For purposes of this Section, electric utilities` `subject to this Section that serve less than 3,000,000 retail` `customers but more than 500,000 retail customers in the State` `shall be deemed to have achieved a cumulative persisting annual` `savings of 6.6% from energy efficiency measures and programs` `implemented during the period beginning January 1, 2012 and` `ending December 31, 2017, which is based on the deemed average` `weather normalized sales of electric power and energy during` `calendar years 2014, 2015, and 2016 of 36,900,000 MWhs. For the` `purposes of this subsection (b-10) and subsection (b-15), the` `36,900,000 MWhs of deemed electric power and energy sales shall` `be reduced by the number of MWhs equal to the sum of the annual` `consumption of customers that are exempt from subsections (a)` `through (j) of this Section under subsection (l) of this` `Section, as averaged across the calendar years 2014, 2015, and` `2016. After 2017, the deemed value of cumulative persisting` `annual savings from energy efficiency measures and programs` `implemented during the period beginning January 1, 2012 and` `ending December 31, 2017, shall be reduced each year, as` `follows, and the applicable value shall be applied to and count` `toward the utility's achievement of the cumulative persisting` `annual savings goals set forth in subsection (b-15):` ``(1) 5.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2018;` ``(2) 5.2% deemed cumulative persisting annual savings` `for the year ending December 31, 2019;` ``(3) 4.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2020;` ``(4) 4.0% deemed cumulative persisting annual savings` `for the year ending December 31, 2021;` ``(5) 3.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2022;` ``(6) 3.1% deemed cumulative persisting annual savings` `for the year ending December 31, 2023;` ``(7) 2.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2024;` ``(8) 2.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2025;` ``(9) 2.3% deemed cumulative persisting annual savings` `for the year ending December 31, 2026;` ``(10) 2.1% deemed cumulative persisting annual savings` `for the year ending December 31, 2027;` ``(11) 1.8% deemed cumulative persisting annual savings` `for the year ending December 31, 2028;` ``(12) 1.7% deemed cumulative persisting annual savings` `for the year ending December 31, 2029; and` ``(13) 1.5% deemed cumulative persisting annual savings` `for the year ending December 31, 2030.` (b-15) Beginning in 2018, electric utilities subject to` `this Section that serve less than 3,000,000 retail customers` `but more than 500,000 retail customers in the State shall` `achieve the following cumulative persisting annual savings` `goals, as modified by subsection (b-20) and subsection (f) of` `this Section and as compared to the deemed baseline as reduced` `by the number of MWhs equal to the sum of the annual` `consumption of customers that are exempt from subsections (a)` `through (j) of this Section under subsection (l) of this` `Section as averaged across the calendar years 2014, 2015, and` `2016, through the implementation of energy efficiency measures` `during the applicable year and in prior years, but no earlier` `than January 1, 2012:` ``(1) 7.4% cumulative persisting annual savings for the` `year ending December 31, 2018;` ``(2) 8.2% cumulative persisting annual savings for the` `year ending December 31, 2019;` ``(3) 9.0% cumulative persisting annual savings for the` `year ending December 31, 2020;` ``(4) 9.8% cumulative persisting annual savings for the` `year ending December 31, 2021;` ``(5) 10.6% cumulative persisting annual savings for the` `year ending December 31, 2022;` ``(6) 11.4% cumulative persisting annual savings for the` `year ending December 31, 2023;` ``(7) 12.2% cumulative persisting annual savings for the` `year ending December 31, 2024;` ``(8) 13% cumulative persisting annual savings for the` `year ending December 31, 2025;` ``(9) 13.6% cumulative persisting annual savings for the` `year ending December 31, 2026;` ``(10) 14.2% cumulative persisting annual savings for` `the year ending December 31, 2027;` ``(11) 14.8% cumulative persisting annual savings for` `the year ending December 31, 2028;` ``(12) 15.4% cumulative persisting annual savings for` `the year ending December 31, 2029; and` ``(13) 16% cumulative persisting annual savings for the` `year ending December 31, 2030. The difference between the cumulative persisting annual` `savings goal for the applicable calendar year and the` `cumulative persisting annual savings goal for the immediately` `preceding calendar year is 0.8% for the period of January 1,` `2018 through December 31, 2025 and 0.6% for the period of` `January 1, 2026 through December 31, 2030. (b-20) Each electric utility subject to this Section may` `include cost-effective voltage optimization measures in its` `plans submitted under subsections (f) and (g) of this Section,` `and the costs incurred by a utility to implement the measures` `under a Commission-approved plan shall be recovered under the` `provisions of Article IX or Section 16-108.5 of this Act. For` `purposes of this Section, the measure life of voltage` `optimization measures shall be 15 years. The measure life` `period is independent of the depreciation rate of the voltage` `optimization assets deployed.` Within 270 days after the effective date of this amendatory` `Act of the 99th General Assembly, an electric utility that` `serves less than 3,000,000 retail customers but more than` `500,000 retail customers in the State shall file a plan with` `the Commission that identifies the cost-effective voltage` `optimization investment the electric utility plans to` `undertake through December 31, 2024. The Commission, after` `notice and hearing, shall approve or approve with modification` `the plan within 120 days after the plan's filing and, in the` `order approving or approving with modification the plan, the` `Commission shall adjust the applicable cumulative persisting` `annual savings goals set forth in subsection (b-15) to reflect` `any amount of cost-effective energy savings approved by the` `Commission that is greater than or less than the following` `cumulative persisting annual savings values attributable to` `voltage optimization for the applicable year:` ``(1) 0.0% of cumulative persisting annual savings for` `the year ending December 31, 2018;` ``(2) 0.17% of cumulative persisting annual savings for` `the year ending December 31, 2019;` ``(3) 0.17% of cumulative persisting annual savings for` `the year ending December 31, 2020;` ``(4) 0.33% of cumulative persisting annual savings for` `the year ending December 31, 2021;` ``(5) 0.5% of cumulative persisting annual savings for` `the year ending December 31, 2022;` ``(6) 0.67% of cumulative persisting annual savings for` `the year ending December 31, 2023;` ``(7) 0.83% of cumulative persisting annual savings for` `the year ending December 31, 2024; and` ``(8) 1.0% of cumulative persisting annual savings for` `the year ending December 31, 2025. (b-25) In the event an electric utility jointly offers an` `energy efficiency measure or program with a gas utility under` `plans approved under this Section and Section 8-104 of this` `Act, the electric utility may continue offering the program,` `including the gas energy efficiency measures, in the event the` `gas utility discontinues funding the program. In that event,` `the energy savings value associated with such other fuels shall` `be converted to electric energy savings on an equivalent Btu` `basis for the premises. However, the electric utility shall` `prioritize programs for low-income residential customers to` `the extent practicable. An electric utility may recover the` `costs of offering the gas energy efficiency measures under this` `subsection (b-25).` For those energy efficiency measures or programs that save` `both electricity and other fuels but are not jointly offered` `with a gas utility under plans approved under this Section and` `Section 8-104 or not offered with an affiliated gas utility` `under paragraph (6) of subsection (f) of Section 8-104 of this` `Act, the electric utility may count savings of fuels other than` `electricity toward the achievement of its annual savings goal,` `and the energy savings value associated with such other fuels` `shall be converted to electric energy savings on an equivalent` `Btu basis at the premises. In no event shall more than 10% of each year's applicable` `annual incremental goal as defined in paragraph (7) of` `subsection (g) of this Section be met through savings of fuels` `other than electricity. (c) Electric utilities shall be responsible for overseeing` `the design, development, and filing of energy efficiency plans` `with the Commission and may, as part of that implementation,` `outsource various aspects of program development and` `implementation. A minimum of 10%, for electric utilities that` `serve more than 3,000,000 retail customers in the State, and a` `minimum of 7%, for electric utilities that serve less than` `3,000,000 retail customers but more than 500,000 retail` `customers in the State, of the utility's entire portfolio` `funding level for a given year shall be used to procure` `cost-effective energy efficiency measures from units of local` `government, municipal corporations, school districts, public` `housing, and community college districts, provided that a` `minimum percentage of available funds shall be used to procure` `energy efficiency from public housing, which percentage shall` `be equal to public housing's share of public building energy` `consumption.` The utilities shall also implement energy efficiency` `measures targeted at low-income households, which, for` `purposes of this Section, shall be defined as households at or` `below 80% of area median income, and expenditures to implement` `the measures shall be no less than $25,000,000 per year for` `electric utilities that serve more than 3,000,000 retail` `customers in the State and no less than $8,350,000 per year for` `electric utilities that serve less than 3,000,000 retail` `customers but more than 500,000 retail customers in the State.` Each electric utility shall assess opportunities to` `implement cost-effective energy efficiency measures and` `programs through a public housing authority or authorities` `located in its service territory. If such opportunities are` `identified, the utility shall propose such measures and` `programs to address the opportunities. Expenditures to address` `such opportunities shall be credited toward the minimum` `procurement and expenditure requirements set forth in this` `subsection (c).` Implementation of energy efficiency measures and programs` `targeted at low-income households should be contracted, when it` `is practicable, to independent third parties that have` `demonstrated capabilities to serve such households, with a` `preference for not-for-profit entities and government agencies` `that have existing relationships with or experience serving` `low-income communities in the State.` Each electric utility shall develop and implement` `reporting procedures that address and assist in determining the` `amount of energy savings that can be applied to the low-income` `procurement and expenditure requirements set forth in this` `subsection (c).` The electric utilities shall also convene a low-income` `energy efficiency advisory committee to assist in the design` `and evaluation of the low-income energy efficiency programs.` `The committee shall be comprised of the electric utilities` `subject to the requirements of this Section, the gas utilities` `subject to the requirements of Section 8-104 of this Act, the` `utilities' low-income energy efficiency implementation` `contractors, and representatives of community-based` `organizations. (d) Notwithstanding any other provision of law to the` `contrary, a utility providing approved energy efficiency` `measures and, if applicable, demand-response measures in the` `State shall be permitted to recover all reasonable and` `prudently incurred costs of those measures from all retail` `customers, except as provided in subsection (l) of this` `Section, as follows, provided that nothing in this subsection` `(d) permits the double recovery of such costs from customers: ``(1) The utility may recover its costs through an` `automatic adjustment clause tariff filed with and approved` `by the Commission. The tariff shall be established outside` `the context of a general rate case. Each year the` `Commission shall initiate a review to reconcile any amounts` `collected with the actual costs and to determine the` `required adjustment to the annual tariff factor to match` `annual expenditures. To enable the financing of the` `incremental capital expenditures, including regulatory` `assets, for electric utilities that serve less than` `3,000,000 retail customers but more than 500,000 retail` `customers in the State, the utility's actual year-end` `capital structure that includes a common equity ratio,` `excluding goodwill, of up to and including 50% of the total` `capital structure shall be deemed reasonable and used to` `set rates.` ``(2) A utility may recover its costs through an energy` `efficiency formula rate approved by the Commission under a` `filing under subsections (f) and (g) of this Section, which` `shall specify the cost components that form the basis of` `the rate charged to customers with sufficient specificity` `to operate in a standardized manner and be updated annually` `with transparent information that reflects the utility's` `actual costs to be recovered during the applicable rate` `year, which is the period beginning with the first billing` `day of January and extending through the last billing day` `of the following December. The energy efficiency formula` `rate shall be implemented through a tariff filed with the` `Commission under subsections (f) and (g) of this Section` `that is consistent with the provisions of this paragraph` `(2) and that shall be applicable to all delivery services` `customers. The Commission shall conduct an investigation` `of the tariff in a manner consistent with the provisions of` `this paragraph (2), subsections (f) and (g) of this` `Section, and the provisions of Article IX of this Act to` `the extent they do not conflict with this paragraph (2).` `The energy efficiency formula rate approved by the` `Commission shall remain in effect at the discretion of the` `utility and shall do the following:` `(A) Provide for the recovery of the utility's` `actual costs incurred under this Section that are` `prudently incurred and reasonable in amount consistent` `with Commission practice and law. The sole fact that a` `cost differs from that incurred in a prior calendar` `year or that an investment is different from that made` `in a prior calendar year shall not imply the imprudence` `or unreasonableness of that cost or investment.` `(B) Reflect the utility's actual year-end capital` `structure for the applicable calendar year, excluding` `goodwill, subject to a determination of prudence and` `reasonableness consistent with Commission practice and` `law. To enable the financing of the incremental capital` `expenditures, including regulatory assets, for` `electric utilities that serve less than 3,000,000` `retail customers but more than 500,000 retail` `customers in the State, a participating electric` `utility's actual year-end capital structure that` `includes a common equity ratio, excluding goodwill, of` `up to and including 50% of the total capital structure` `shall be deemed reasonable and used to set rates.` `(C) Include a cost of equity, which shall be` `calculated as the sum of the following:` (i) the average for the applicable calendar` `year of the monthly average yields of 30-year U.S.` `Treasury bonds published by the Board of Governors` `of the Federal Reserve System in its weekly H.15` `Statistical Release or successor publication; and` (ii) 580 basis points.` `At such time as the Board of Governors of the` `Federal Reserve System ceases to include the monthly` `average yields of 30-year U.S. Treasury bonds in its` `weekly H.15 Statistical Release or successor` `publication, the monthly average yields of the U.S.` `Treasury bonds then having the longest duration` `published by the Board of Governors in its weekly H.15` `Statistical Release or successor publication shall` `instead be used for purposes of this paragraph (2).` `(D) Permit and set forth protocols, subject to a` `determination of prudence and reasonableness` `consistent with Commission practice and law, for the` `following:` (i) recovery of incentive compensation expense` `that is based on the achievement of operational` `metrics, including metrics related to budget` `controls, outage duration and frequency, safety,` `customer service, efficiency and productivity, and` `environmental compliance; however, this protocol` `shall not apply if such expense related to costs` `incurred under this Section is recovered under` `Article IX or Section 16-108.5 of this Act;` `incentive compensation expense that is based on` `net income or an affiliate's earnings per share` `shall not be recoverable under the energy` `efficiency formula rate;` (ii) recovery of pension and other` `post-employment benefits expense, provided that` `such costs are supported by an actuarial study;` `however, this protocol shall not apply if such` `expense related to costs incurred under this` `Section is recovered under Article IX or Section` `16-108.5 of this Act;` (iii) recovery of existing regulatory assets` `over the periods previously authorized by the` `Commission;` (iv) as described in subsection (e),` `amortization of costs incurred under this Section;` `and` (v) projected, weather normalized billing` `determinants for the applicable rate year.` `(E) Provide for an annual reconciliation, as` `described in paragraph (3) of this subsection (d), less` `any deferred taxes related to the reconciliation, with` `interest at an annual rate of return equal to the` `utility's weighted average cost of capital, including` `a revenue conversion factor calculated to recover or` `refund all additional income taxes that may be payable` `or receivable as a result of that return, of the energy` `efficiency revenue requirement reflected in rates for` `each calendar year, beginning with the calendar year in` `which the utility files its energy efficiency formula` `rate tariff under this paragraph (2), with what the` `revenue requirement would have been had the actual cost` `information for the applicable calendar year been` `available at the filing date.` ``The utility shall file, together with its tariff, the` `projected costs to be incurred by the utility during the` `rate year under the utility's multi-year plan approved` `under subsections (f) and (g) of this Section, including,` `but not limited to, the projected capital investment costs` `and projected regulatory asset balances with` `correspondingly updated depreciation and amortization` `reserves and expense, that shall populate the energy` `efficiency formula rate and set the initial rates under the` `formula.` ``The Commission shall review the proposed tariff in` `conjunction with its review of a proposed multi-year plan,` `as specified in paragraph (5) of subsection (g) of this` `Section. The review shall be based on the same evidentiary` `standards, including, but not limited to, those concerning` `the prudence and reasonableness of the costs incurred by` `the utility, the Commission applies in a hearing to review` `a filing for a general increase in rates under Article IX` `of this Act. The initial rates shall take effect beginning` `with the January monthly billing period following the` `Commission's approval.` ``The tariff's rate design and cost allocation across` `customer classes shall be consistent with the utility's` `automatic adjustment clause tariff in effect on the` `effective date of this amendatory Act of the 99th General` `Assembly; however, the Commission may revise the tariff's` `rate design and cost allocation in subsequent proceedings` `under paragraph (3) of this subsection (d).` ``If the energy efficiency formula rate is terminated,` `the then current rates shall remain in effect until such` `time as the energy efficiency costs are incorporated into` `new rates that are set under this subsection (d) or Article` `IX of this Act, subject to retroactive rate adjustment,` `with interest, to reconcile rates charged with actual` `costs.` ``(3) The provisions of this paragraph (3) shall only` `apply to an electric utility that has elected to file an` `energy efficiency formula rate under paragraph (2) of this` `subsection (d). Subsequent to the Commission's issuance of` `an order approving the utility's energy efficiency formula` `rate structure and protocols, and initial rates under` `paragraph (2) of this subsection (d), the utility shall` `file, on or before June 1 of each year, with the Chief` `Clerk of the Commission its updated cost inputs to the` `energy efficiency formula rate for the applicable rate year` `and the corresponding new charges, as well as the` `information described in paragraph (9) of subsection (g) of` `this Section. Each such filing shall conform to the` `following requirements and include the following` `information:` `(A) The inputs to the energy efficiency formula` `rate for the applicable rate year shall be based on the` `projected costs to be incurred by the utility during` `the rate year under the utility's multi-year plan` `approved under subsections (f) and (g) of this Section,` `including, but not limited to, projected capital` `investment costs and projected regulatory asset` `balances with correspondingly updated depreciation and` `amortization reserves and expense. The filing shall` `also include a reconciliation of the energy efficiency` `revenue requirement that was in effect for the prior` `rate year (as set by the cost inputs for the prior rate` `year) with the actual revenue requirement for the prior` `rate year (determined using a year-end rate base) that` `uses amounts reflected in the applicable FERC Form 1` `that reports the actual costs for the prior rate year.` `Any over-collection or under-collection indicated by` `such reconciliation shall be reflected as a credit` `against, or recovered as an additional charge to,` `respectively, with interest calculated at a rate equal` `to the utility's weighted average cost of capital` `approved by the Commission for the prior rate year, the` `charges for the applicable rate year. Such` `over-collection or under-collection shall be adjusted` `to remove any deferred taxes related to the` `reconciliation, for purposes of calculating interest` `at an annual rate of return equal to the utility's` `weighted average cost of capital approved by the` `Commission for the prior rate year, including a revenue` `conversion factor calculated to recover or refund all` `additional income taxes that may be payable or` `receivable as a result of that return. Each` `reconciliation shall be certified by the participating` `utility in the same manner that FERC Form 1 is` `certified. The filing shall also include the charge or` `credit, if any, resulting from the calculation` `required by subparagraph (E) of paragraph (2) of this` `subsection (d).` `Notwithstanding any other provision of law to the` `contrary, the intent of the reconciliation is to` `ultimately reconcile both the revenue requirement` `reflected in rates for each calendar year, beginning` `with the calendar year in which the utility files its` `energy efficiency formula rate tariff under paragraph` `(2) of this subsection (d), with what the revenue` `requirement determined using a year-end rate base for` `the applicable calendar year would have been had the` `actual cost information for the applicable calendar` `year been available at the filing date.` `For purposes of this Section, "FERC Form 1" means` `the Annual Report of Major Electric Utilities,` `Licensees and Others that electric utilities are` `required to file with the Federal Energy Regulatory` `Commission under the Federal Power Act, Sections 3,` `4(a), 304 and 209, modified as necessary to be` `consistent with 83 Ill. Admin. Code Part 415 as of May` `1, 2011. Nothing in this Section is intended to allow` `costs that are not otherwise recoverable to be` `recoverable by virtue of inclusion in FERC Form 1.` `(B) The new charges shall take effect beginning on` `the first billing day of the following January billing` `period and remain in effect through the last billing` `day of the next December billing period regardless of` `whether the Commission enters upon a hearing under this` `paragraph (3).` `(C) The filing shall include relevant and` `necessary data and documentation for the applicable` `rate year. Normalization adjustments shall not be` `required.` ``Within 45 days after the utility files its annual` `update of cost inputs to the energy efficiency formula` `rate, the Commission shall with reasonable notice,` `initiate a proceeding concerning whether the projected` `costs to be incurred by the utility and recovered during` `the applicable rate year, and that are reflected in the` `inputs to the energy efficiency formula rate, are` `consistent with the utility's approved multi-year plan` `under subsections (f) and (g) of this Section and whether` `the costs incurred by the utility during the prior rate` `year were prudent and reasonable. The Commission shall also` `have the authority to investigate the information and data` `described in paragraph (9) of subsection (g) of this` `Section, including the proposed adjustment to the` `utility's return on equity component of its weighted` `average cost of capital. During the course of the` `proceeding, each objection shall be stated with` `particularity and evidence provided in support thereof,` `after which the utility shall have the opportunity to rebut` `the evidence. Discovery shall be allowed consistent with` `the Commission's Rules of Practice, which Rules of Practice` `shall be enforced by the Commission or the assigned hearing` `examiner. The Commission shall apply the same evidentiary` `standards, including, but not limited to, those concerning` `the prudence and reasonableness of the costs incurred by` `the utility, during the proceeding as it would apply in a` `proceeding to review a filing for a general increase in` `rates under Article IX of this Act. The Commission shall` `not, however, have the authority in a proceeding under this` `paragraph (3) to consider or order any changes to the` `structure or protocols of the energy efficiency formula` `rate approved under paragraph (2) of this subsection (d).` `In a proceeding under this paragraph (3), the Commission` `shall enter its order no later than the earlier of 195 days` `after the utility's filing of its annual update of cost` `inputs to the energy efficiency formula rate or December` `15. The utility's proposed return on equity calculation, as` `described in paragraphs (7) through (9) of subsection (g)` `of this Section, shall be deemed the final, approved` `calculation on December 15 of the year in which it is filed` `unless the Commission enters an order on or before December` `15, after notice and hearing, that modifies such` `calculation consistent with this Section. The Commission's` `determinations of the prudence and reasonableness of the` `costs incurred, and determination of such return on equity` `calculation, for the applicable calendar year shall be` `final upon entry of the Commission's order and shall not be` `subject to reopening, reexamination, or collateral attack` `in any other Commission proceeding, case, docket, order,` `rule, or regulation; however, nothing in this paragraph (3)` `shall prohibit a party from petitioning the Commission to` `rehear or appeal to the courts the order under the` `provisions of this Act.` (e) Beginning on the effective date of this amendatory Act` `of the 99th General Assembly, a utility subject to the` `requirements of this Section may elect to defer, as a` `regulatory asset, up to the full amount of its expenditures` `incurred under this Section for each annual period, including,` `but not limited to, any expenditures incurred above the funding` `level set by subsection (f) of this Section for a given year.` `The total expenditures deferred as a regulatory asset in a` `given year shall be amortized and recovered over a period that` `is equal to the weighted average of the energy efficiency` `measure lives implemented for that year that are reflected in` `the regulatory asset. The unamortized balance shall be` `recognized as of December 31 for a given year. The utility` `shall also earn a return on the total of the unamortized` `balances of all of the energy efficiency regulatory assets,` `less any deferred taxes related to those unamortized balances,` `at an annual rate equal to the utility's weighted average cost` `of capital that includes, based on a year-end capital` `structure, the utility's actual cost of debt for the applicable` `calendar year and a cost of equity, which shall be calculated` `as the sum of the (i) the average for the applicable calendar` `year of the monthly average yields of 30-year U.S. Treasury` `bonds published by the Board of Governors of the Federal` `Reserve System in its weekly H.15 Statistical Release or` `successor publication; and (ii) 580 basis points, including a` `revenue conversion factor calculated to recover or refund all` `additional income taxes that may be payable or receivable as a` `result of that return. Capital investment costs shall be` `depreciated and recovered over their useful lives consistent` `with generally accepted accounting principles. The weighted` `average cost of capital shall be applied to the capital` `investment cost balance, less any accumulated depreciation and` `accumulated deferred income taxes, as of December 31 for a` `given year.` When an electric utility creates a regulatory asset under` `the provisions of this Section, the costs are recovered over a` `period during which customers also receive a benefit which is` `in the public interest. Accordingly, it is the intent of the` `General Assembly that an electric utility that elects to create` `a regulatory asset under the provisions of this Section shall` `recover all of the associated costs as set forth in this` `Section. After the Commission has approved the prudence and` `reasonableness of the costs that comprise the regulatory asset,` `the electric utility shall be permitted to recover all such` `costs, and the value and recoverability through rates of the` `associated regulatory asset shall not be limited, altered,` `impaired, or reduced.` (f) Beginning in 2017, each electric utility shall file an` `energy efficiency plan with the Commission to meet the energy` `efficiency standards for the next applicable multi-year period` `beginning January 1 of the year following the filing, according` `to the schedule set forth in paragraphs (1) through (3) of this` `subsection (f). If a utility does not file such a plan on or` `before the applicable filing deadline for the plan, it shall` `face a penalty of $100,000 per day until the plan is filed.` ``(1) No later than 30 days after the effective date of` `this amendatory Act of the 99th General Assembly or May 1,` `2017, whichever is later, each electric utility shall file` `a 4-year energy efficiency plan commencing on January 1,` `2018 that is designed to achieve the cumulative persisting` `annual savings goals specified in paragraphs (1) through` `(4) of subsection (b-5) of this Section or in paragraphs` `(1) through (4) of subsection (b-15) of this Section, as` `applicable, through implementation of energy efficiency` `measures; however, the goals may be reduced if the` `utility's expenditures are limited pursuant to subsection` `(m) of this Section or, for a utility that serves less than` `3,000,000 retail customers, if each of the following` `conditions are met: (A) the plan's analysis and forecasts` `of the utility's ability to acquire energy savings` `demonstrate that achievement of such goals is not cost` `effective; and (B) the amount of energy savings achieved by` `the utility as determined by the independent evaluator for` `the most recent year for which savings have been evaluated` `preceding the plan filing was less than the average annual` `amount of savings required to achieve the goals for the` `applicable 4-year plan period. Except as provided in` `subsection (m) of this Section, annual increases in` `cumulative persisting annual savings goals during the` `applicable 4-year plan period shall not be reduced to` `amounts that are less than the maximum amount of cumulative` `persisting annual savings that is forecast to be` `cost-effectively achievable during the 4-year plan period.` `The Commission shall review any proposed goal reduction as` `part of its review and approval of the utility's proposed` `plan.` ``(2) No later than March 1, 2021, each electric utility` `shall file a 4-year energy efficiency plan commencing on` `January 1, 2022 that is designed to achieve the cumulative` `persisting annual savings goals specified in paragraphs` `(5) through (8) of subsection (b-5) of this Section or in` `paragraphs (5) through (8) of subsection (b-15) of this` `Section, as applicable, through implementation of energy` `efficiency measures; however, the goals may be reduced if` `the utility's expenditures are limited pursuant to` `subsection (m) of this Section or, each of the following` `conditions are met: (A) the plan's analysis and forecasts` `of the utility's ability to acquire energy savings` `demonstrate that achievement of such goals is not cost` `effective; and (B) the amount of energy savings achieved by` `the utility as determined by the independent evaluator for` `the most recent year for which savings have been evaluated` `preceding the plan filing was less than the average annual` `amount of savings required to achieve the goals for the` `applicable 4-year plan period. Except as provided in` `subsection (m) of this Section, annual increases in` `cumulative persisting annual savings goals during the` `applicable 4-year plan period shall not be reduced to` `amounts that are less than the maximum amount of cumulative` `persisting annual savings that is forecast to be` `cost-effectively achievable during the 4-year plan period.` `The Commission shall review any proposed goal reduction as` `part of its review and approval of the utility's proposed` `plan.` ``(3) No later than March 1, 2025, each electric utility` `shall file a 5-year energy efficiency plan commencing on` `January 1, 2026 that is designed to achieve the cumulative` `persisting annual savings goals specified in paragraphs` `(9) through (13) of subsection (b-5) of this Section or in` `paragraphs (9) through (13) of subsection (b-15) of this` `Section, as applicable, through implementation of energy` `efficiency measures; however, the goals may be reduced if` `the utility's expenditures are limited pursuant to` `subsection (m) of this Section or, each of the following` `conditions are met: (A) the plan's analysis and forecasts` `of the utility's ability to acquire energy savings` `demonstrate that achievement of such goals is not cost` `effective; and (B) the amount of energy savings achieved by` `the utility as determined by the independent evaluator for` `the most recent year for which savings have been evaluated` `preceding the plan filing was less than the average annual` `amount of savings required to achieve the goals for the` `applicable 5-year plan period. Except as provided in` `subsection (m) of this Section, annual increases in` `cumulative persisting annual savings goals during the` `applicable 5-year plan period shall not be reduced to` `amounts that are less than the maximum amount of cumulative` `persisting annual savings that is forecast to be` `cost-effectively achievable during the 5-year plan period.` `The Commission shall review any proposed goal reduction as` `part of its review and approval of the utility's proposed` `plan. Each utility's plan shall set forth the utility's proposals` `to meet the energy efficiency standards identified in` `subsection (b-5) or (b-15), as applicable and as such standards` `may have been modified under this subsection (f), taking into` `account the unique circumstances of the utility's service` `territory. For those plans commencing on January 1, 2018, the` `Commission shall seek public comment on the utility's plan and` `shall issue an order approving or disapproving each plan no` `later than August 31, 2017, or 105 days after the effective` `date of this amendatory Act of the 99th General Assembly,` `whichever is later. For those plans commencing after December` `31, 2021, the Commission shall seek public comment on the` `utility's plan and shall issue an order approving or` `disapproving each plan within 6 months after its submission. If` `the Commission disapproves a plan, the Commission shall, within` `30 days, describe in detail the reasons for the disapproval and` `describe a path by which the utility may file a revised draft` `of the plan to address the Commission's concerns` `satisfactorily. If the utility does not refile with the` `Commission within 60 days, the utility shall be subject to` `penalties at a rate of $100,000 per day until the plan is` `filed. This process shall continue, and penalties shall accrue,` `until the utility has successfully filed a portfolio of energy` `efficiency and demand-response measures. Penalties shall be` `deposited into the Energy Efficiency Trust Fund. (g) In submitting proposed plans and funding levels under` `subsection (f) of this Section to meet the savings goals` `identified in subsection (b-5) or (b-15) of this Section, as` `applicable, the utility shall:` ``(1) Demonstrate that its proposed energy efficiency` `measures will achieve the applicable requirements that are` `identified in subsection (b-5) or (b-15) of this Section,` `as modified by subsection (f) of this Section.` ``(2) Present specific proposals to implement new` `building and appliance standards that have been placed into` `effect.` ``(3) Demonstrate that its overall portfolio of` `measures, not including low-income programs described in` `subsection (c) of this Section, is cost-effective using the` `total resource cost test or complies with paragraphs (1)` `through (3) of subsection (f) of this Section and` `represents a diverse cross-section of opportunities for` `customers of all rate classes, other than those customers` `described in subsection (l) of this Section, to participate` `in the programs. Individual measures need not be cost` `effective.` ``(4) Present a third-party energy efficiency` `implementation program subject to the following` `requirements:` `(A) beginning with the year commencing January 1,` `2019, electric utilities that serve more than` `3,000,000 retail customers in the State shall fund` `third-party energy efficiency programs in an amount` `that is no less than $25,000,000 per year, and electric` `utilities that serve less than 3,000,000 retail` `customers but more than 500,000 retail customers in the` `State shall fund third-party energy efficiency` `programs in an amount that is no less than $8,350,000` `per year;` `(B) during 2018, the utility shall conduct a` `solicitation process for purposes of requesting` `proposals from third-party vendors for those` `third-party energy efficiency programs to be offered` `during one or more of the years commencing January 1,` `2019, January 1, 2020, and January 1, 2021; for those` `multi-year plans commencing on January 1, 2022 and` `January 1, 2026, the utility shall conduct a` `solicitation process during 2021 and 2025,` `respectively, for purposes of requesting proposals` `from third-party vendors for those third-party energy` `efficiency programs to be offered during one or more` `years of the respective multi-year plan period; for` `each solicitation process, the utility shall identify` `the sector, technology, or geographical area for which` `it is seeking requests for proposals;` `(C) the utility shall propose the bidder` `qualifications, performance measurement process, and` `contract structure, which must include a performance` `payment mechanism and general terms and conditions;` `the proposed qualifications, process, and structure` `shall be subject to Commission approval; and` `(D) the utility shall retain an independent third` `party to score the proposals received through the` `solicitation process described in this paragraph (4),` `rank them according to their cost per lifetime` `kilowatt-hours saved, and assemble the portfolio of` `third-party programs.` ``The electric utility shall recover all costs` `associated with Commission-approved, third-party` `administered programs regardless of the success of those` `programs. ``(4.5)Implement cost-effective demand-response measures` `to reduce peak demand by 0.1% over the prior year for` `eligible retail customers, as defined in Section 16-111.5` `of this Act, and for customers that elect hourly service` `from the utility pursuant to Section 16-107 of this Act,` `provided those customers have not been declared` `competitive. This requirement continues until December 31,` `2026. ``(5) Include a proposed or revised cost-recovery tariff` `mechanism, as provided for under subsection (d) of this` `Section, to fund the proposed energy efficiency and` `demand-response measures and to ensure the recovery of the` `prudently and reasonably incurred costs of` `Commission-approved programs.` ``(6) Provide for an annual independent evaluation of the` `performance of the cost-effectiveness of the utility's` `portfolio of measures, as well as a full review of the` `multi-year plan results of the broader net program impacts` `and, to the extent practical, for adjustment of the` `measures on a going-forward basis as a result of the` `evaluations. The resources dedicated to evaluation shall` `not exceed 3% of portfolio resources in any given year.` ``(7) For electric utilities that serve more than` `3,000,000 retail customers in the State:` `(A) Through December 31, 2025, provide for an` `adjustment to the return on equity component of the` `utility's weighted average cost of capital calculated` `under subsection (d) of this Section:` (i) If the independent evaluator determines` `that the utility achieved a cumulative persisting` `annual savings that is less than the applicable` `annual incremental goal, then the return on equity` `component shall be reduced by a maximum of 200` `basis points in the event that the utility achieved` `no more than 75% of such goal. If the utility` `achieved more than 75% of the applicable annual` `incremental goal but less than 100% of such goal,` `then the return on equity component shall be` `reduced by 8 basis points for each percent by which` `the utility failed to achieve the goal.` (ii) If the independent evaluator determines` `that the utility achieved a cumulative persisting` `annual savings that is more than the applicable` `annual incremental goal, then the return on equity` `component shall be increased by a maximum of 200` `basis points in the event that the utility achieved` `at least 125% of such goal. If the utility achieved` `more than 100% of the applicable annual` `incremental goal but less than 125% of such goal,` `then the return on equity component shall be` `increased by 8 basis points for each percent by` `which the utility achieved above the goal. If the` `applicable annual incremental goal was reduced` `under paragraphs (1) or (2) of subsection (f) of` `this Section, then the following adjustments shall` `be made to the calculations described in this item` `(ii):` ``(aa) the calculation for determining` `achievement that is at least 125% of the` `applicable annual incremental goal shall use` `the unreduced applicable annual incremental` `goal to set the value; and` ``(bb) the calculation for determining` `achievement that is less than 125% but more` `than 100% of the applicable annual incremental` `goal shall use the reduced applicable annual` `incremental goal to set the value for 100%` `achievement of the goal and shall use the` `unreduced goal to set the value for 125%` `achievement. The 8 basis point value shall also` `be modified, as necessary, so that the 200` `basis points are evenly apportioned among each` `percentage point value between 100% and 125%` `achievement.` `(B) For the period January 1, 2026 through December` `31, 2030, provide for an adjustment to the return on` `equity component of the utility's weighted average` `cost of capital calculated under subsection (d) of this` `Section:` (i) If the independent evaluator determines` `that the utility achieved a cumulative persisting` `annual savings that is less than the applicable` `annual incremental goal, then the return on equity` `component shall be reduced by a maximum of 200` `basis points in the event that the utility achieved` `no more than 66% of such goal. If the utility` `achieved more than 66% of the applicable annual` `incremental goal but less than 100% of such goal,` `then the return on equity component shall be` `reduced by 6 basis points for each percent by which` `the utility failed to achieve the goal.` (ii) If the independent evaluator determines` `that the utility achieved a cumulative persisting` `annual savings that is more than the applicable` `annual incremental goal, then the return on equity` `component shall be increased by a maximum of 200` `basis points in the event that the utility achieved` `at least 134% of such goal. If the utility achieved` `more than 100% of the applicable annual` `incremental goal but less than 134% of such goal,` `then the return on equity component shall be` `increased by 6 basis points for each percent by` `which the utility achieved above the goal. If the` `applicable annual incremental goal was reduced` `under paragraph (3) of subsection (f) of this` `Section, then the following adjustments shall be` `made to the calculations described in this item` `(ii):` ``(aa) the calculation for determining` `achievement that is at least 134% of the` `applicable annual incremental goal shall use` `the unreduced applicable annual incremental` `goal to set the value; and` ``(bb) the calculation for determining` `achievement that is less than 134% but more` `than 100% of the applicable annual incremental` `goal shall use the reduced applicable annual` `incremental goal to set the value for 100%` `achievement of the goal and shall use the` `unreduced goal to set the value for 134%` `achievement. The 6 basis point value shall also` `be modified, as necessary, so that the 200` `basis points are evenly apportioned among each` `percentage point value between 100% and 134%` `achievement. ``(7.5) For purposes of this Section, the term` `"applicable annual incremental goal" means the difference` `between the cumulative persisting annual savings goal for` `the calendar year that is the subject of the independent` `evaluator's determination and the cumulative persisting` `annual savings goal for the immediately preceding calendar` `year, as such goals are defined in subsections (b-5) and` `(b-15) of this Section and as these goals may have been` `modified as provided for under subsection (b-20) and` `paragraphs (1) through (3) of subsection (f) of this` `Section. Under subsections (b), (b-5), (b-10), and (b-15)` `of this Section, a utility must first replace energy` `savings from measures that have reached the end of their` `measure lives and would otherwise have to be replaced to` `meet the applicable savings goals identified in subsection` `(b-5) or (b-15) of this Section before any progress towards` `achievement of its applicable annual incremental goal may` `be counted. Notwithstanding anything else set forth in this` `Section, the difference between the actual annual` `incremental savings achieved in any given year, including` `the replacement of energy savings from measures that have` `expired, and the applicable annual incremental goal shall` `not affect adjustments to the return on equity for` `subsequent calendar years under this subsection (g). ``(8) For electric utilities that serve less than` `3,000,000 retail customers but more than 500,000 retail` `customers in the State:` `(A) Through December 31, 2025, the applicable` `annual incremental goal shall be compared to the annual` `incremental savings as determined by the independent` `evaluator.` (i) The return on equity component shall be` `reduced by 8 basis points for each percent by which` `the utility did not achieve 84.4% of the applicable` `annual incremental goal.` (ii) The return on equity component shall be` `increased by 8 basis points for each percent by` `which the utility exceeded 100% of the applicable` `annual incremental goal.` (iii) The return on equity component shall not` `be increased or decreased if the annual` `incremental savings as determined by the` `independent evaluator is greater than 84.4% of the` `applicable annual incremental goal and less than` `100% of the applicable annual incremental goal.` (iv) The return on equity component shall not` `be increased or decreased by an amount greater than` `200 basis points pursuant to this subparagraph` `(A).` `(B) For the period of January 1, 2026 through` `December 31, 2030, the applicable annual incremental` `goal shall be compared to the annual incremental` `savings as determined by the independent evaluator.` (i) The return on equity component shall be` `reduced by 6 basis points for each percent by which` `the utility did not achieve 100% of the applicable` `annual incremental goal.` (ii) The return on equity component shall be` `increased by 6 basis points for each percent by` `which the utility exceeded 100% of the applicable` `annual incremental goal.` (iii) The return on equity component shall not` `be increased or decreased by an amount greater than` `200 basis points pursuant to this subparagraph` `(B).` `(C) If the applicable annual incremental goal was` `reduced under paragraphs (1), (2) or (3) of subsection` `(f) of this Section, then the following adjustments` `shall be made to the calculations described in` `subparagraphs (A) and (B) of this paragraph (8):` (i) The calculation for determining` `achievement that is at least 125% or 134%, as` `applicable, of the applicable annual incremental` `goal shall use the unreduced applicable annual` `incremental goal to set the value.` (ii) For the period through December 31, 2025,` `the calculation for determining achievement that` `is less than 125% but more than 100% of the` `applicable annual incremental goal shall use the` `reduced applicable annual incremental goal to set` `the value for 100% achievement of the goal and` `shall use the unreduced goal to set the value for` `125% achievement. The 8 basis point value shall` `also be modified, as necessary, so that the 200` `basis points are evenly apportioned among each` `percentage point value between 100% and 125%` `achievement.` (iii) For the period of January 1, 2026 through` `December 31, 2030, the calculation for determining` `achievement that is less than 134% but more than` `100% of the applicable annual incremental goal` `shall use the reduced applicable annual` `incremental goal to set the value for 100%` `achievement of the goal and shall use the unreduced` `goal to set the value for 125% achievement. The 6` `basis point value shall also be modified, as` `necessary, so that the 200 basis points are evenly` `apportioned among each percentage point value` `between 100% and 134% achievement.` ``(9) The utility shall submit the energy savings data to` `the independent evaluator no later than 30 days after the` `close of the plan year. The independent evaluator shall` `determine the cumulative persisting annual savings for a` `given plan year no later than 120 days after the close of` `the plan year. The utility shall submit an informational` `filing to the Commission no later than 160 days after the` `close of the plan year that attaches the independent` `evaluator's final report identifying the cumulative` `persisting annual savings for the year and calculates,` `under paragraph (7) or (8) of this subsection (g), as` `applicable, any resulting change to the utility's return on` `equity component of the weighted average cost of capital` `applicable to the next plan year beginning with the January` `monthly billing period and extending through the December` `monthly billing period. However, if the utility recovers` `the costs incurred under this Section under paragraphs (2)` `and (3) of subsection (d) of this Section, then the utility` `shall not be required to submit such informational filing,` `and shall instead submit the information that would` `otherwise be included in the informational filing as part` `of its filing under paragraph (3) of such subsection (d)` `that is due on or before June 1 of each year.` ``For those utilities that must submit the informational` `filing, the Commission may, on its own motion or by` `petition, initiate an investigation of such filing,` `provided, however, that the utility's proposed return on` `equity calculation shall be deemed the final, approved` `calculation on December 15 of the year in which it is filed` `unless the Commission enters an order on or before December` `15, after notice and hearing, that modifies such` `calculation consistent with this Section.` ``The adjustments to the return on equity component` `described in paragraphs (7) and (8) of this subsection (g)` `shall be applied as described in such paragraphs through a` `separate tariff mechanism, which shall be filed by the` `utility under subsections (f) and (g) of this Section. (h) No more than 6% of energy efficiency and` `demand-response program revenue may be allocated for research,` `development, or pilot deployment of new equipment or measures. (i) When practicable, electric utilities shall incorporate` `advanced metering infrastructure data into the planning,` `implementation, and evaluation of energy efficiency measures` `and programs, subject to the data privacy and confidentiality` `protections of applicable law.` (j) The independent evaluator shall follow the guidelines` `and use the savings set forth in Commission-approved energy` `efficiency policy manuals and technical reference manuals, as` `each may be updated from time to time. Until such time as` `measure life values for energy efficiency measures implemented` `for low-income households under subsection (c) of this Section` `are incorporated into such Commission-approved manuals, the` `low-income measures shall have the same measure life values` `that are established for same measures implemented in` `households that are not low-income households.` (k) Notwithstanding any provision of law to the contrary,` `an electric utility subject to the requirements of this Section` `may file a tariff cancelling an automatic adjustment clause` `tariff in effect under this Section or Section 8-103, which` `shall take effect no later than one business day after the date` `such tariff is filed. Thereafter, the utility shall be` `authorized to defer and recover its expenditures incurred under` `this Section through a new tariff authorized under subsection` `(d) of this Section or in the utility's next rate case under` `Article IX or Section 16-108.5 of this Act, with interest at an` `annual rate equal to the utility's weighted average cost of` `capital as approved by the Commission in such case. If the` `utility elects to file a new tariff under subsection (d) of` `this Section, the utility may file the tariff within 10 days` `after the effective date of this amendatory Act of the 99th` `General Assembly, and the cost inputs to such tariff shall be` `based on the projected costs to be incurred by the utility` `during the calendar year in which the new tariff is filed and` `that were not recovered under the tariff that was cancelled as` `provided for in this subsection. Such costs shall include those` `incurred or to be incurred by the utility under its multi-year` `plan approved under subsections (f) and (g) of this Section,` `including, but not limited to, projected capital investment` `costs and projected regulatory asset balances with` `correspondingly updated depreciation and amortization reserves` `and expense. The Commission shall, after notice and hearing,` `approve, or approve with modification, such tariff and cost` `inputs no later than 75 days after the utility filed the` `tariff, provided that such approval, or approval with` `modification, shall be consistent with the provisions of this` `Section to the extent they do not conflict with this subsection` `(k). The tariff approved by the Commission shall take effect no` `later than 5 days after the Commission enters its order` `approving the tariff.` No later than 60 days after the effective date of the` `tariff cancelling the utility's automatic adjustment clause` `tariff, the utility shall file a reconciliation that reconciles` `the moneys collected under its automatic adjustment clause` `tariff with the costs incurred during the period beginning June` `1, 2016 and ending on the date that the electric utility's` `automatic adjustment clause tariff was cancelled. In the event` `the reconciliation reflects an under-collection, the utility` `shall recover the costs as specified in this subsection (k). If` `the reconciliation reflects an over-collection, the utility` `shall apply the amount of such over-collection as a one-time` `credit to retail customers' bills.` (l) For the calendar years covered by a multi-year plan` `commencing after December 31, 2017, subsections (a) through (j)` `of this Section do not apply to any retail customers of an` `electric utility that serves more than 3,000,000 retail` `customers in the State and whose total highest 30 minute demand` `was more than 10,000 kilowatts, or any retail customers of an` `electric utility that serves less than 3,000,000 retail` `customers but more than 500,000 retail customers in the State` `and whose total highest 15 minute demand was more than 10,000` `kilowatts. For purposes of this subsection (l), "retail` `customer" has the meaning set forth in Section 16-102 of this` `Act. A determination of whether this subsection is applicable` `to a customer shall be made for each multi-year plan beginning` `after December 31, 2017. The criteria for determining whether` `this subsection (l) is applicable to a retail customer shall be` `based on the 12 consecutive billing periods prior to the start` `of the first year of each such multi-year plan. (m) Notwithstanding the requirements of this Section, as` `part of a proceeding to approve a multi-year plan under` `subsections (f) and (g) of this Section, the Commission shall` `reduce the amount of energy efficiency measures implemented for` `any single year, and whose costs are recovered under subsection` `(d) of this Section, by an amount necessary to limit the` `estimated average net increase due to the cost of the measures` `to no more than` ``(1) 3.5% for the each of the 4 years beginning January` `1, 2018,` ``(2) 3.75% for each of the 4 years beginning January 1,` `2022, and` ``(3) 4% for each of the 5 years beginning January 1,` `2026,` `of the average amount paid per kilowatthour by residential` `eligible retail customers during calendar year 2015. To` `determine the total amount that may be spent by an electric` `utility in any single year, the applicable percentage of the` `average amount paid per kilowatthour shall be multiplied by the` `total amount of energy delivered by such electric utility in` `the calendar year 2015, adjusted to reflect the proportion of` `the utility's load attributable to customers who are exempt` `from subsections (a) through (j) of this Section under` `subsection (l) of this Section. For purposes of this subsection` `(m), the amount paid per kilowatthour includes, without` `limitation, estimated amounts paid for supply, transmission,` `distribution, surcharges, and add-on taxes. For purposes of` `this Section, "eligible retail customers" shall have the` `meaning set forth in Section 16-111.5 of this Act. Once the` `Commission has approved a plan under subsections (f) and (g) of` `this Section, no subsequent rate impact determinations shall be` `made.` (220 ILCS 5/8-104) Sec. 8-104.``Natural gas energy efficiency programs.` (a) It is the policy of the State that natural gas` `utilities and the Department of Commerce and Economic` `Opportunity are required to use cost-effective energy` `efficiency to reduce direct and indirect costs to consumers. It` `serves the public interest to allow natural gas utilities to` `recover costs for reasonably and prudently incurred expenses` `for cost-effective energy efficiency measures.` (b) For purposes of this Section, "energy efficiency" means` `measures that reduce the amount of energy required to achieve a` `given end use. "Energy efficiency" also includes measures that` `reduce the total Btus of electricity and natural gas needed to` `meet the end use or uses. "Cost-effective" means that the` `measures satisfy the total resource cost test which, for` `purposes of this Section, means a standard that is met if, for` `an investment in energy efficiency, the benefit-cost ratio is` `greater than one. The benefit-cost ratio is the ratio of the` `net present value of the total benefits of the measures to the` `net present value of the total costs as calculated over the` `lifetime of the measures. The total resource cost test compares` `the sum of avoided natural gas utility costs, representing the` `benefits that accrue to the system and the participant in the` `delivery of those efficiency measures, as well as other` `quantifiable societal benefits, including avoided electric` `utility costs, to the sum of all incremental costs of end use` `measures (including both utility and participant` `contributions), plus costs to administer, deliver, and` `evaluate each demand-side measure, to quantify the net savings` `obtained by substituting demand-side measures for supply` `resources. In calculating avoided costs, reasonable estimates` `shall be included for financial costs likely to be imposed by` `future regulation of emissions of greenhouse gases. The` `low-income programs described in item (4) of subsection (f) of` `this Section shall not be required to meet the total resource` `cost test.` (c) Natural gas utilities shall implement cost-effective` `energy efficiency measures to meet at least the following` `natural gas savings requirements, which shall be based upon the` `total amount of gas delivered to retail customers, other than` `the customers described in subsection (m) of this Section,` `during calendar year 2009 multiplied by the applicable` `percentage. Natural gas utilities may comply with this Section` `by meeting the annual incremental savings goal in the` `applicable year or by showing that total cumulative annual` `savings within a``multi-year `3-year``planning period associated` `with measures implemented after May 31, 2011 were equal to the` `sum of each annual incremental savings requirement from``the` `first day of the multi-year planning period `May 31, 2011 `through the``last day of the multi-year planning period `end of` `the applicable year``:` ``(1) 0.2% by May 31, 2012;` ``(2) an additional 0.4% by May 31, 2013, increasing` `total savings to .6%;` ``(3) an additional 0.6% by May 31, 2014, increasing` `total savings to 1.2%;` ``(4) an additional 0.8% by May 31, 2015, increasing` `total savings to 2.0%;` ``(5) an additional 1% by May 31, 2016, increasing total` `savings to 3.0%;` ``(6) an additional 1.2% by May 31, 2017, increasing` `total savings to 4.2%;` ``(7) an additional 1.4%``in the year commencing January` `1, 2018 `by May 31, 2018, increasing total savings to 5.6%``;` ``(8) an additional 1.5%``in the year commencing January` `1, 2019 `by May 31, 2019, increasing total savings to 7.1%``;` `and` ``(9) an additional 1.5% in each 12-month period` `thereafter.` (d) Notwithstanding the requirements of subsection (c) of` `this Section, a natural gas utility shall limit the amount of` `energy efficiency implemented in any``multi-year `3-year `reporting period established by subsection (f) of Section 8-104` `of this Act, by an amount necessary to limit the estimated` `average increase in the amounts paid by retail customers in` `connection with natural gas service to no more than 2% in the` `applicable``multi-year `3-year``reporting period. The energy` `savings requirements in subsection (c) of this Section may be` `reduced by the Commission for the subject plan, if the utility` `demonstrates by substantial evidence that it is highly unlikely` `that the requirements could be achieved without exceeding the` `applicable spending limits in any``multi-year `3-year``reporting` `period. No later than September 1, 2013, the Commission shall` `review the limitation on the amount of energy efficiency` `measures implemented pursuant to this Section and report to the` `General Assembly, in the report required by subsection (k) of` `this Section, its findings as to whether that limitation unduly` `constrains the procurement of energy efficiency measures.` (e)``The provisions of this subsection (e) apply to those` `multi-year plans that commence prior to January 1, 2018 `Natural` `gas utilities shall be responsible for overseeing the design,` `development, and filing of their efficiency plans with the` `Commission``. The utility shall utilize 75% of the available` `funding associated with energy efficiency programs approved by` `the Commission, and may outsource various aspects of program` `development and implementation. The remaining 25% of available` `funding shall be used by the Department of Commerce and` `Economic Opportunity to implement energy efficiency measures` `that achieve no less than 20% of the requirements of subsection` `(c) of this Section. Such measures shall be designed in` `conjunction with the utility and approved by the Commission.` `The Department may outsource development and implementation of` `energy efficiency measures. A minimum of 10% of the entire` `portfolio of cost-effective energy efficiency measures shall` `be procured from local government, municipal corporations,` `school districts, and community college districts. Five` `percent of the entire portfolio of cost-effective energy` `efficiency measures may be granted to local government and` `municipal corporations for market transformation initiatives.` `The Department shall coordinate the implementation of these` `measures and shall integrate delivery of natural gas efficiency` `programs with electric efficiency programs delivered pursuant` `to Section 8-103 of this Act, unless the Department can show` `that integration is not feasible.` The apportionment of the dollars to cover the costs to` `implement the Department's share of the portfolio of energy` `efficiency measures shall be made to the Department once the` `Department has executed rebate agreements, grants, or` `contracts for energy efficiency measures and provided` `supporting documentation for those rebate agreements, grants,` `and contracts to the utility. The Department is authorized to` `adopt any rules necessary and prescribe procedures in order to` `ensure compliance by applicants in carrying out the purposes of` `rebate agreements for energy efficiency measures implemented` `by the Department made under this Section.` The details of the measures implemented by the Department` `shall be submitted by the Department to the Commission in` `connection with the utility's filing regarding the energy` `efficiency measures that the utility implements.` The portfolio of measures, administered by both the` `utilities and the Department, shall, in combination, be` `designed to achieve the annual energy savings requirements set` `forth in subsection (c) of this Section, as modified by` `subsection (d) of this Section.` The utility and the Department shall agree upon a` `reasonable portfolio of measures and determine the measurable` `corresponding percentage of the savings goals associated with` `measures implemented by the Department.` No utility shall be assessed a penalty under subsection (f)` `of this Section for failure to make a timely filing if that` `failure is the result of a lack of agreement with the` `Department with respect to the allocation of responsibilities` `or related costs or target assignments. In that case, the` `Department and the utility shall file their respective plans` `with the Commission and the Commission shall determine an` `appropriate division of measures and programs that meets the` `requirements of this Section.` (e-5) The provisions of this subsection (e-5) shall be` `applicable to those multi-year plans that commence after` `December 31, 2017. Natural gas utilities shall be responsible` `for overseeing the design, development, and filing of their` `efficiency plans with the Commission and may outsource` `development and implementation of energy efficiency measures.` `A minimum of 10% of the entire portfolio of cost-effective` `energy efficiency measures shall be procured from local` `government, municipal corporations, school districts, and` `community college districts. Five percent of the entire` `portfolio of cost-effective energy efficiency measures may be` `granted to local government and municipal corporations for` `market transformation initiatives.` The utilities shall also present a portfolio of energy` `efficiency measures proportionate to the share of total annual` `utility revenues in Illinois from households at or below 150%` `of the poverty level. Such programs shall be targeted to` `households with incomes at or below 80% of area median income. (e-10)``A utility providing approved energy efficiency` `measures in this State shall be permitted to recover costs of` `those measures through an automatic adjustment clause tariff` `filed with and approved by the Commission. The tariff shall be` `established outside the context of a general rate case and` `shall be applicable to the utility's customers other than the` `customers described in subsection (m) of this Section. Each` `year the Commission shall initiate a review to reconcile any` `amounts collected with the actual costs and to determine the` `required adjustment to the annual tariff factor to match annual` `expenditures.` (e-15) For those multi-year plans that commence prior to` `January 1, 2018, each `Each``utility shall include, in its` `recovery of costs, the costs estimated for both the utility's` `and the Department's implementation of energy efficiency` `measures. Costs collected by the utility for measures` `implemented by the Department shall be submitted to the` `Department pursuant to Section 605-323 of the Civil` `Administrative Code of Illinois, shall be deposited into the` `Energy Efficiency Portfolio Standards Fund, and shall be used` `by the Department solely for the purpose of implementing these` `measures. A utility shall not be required to advance any moneys` `to the Department but only to forward such funds as it has` `collected. The Department shall report to the Commission on an` `annual basis regarding the costs actually incurred by the` `Department in the implementation of the measures. Any changes` `to the costs of energy efficiency measures as a result of plan` `modifications shall be appropriately reflected in amounts` `recovered by the utility and turned over to the Department.` The portfolio of measures, administered by both the` `utilities and the Department, shall, in combination, be` `designed to achieve the annual energy savings requirements set` `forth in subsection (c) of this Section, as modified by` `subsection (d) of this Section.` The utility and the Department shall agree upon a` `reasonable portfolio of measures and determine the measurable` `corresponding percentage of the savings goals associated with` `measures implemented by the Department.` No utility shall be assessed a penalty under subsection (f)` `of this Section for failure to make a timely filing if that` `failure is the result of a lack of agreement with the` `Department with respect to the allocation of responsibilities` `or related costs or target assignments. In that case, the` `Department and the utility shall file their respective plans` `with the Commission and the Commission shall determine an` `appropriate division of measures and programs that meets the` `requirements of this Section.` If the Department is unable to meet performance` `requirements for the portion of the portfolio implemented by` `the Department, then the utility and the Department shall` `jointly submit a modified filing to the Commission explaining` `the performance shortfall and recommending an appropriate` `course going forward, including any program modifications that` `may be appropriate in light of the evaluations conducted under` `item (8) of subsection (f) of this Section. In this case, the` `utility obligation to collect the Department's costs and turn` `over those funds to the Department under this subsection (e)` `shall continue only if the Commission approves the` `modifications to the plan proposed by the Department.` (f) No later than October 1, 2010, each gas utility shall` `file an energy efficiency plan with the Commission to meet the` `energy efficiency standards through May 31, 2014.``No later than` `October 1, 2013, each gas utility shall file an energy` `efficiency plan with the Commission to meet the energy` `efficiency standards through May 31, 2017. Beginning in 2017` `and every 4 `Every 3``years thereafter, each utility shall file``,` `no later than October 1,``an energy efficiency plan with the` `Commission``to meet the energy efficiency standards for the next` `applicable 4-year period beginning January 1 of the year` `following the filing. For those multi-year plans commencing on` `January 1, 2018, each utility shall file its proposed energy` `efficiency plan no later than 30 days after the effective date` `of this amendatory Act of the 99th General Assembly or May 1,` `2017, whichever is later. Beginning in 2021 and every 4 years` `thereafter, each utility shall file its energy efficiency plan` `no later than March 1``. If a utility does not file such a plan``on` `or before the applicable filing deadline for the plan `by` `October 1 of the applicable year``, then it shall face a penalty` `of $100,000 per day until the plan is filed.` Each utility's plan shall set forth the utility's proposals` `to meet the utility's portion of the energy efficiency` `standards identified in subsection (c) of this Section, as` `modified by subsection (d) of this Section, taking into account` `the unique circumstances of the utility's service territory.` `For those plans commencing after December 31, 2021, the `The `Commission shall seek public comment on the utility's plan and` `shall issue an order approving or disapproving each plan``within` `6 months after its submission. For those plans commencing on` `January 1, 2018, the Commission shall seek public comment on` `the utility's plan and shall issue an order approving or` `disapproving each plan no later than August 31, 2017, or 105` `days after the effective date of this amendatory Act of the` `99th General Assembly, whichever is later``. If the Commission` `disapproves a plan, the Commission shall, within 30 days,` `describe in detail the reasons for the disapproval and describe` `a path by which the utility may file a revised draft of the` `plan to address the Commission's concerns satisfactorily. If` `the utility does not refile with the Commission within 60 days` `after the disapproval, the utility shall be subject to` `penalties at a rate of $100,000 per day until the plan is` `filed. This process shall continue, and penalties shall accrue,` `until the utility has successfully filed a portfolio of energy` `efficiency measures. Penalties shall be deposited into the` `Energy Efficiency Trust Fund and the cost of any such penalties` `may not be recovered from ratepayers. In submitting proposed` `energy efficiency plans and funding levels to meet the savings` `goals adopted by this Act the utility shall:` ``(1) Demonstrate that its proposed energy efficiency` `measures will achieve the requirements that are identified` `in subsection (c) of this Section, as modified by` `subsection (d) of this Section.` ``(2) Present specific proposals to implement new` `building and appliance standards that have been placed into` `effect.` ``(3) Present estimates of the total amount paid for gas` `service expressed on a per therm basis associated with the` `proposed portfolio of measures designed to meet the` `requirements that are identified in subsection (c) of this` `Section, as modified by subsection (d) of this Section.` ``(4)``For those multi-year plans that commence prior to` `January 1, 2018, coordinate `Coordinate``with the Department` `to present a portfolio of energy efficiency measures` `proportionate to the share of total annual utility revenues` `in Illinois from households at or below 150% of the poverty` `level. Such programs shall be targeted to households with` `incomes at or below 80% of area median income.` ``(5) Demonstrate that its overall portfolio of energy` `efficiency measures, not including``low-income``programs` `described in `covered by``item (4) of this subsection (f)``and` `subsection (e-5) of this Section``, are cost-effective using` `the total resource cost test and represent a diverse cross` `section of opportunities for customers of all rate classes` `to participate in the programs.` ``(6) Demonstrate that a gas utility affiliated with an` `electric utility that is required to comply with Section` `8-103``or 8-103B``of this Act has integrated gas and electric` `efficiency measures into a single program that reduces` `program or participant costs and appropriately allocates` `costs to gas and electric ratepayers.``For those multi-year` `plans that commence prior to January 1, 2018, the `The `Department shall integrate all gas and electric programs it` `delivers in any such utilities' service territories,` `unless the Department can show that integration is not` `feasible or appropriate.` ``(7) Include a proposed cost recovery tariff mechanism` `to fund the proposed energy efficiency measures and to` `ensure the recovery of the prudently and reasonably` `incurred costs of Commission-approved programs.` ``(8) Provide for quarterly status reports tracking` `implementation of and expenditures for the utility's` `portfolio of measures and``, if applicable,``the Department's` `portfolio of measures, an annual independent review, and a` `full independent evaluation of the``multi-year `3-year `results of the performance and the cost-effectiveness of` `the utility's and``, if applicable,``Department's portfolios` `of measures and broader net program impacts and, to the` `extent practical, for adjustment of the measures on a going` `forward basis as a result of the evaluations. The resources` `dedicated to evaluation shall not exceed 3% of portfolio` `resources in any given``multi-year `3-year``period.` (g) No more than 3% of expenditures on energy efficiency` `measures may be allocated for demonstration of breakthrough` `equipment and devices.` (h) Illinois natural gas utilities that are affiliated by` `virtue of a common parent company may, at the utilities'` `request, be considered a single natural gas utility for` `purposes of complying with this Section.` (i) If, after 3 years, a gas utility fails to meet the` `efficiency standard specified in subsection (c) of this Section` `as modified by subsection (d), then it shall make a` `contribution to the Low-Income Home Energy Assistance Program.` `The total liability for failure to meet the goal shall be` `assessed as follows:` ``(1) a large gas utility shall pay $600,000;` ``(2) a medium gas utility shall pay $400,000; and` ``(3) a small gas utility shall pay $200,000.` For purposes of this Section, (i) a "large gas utility" is` `a gas utility that on December 31, 2008, served more than` `1,500,000 gas customers in Illinois; (ii) a "medium gas` `utility" is a gas utility that on December 31, 2008, served` `fewer than 1,500,000, but more than 500,000 gas customers in` `Illinois; and (iii) a "small gas utility" is a gas utility that` `on December 31, 2008, served fewer than 500,000 and more than` `100,000 gas customers in Illinois. The costs of this` `contribution may not be recovered from ratepayers.` If a gas utility fails to meet the efficiency standard` `specified in subsection (c) of this Section, as modified by` `subsection (d) of this Section, in any 2 consecutive``multi-year `3-year``planning periods, then the responsibility for` `implementing the utility's energy efficiency measures shall be` `transferred to an independent program administrator selected` `by the Commission. Reasonable and prudent costs incurred by the` `independent program administrator to meet the efficiency` `standard specified in subsection (c) of this Section, as` `modified by subsection (d) of this Section, may be recovered` `from the customers of the affected gas utilities, other than` `customers described in subsection (m) of this Section. The` `utility shall provide the independent program administrator` `with all information and assistance necessary to perform the` `program administrator's duties including but not limited to` `customer, account, and energy usage data, and shall allow the` `program administrator to include inserts in customer bills. The` `utility may recover reasonable costs associated with any such` `assistance.` (j) No utility shall be deemed to have failed to meet the` `energy efficiency standards to the extent any such failure is` `due to a failure of the Department.` (k) Not later than January 1, 2012, the Commission shall` `develop and solicit public comment on a plan to foster` `statewide coordination and consistency between statutorily` `mandated natural gas and electric energy efficiency programs to` `reduce program or participant costs or to improve program` `performance. Not later than September 1, 2013, the Commission` `shall issue a report to the General Assembly containing its` `findings and recommendations.` (l) This Section does not apply to a gas utility that on` `January 1, 2009, provided gas service to fewer than 100,000` `customers in Illinois.` (m) Subsections (a) through (k) of this Section do not` `apply to customers of a natural gas utility that have a North` `American Industry Classification System code number that is` `22111 or any such code number beginning with the digits 31, 32,` `or 33 and (i) annual usage in the aggregate of 4 million therms` `or more within the service territory of the affected gas` `utility or with aggregate usage of 8 million therms or more in` `this State and complying with the provisions of item (l) of` `this subsection (m); or (ii) using natural gas as feedstock and` `meeting the usage requirements described in item (i) of this` `subsection (m), to the extent such annual feedstock usage is` `greater than 60% of the customer's total annual usage of` `natural gas.` ``(1) Customers described in this subsection (m) of this` `Section shall apply, on a form approved on or before` `October 1, 2009 by the Department, to the Department to be` `designated as a self-directing customer ("SDC") or as an` `exempt customer using natural gas as a feedstock from which` `other products are made, including, but not limited to,` `feedstock for a hydrogen plant, on or before the 1st day of` `February, 2010. Thereafter, application may be made not` `less than 6 months before the filing date of the gas` `utility energy efficiency plan described in subsection (f)` `of this Section; however, a new customer that commences` `taking service from a natural gas utility after February 1,` `2010 may apply to become a SDC or exempt customer up to 30` `days after beginning service. Customers described in this` `subsection (m) that have not already been approved by the` `Department may apply to be designated a self-directing` `customer or exempt customer, on a form approved by the` `Department, between September 1, 2013 and September 30,` `2013. Customer applications that are approved by the` `Department under this amendatory Act of the 98th General` `Assembly shall be considered to be a self-directing` `customer or exempt customer, as applicable, for the current` `3-year planning period effective December 1, 2013. Such` `application shall contain the following:` `(A) the customer's certification that, at the time` `of its application, it qualifies to be a SDC or exempt` `customer described in this subsection (m) of this` `Section;` `(B) in the case of a SDC, the customer's` `certification that it has established or will` `establish by the beginning of the utility's``multi-year `3-year``planning period commencing subsequent to the` `application, and will maintain for accounting` `purposes, an energy efficiency reserve account and` `that the customer will accrue funds in said account to` `be held for the purpose of funding, in whole or in` `part, energy efficiency measures of the customer's` `choosing, which may include, but are not limited to,` `projects involving combined heat and power systems` `that use the same energy source both for the generation` `of electrical or mechanical power and the production of` `steam or another form of useful thermal energy or the` `use of combustible gas produced from biomass, or both;` `(C) in the case of a SDC, the customer's` `certification that annual funding levels for the` `energy efficiency reserve account will be equal to 2%` `of the customer's cost of natural gas, composed of the` `customer's commodity cost and the delivery service` `charges paid to the gas utility, or $150,000, whichever` `is less;` `(D) in the case of a SDC, the customer's` `certification that the required reserve account` `balance will be capped at 3 years' worth of accruals` `and that the customer may, at its option, make further` `deposits to the account to the extent such deposit` `would increase the reserve account balance above the` `designated cap level;` `(E) in the case of a SDC, the customer's` `certification that by October 1 of each year, beginning` `no sooner than October 1, 2012, the customer will` `report to the Department information, for the 12-month` `period ending May 31 of the same year, on all deposits` `and reductions, if any, to the reserve account during` `the reporting year, and to the extent deposits to the` `reserve account in any year are in an amount less than` `$150,000, the basis for such reduced deposits; reserve` `account balances by month; a description of energy` `efficiency measures undertaken by the customer and` `paid for in whole or in part with funds from the` `reserve account; an estimate of the energy saved, or to` `be saved, by the measure; and that the report shall` `include a verification by an officer or plant manager` `of the customer or by a registered professional` `engineer or certified energy efficiency trade` `professional that the funds withdrawn from the reserve` `account were used for the energy efficiency measures;` `(F) in the case of an exempt customer, the` `customer's certification of the level of gas usage as` `feedstock in the customer's operation in a typical year` `and that it will provide information establishing this` `level, upon request of the Department;` `(G) in the case of either an exempt customer or a` `SDC, the customer's certification that it has provided` `the gas utility or utilities serving the customer with` `a copy of the application as filed with the Department;` `(H) in the case of either an exempt customer or a` `SDC, certification of the natural gas utility or` `utilities serving the customer in Illinois including` `the natural gas utility accounts that are the subject` `of the application; and` `(I) in the case of either an exempt customer or a` `SDC, a verification signed by a plant manager or an` `authorized corporate officer attesting to the` `truthfulness and accuracy of the information contained` `in the application.` ``(2) The Department shall review the application to` `determine that it contains the information described in` `provisions (A) through (I) of item (1) of this subsection` `(m), as applicable. The review shall be completed within 30` `days after the date the application is filed with the` `Department. Absent a determination by the Department` `within the 30-day period, the applicant shall be considered` `to be a SDC or exempt customer, as applicable, for all` `subsequent``multi-year `3-year``planning periods, as of the` `date of filing the application described in this subsection` `(m). If the Department determines that the application does` `not contain the applicable information described in` `provisions (A) through (I) of item (1) of this subsection` `(m), it shall notify the customer, in writing, of its` `determination that the application does not contain the` `required information and identify the information that is` `missing, and the customer shall provide the missing` `information within 15 working days after the date of` `receipt of the Department's notification.` ``(3) The Department shall have the right to audit the` `information provided in the customer's application and` `annual reports to ensure continued compliance with the` `requirements of this subsection. Based on the audit, if the` `Department determines the customer is no longer in` `compliance with the requirements of items (A) through (I)` `of item (1) of this subsection (m), as applicable, the` `Department shall notify the customer in writing of the` `noncompliance. The customer shall have 30 days to establish` `its compliance, and failing to do so, may have its status` `as a SDC or exempt customer revoked by the Department. The` `Department shall treat all information provided by any` `customer seeking SDC status or exemption from the` `provisions of this Section as strictly confidential.` ``(4) Upon request, or on its own motion, the Commission` `may open an investigation, no more than once every 3 years` `and not before October 1, 2014, to evaluate the` `effectiveness of the self-directing program described in` `this subsection (m).` Customers described in this subsection (m) that applied to` `the Department on January 3, 2013, were approved by the` `Department on February 13, 2013 to be a self-directing customer` `or exempt customer, and receive natural gas from a utility that` `provides gas service to at least 500,000 retail customers in` `Illinois and electric service to at least 1,000,000 retail` `customers in Illinois shall be considered to be a` `self-directing customer or exempt customer, as applicable, for` `the current 3-year planning period effective December 1, 2013.` (n) The applicability of this Section to customers` `described in subsection (m) of this Section is conditioned on` `the existence of the SDC program. In no event will any` `provision of this Section apply to such customers after January` `1, 2020. (o) Utilities' 3-year energy efficiency plans approved by` `the Commission on or before the effective date of this` `amendatory Act of the 99th General Assembly for the period June` `1, 2014 through May 31, 2017 shall continue to be in force and` `effect through December 31, 2017 so that the energy efficiency` `programs set forth in those plans continue to be offered during` `the period June 1, 2017 through December 31, 2017. Each utility` `is authorized to increase, on a pro rata basis, the energy` `savings goals and budgets approved in its plan to reflect the` `additional 7 months of the plan's operation. `(Source: P.A. 97-813, eff. 7-13-12; 97-841, eff. 7-20-12;` `98-90, eff. 7-15-13; 98-225, eff. 8-9-13; 98-604, eff.` `12-17-13.)` (220 ILCS 5/9-107 new)` Sec. 9-107.``Revenue balancing adjustments.` (a) In this Section:` "Reconciliation period" means a period beginning with the` `January monthly billing period and extending through the` `December monthly billing period.` "Rate case reconciliation revenue requirement" means the` `final distribution revenue requirement or requirements` `approved by the Commission in the utility's rate case or` `formula rate proceeding to set the rates initially applicable` `in the relevant reconciliation period after the conclusion of` `the period. In the event the Commission has approved more than` `one revenue requirement for the reconciliation period, the` `amount of rate case revenue under each approved revenue` `requirement shall be prorated based upon the number of days` `under which each revenue requirement was in effect.` (b) If an electric utility has a performance-based formula` `rate in effect under Section 16-108.5, then the utility shall` `be permitted to revise the formula rate and schedules to reduce` `the 50 basis point values to zero that would otherwise apply` `under paragraph (5) of subsection (c) of Section 16-108.5. Such` `revision and reduction shall apply beginning with the` `reconciliation conducted for the 2017 calendar year.` If the utility no longer has a performance-based formula in` `effect under Section 16-108.5, then the utility shall be` `permitted to implement the revenue balancing adjustment tariff` `described in subsection (c) of this Section.` (c) An electric utility that is authorized under subsection` `(b) of this Section to implement a revenue balancing adjustment` `tariff may file the tariff for the purpose of preventing` `undercollections or overcollections of distribution revenues` `as compared to the revenue requirement or requirements approved` `by the Commission on which the rates giving rise to those` `revenues were based. The tariff shall calculate an annual` `adjustment that reflects any difference between the actual` `delivery service revenue billed for services provided during` `the relevant reconciliation period and the rate case` `reconciliation revenue requirement for the relevant` `reconciliation period and shall set forth the reconciliation` `categories or classes, or a combination of both, in a manner` `determined at the utility's discretion.` (d) A utility that elects to file the tariff authorized by` `this Section shall file the tariff outside the context of a` `general rate case or formula rate proceeding, and the` `Commission shall, after notice and hearing, approve the tariff` `or approve with modification no later than 120 days after the` `utility files the tariff, and the tariff shall remain in effect` `at the discretion of the utility. The tariff shall also require` `that the electric utility submit an annual revenue balancing` `reconciliation report to the Commission reflecting the` `difference between the actual delivery service revenue and rate` `case revenue for the applicable reconciliation and identifying` `the charges or credits to be applied thereafter. The annual` `revenue balancing reconciliation report shall be filed with the` `Commission no later than March 20 of the year following a` `reconciliation period. The Commission may initiate a review of` `the revenue balancing reconciliation report each year to` `determine if any subsequent adjustment is necessary to align` `actual delivery service revenue and rate case revenue. In the` `event the Commission elects to initiate such review, the` `Commission shall, after notice and hearing, enter an order` `approving, or approving as modified, such revenue balancing` `reconciliation report no later than 120 days after the utility` `files its report with the Commission. If the Commission does` `not initiate such review, the revenue balancing reconciliation` `report and the identified charges or credits shall be deemed` `accepted and approved 120 days after the utility files the` `report and shall not be subject to review in any other` `proceeding.` (220 ILCS 5/16-107) ` Sec. 16-107.``Real-time pricing. (a) Each electric utility shall file, on or before May 1,` `1998, a tariff or tariffs which allow nonresidential retail` `customers in the electric utility's service area to elect` `real-time pricing beginning October 1, 1998. (b) Each electric utility shall file, on or before May 1,` `2000, a tariff or tariffs which allow residential retail` `customers in the electric utility's service area to elect` `real-time pricing beginning October 1, 2000. (b-5) Each electric utility shall file a tariff or tariffs` `allowing residential retail customers in the electric` `utility's service area to elect real-time pricing beginning` `January 2, 2007.``The Commission may, after notice and hearing,` `approve the tariff or tariffs. `A customer who elects real-time` `pricing shall remain on such rate for a minimum of 12 months.` `The Commission may, after notice and hearing, approve the` `tariff or tariffs, provided that the Commission finds that the` `potential for demand reductions will result in net economic` `benefits to all residential customers of the electric utility.` `In examining economic benefits from demand reductions, the` `Commission shall, at a minimum, consider the following:` `improvements to system reliability and power quality,` `reduction in wholesale market prices and price volatility,` `electric utility cost avoidance and reductions, market power` `mitigation, and other benefits of demand reductions, but only` `to the extent that the effects of reduced demand can be` `demonstrated to lower the cost of electricity delivered to` `residential customers.``A tariff or tariffs approved pursuant to` `this subsection (b-5) shall, at a minimum, describe (i) the` `methodology for determining the market price of energy to be` `reflected in the real-time rate and (ii) the manner in which` `customers who elect real-time pricing will be provided with` `ready access to hourly market prices, including, but not` `limited to, day-ahead hourly energy prices.``A customer who` `elects real-time pricing under a tariff approved under this` `subsection (b-5) and thereafter terminates the election shall` `not return to taking service under the tariff for a period of` `12 months following the date on which the customer terminated` `real-time pricing. However, this limitation shall cease to` `apply on such date that the provision of electric power and` `energy is declared competitive under Section 16-113 of this Act` `for the customer group or groups to which this subsection (b-5)` `applies. A proceeding under this subsection (b-5) may not exceed 120` `days in length.` (b-10) Each electric utility providing real-time pricing` `pursuant to subsection (b-5) shall install a meter capable of` `recording hourly interval energy use at the service location of` `each customer that elects real-time pricing pursuant to this` `subsection.` (b-15) If the Commission issues an order pursuant to` `subsection (b-5), the affected electric utility shall contract` `with an entity not affiliated with the electric utility to` `serve as a program administrator to develop and implement a` `program to provide consumer outreach, enrollment, and` `education concerning real-time pricing and to establish and` `administer an information system and technical and other` `customer assistance that is necessary to enable customers to` `manage electricity use. The program administrator: (i) shall be` `selected and compensated by the electric utility, subject to` `Commission approval; (ii) shall have demonstrated technical` `and managerial competence in the development and` `administration of demand management programs; and (iii) may` `develop and implement risk management, energy efficiency, and` `other services related to energy use management for which the` `program administrator shall be compensated by participants in` `the program receiving such services. The electric utility shall` `provide the program administrator with all information and` `assistance necessary to perform the program administrator's` `duties, including, but not limited to, customer, account, and` `energy use data. The electric utility shall permit the program` `administrator to include inserts in residential customer bills` `2 times per year to assist with customer outreach and` `enrollment.` The program administrator shall submit an annual report to` `the electric utility no later than April 1 of each year` `describing the operation and results of the program, including` `information concerning the number and types of customers using` `real-time pricing, changes in customers' energy use patterns,` `an assessment of the value of the program to both participants` `and non-participants, and recommendations concerning` `modification of the program and the tariff or tariffs filed` `under subsection (b-5). This report shall be filed by the` `electric utility with the Commission within 30 days of receipt` `and shall be available to the public on the Commission's web` `site.` (b-20) The Commission shall monitor the performance of` `programs established pursuant to subsection (b-15) and shall` `order the termination or modification of a program if it` `determines that the program is not, after a reasonable period` `of time for development not to exceed 4 years, resulting in net` `benefits to the residential customers of the electric utility.` (b-25) An electric utility shall be entitled to recover` `reasonable costs incurred in complying with this Section,` `provided that recovery of the costs is fairly apportioned among` `its residential customers as provided in this subsection` `(b-25). The electric utility may apportion``greater``costs on the` `residential customers who elect real-time pricing, but may also` `impose some of the costs of real-time pricing on customers who` `do not elect real-time pricing``, provided that the Commission` `determines that the cost savings resulting from real-time` `pricing will exceed the costs imposed on customers for` `maintaining the program``.` (c) The electric utility's tariff or tariffs filed pursuant` `to this Section shall be subject to Article IX. (d) This Section does not apply to any electric utility` `providing service to 100,000 or fewer customers.` `(Source: P.A. 94-977, eff. 6-30-06.) (220 ILCS 5/16-107.5) Sec. 16-107.5.``Net electricity metering.` (a) The Legislature finds and declares that a program to` `provide net electricity metering, as defined in this Section,` `for eligible customers can encourage private investment in` `renewable energy resources, stimulate economic growth, enhance` `the continued diversification of Illinois' energy resource` `mix, and protect the Illinois environment. (b) As used in this Section, (i)``"community renewable` `generation project" shall have the meaning set forth in Section` `1-10 of the Illinois Power Agency Act; (ii)``"eligible customer"` `means a retail customer that owns or operates a solar, wind, or` `other eligible renewable electrical generating facility with a` `rated capacity of not more than 2,000 kilowatts that is located` `on the customer's premises and is intended primarily to offset` `the customer's own electrical requirements;``(iii) `(ii) `"electricity provider" means an electric utility or` `alternative retail electric supplier;``(iv) `(iii)``"eligible` `renewable electrical generating facility" means a generator` `that is interconnected under rules adopted by the Commission` `and is``powered by solar electric energy, wind, dedicated crops` `grown for electricity generation, agricultural residues,` `untreated and unadulterated wood waste, landscape trimmings,` `livestock manure, anaerobic digestion of livestock or food` `processing waste, fuel cells or microturbines powered by` `renewable fuels, or hydroelectric energy;``(v) `and (iv)``"net` `electricity metering" (or "net metering") means the` `measurement, during the billing period applicable to an` `eligible customer, of the net amount of electricity supplied by` `an electricity provider to the customer's premises or provided` `to the electricity provider by the customer``or subscriber; (vi)` `"subscriber" shall have the meaning as set forth in Section` `1-10 of the Illinois Power Agency Act; and (vii) "subscription"` `shall have the meaning set forth in Section 1-10 of the` `Illinois Power Agency Act``. (c) A net metering facility shall be equipped with metering` `equipment that can measure the flow of electricity in both` `directions at the same rate.` ``(1) For eligible customers whose electric service has` `not been declared competitive pursuant to Section 16-113 of` `this Act as of July 1, 2011 and whose electric delivery` `service is provided and measured on a kilowatt-hour basis` `and electric supply service is not provided based on hourly` `pricing, this shall typically be accomplished through use` `of a single, bi-directional meter. If the eligible` `customer's existing electric revenue meter does not meet` `this requirement, the electricity provider shall arrange` `for the local electric utility or a meter service provider` `to install and maintain a new revenue meter at the` `electricity provider's expense``, which may be the smart` `meter described by subsection (b) of Section 16-108.5 of` `this Act``.` ``(2) For eligible customers whose electric service has` `not been declared competitive pursuant to Section 16-113 of` `this Act as of July 1, 2011 and whose electric delivery` `service is provided and measured on a kilowatt demand basis` `and electric supply service is not provided based on hourly` `pricing, this shall typically be accomplished through use` `of a dual channel meter capable of measuring the flow of` `electricity both into and out of the customer's facility at` `the same rate and ratio. If such customer's existing` `electric revenue meter does not meet this requirement, then` `the electricity provider shall arrange for the local` `electric utility or a meter service provider to install and` `maintain a new revenue meter at the electricity provider's` `expense``, which may be the smart meter described by` `subsection (b) of Section 16-108.5 of this Act``.` ``(3) For all other eligible customers,``until such time` `as the local electric utility installs a smart meter, as` `described by subsection (b) of Section 16-108.5 of this` `Act,``the electricity provider may arrange for the local` `electric utility or a meter service provider to install and` `maintain metering equipment capable of measuring the flow` `of electricity both into and out of the customer's facility` `at the same rate and ratio, typically through the use of a` `dual channel meter. If the eligible customer's existing` `electric revenue meter does not meet this requirement, then` `the costs of installing such equipment shall be paid for by` `the customer.` (d) An electricity provider shall measure and charge or` `credit for the net electricity supplied to eligible customers` `or provided by eligible customers whose electric service has` `not been declared competitive pursuant to Section 16-113 of` `this `the``Act as of July 1, 2011 and whose electric delivery` `service is provided and measured on a kilowatt-hour basis and` `electric supply service is not provided based on hourly pricing` `in the following manner: ``(1) If the amount of electricity used by the customer` `during the billing period exceeds the amount of electricity` `produced by the customer, the electricity provider shall` `charge the customer for the net electricity supplied to and` `used by the customer as provided in subsection (e-5) of` `this Section. ``(2) If the amount of electricity produced by a customer` `during the billing period exceeds the amount of electricity` `used by the customer during that billing period, the` `electricity provider supplying that customer shall apply a` `1:1 kilowatt-hour credit to a subsequent bill for service` `to the customer for the net electricity supplied to the` `electricity provider. The electricity provider shall` `continue to carry over any excess kilowatt-hour credits` `earned and apply those credits to subsequent billing` `periods to offset any customer-generator consumption in` `those billing periods until all credits are used or until` `the end of the annualized period. ``(3) At the end of the year or annualized over the` `period that service is supplied by means of net metering,` `or in the event that the retail customer terminates service` `with the electricity provider prior to the end of the year` `or the annualized period, any remaining credits in the` `customer's account shall expire. (d-5) An electricity provider shall measure and charge or` `credit for the net electricity supplied to eligible customers` `or provided by eligible customers whose electric service has` `not been declared competitive pursuant to Section 16-113 of` `this Act as of July 1, 2011 and whose electric delivery service` `is provided and measured on a kilowatt-hour basis and electric` `supply service is provided based on hourly pricing in the` `following manner:` ``(1) If the amount of electricity used by the customer` `during any hourly period exceeds the amount of electricity` `produced by the customer, the electricity provider shall` `charge the customer for the net electricity supplied to and` `used by the customer according to the terms of the contract` `or tariff to which the same customer would be assigned to` `or be eligible for if the customer was not a net metering` `customer.` ``(2) If the amount of electricity produced by a customer` `during any hourly period exceeds the amount of electricity` `used by the customer during that hourly period, the energy` `provider shall apply a credit for the net kilowatt-hours` `produced in such period. The credit shall consist of an` `energy credit and a delivery service credit. The energy` `credit shall be valued at the same price per kilowatt-hour` `as the electric service provider would charge for` `kilowatt-hour energy sales during that same hourly period.` `The delivery credit shall be equal to the net` `kilowatt-hours produced in such hourly period times a` `credit that reflects all kilowatt-hour based charges in the` `customer's electric service rate, excluding energy` `charges.` (e) An electricity provider shall measure and charge or` `credit for the net electricity supplied to eligible customers` `whose electric service has not been declared competitive` `pursuant to Section 16-113 of this Act as of July 1, 2011 and` `whose electric delivery service is provided and measured on a` `kilowatt demand basis and electric supply service is not` `provided based on hourly pricing in the following manner:` ``(1) If the amount of electricity used by the customer` `during the billing period exceeds the amount of electricity` `produced by the customer, then the electricity provider` `shall charge the customer for the net electricity supplied` `to and used by the customer as provided in subsection (e-5)` `of this Section. The customer shall remain responsible for` `all taxes, fees, and utility delivery charges that would` `otherwise be applicable to the net amount of electricity` `used by the customer.` ``(2) If the amount of electricity produced by a customer` `during the billing period exceeds the amount of electricity` `used by the customer during that billing period, then the` `electricity provider supplying that customer shall apply a` `1:1 kilowatt-hour credit that reflects the kilowatt-hour` `based charges in the customer's electric service rate to a` `subsequent bill for service to the customer for the net` `electricity supplied to the electricity provider. The` `electricity provider shall continue to carry over any` `excess kilowatt-hour credits earned and apply those` `credits to subsequent billing periods to offset any` `customer-generator consumption in those billing periods` `until all credits are used or until the end of the` `annualized period.` ``(3) At the end of the year or annualized over the` `period that service is supplied by means of net metering,` `or in the event that the retail customer terminates service` `with the electricity provider prior to the end of the year` `or the annualized period, any remaining credits in the` `customer's account shall expire.` (e-5) An electricity provider shall provide electric` `service to eligible customers who utilize net metering at` `non-discriminatory rates that are identical, with respect to` `rate structure, retail rate components, and any monthly` `charges, to the rates that the customer would be charged if not` `a net metering customer. An electricity provider shall not` `charge net metering customers any fee or charge or require` `additional equipment, insurance, or any other requirements not` `specifically authorized by interconnection standards` `authorized by the Commission, unless the fee, charge, or other` `requirement would apply to other similarly situated customers` `who are not net metering customers. The customer will remain` `responsible for all taxes, fees, and utility delivery charges` `that would otherwise be applicable to the net amount of` `electricity used by the customer. Subsections (c) through (e)` `of this Section shall not be construed to prevent an` `arms-length agreement between an electricity provider and an` `eligible customer that sets forth different prices, terms, and` `conditions for the provision of net metering service,` `including, but not limited to, the provision of the appropriate` `metering equipment for non-residential customers. (f) Notwithstanding the requirements of subsections (c)` `through (e-5) of this Section, an electricity provider must` `require dual-channel metering for customers operating eligible` `renewable electrical generating facilities with a nameplate` `rating up to 2,000 kilowatts and to whom the provisions of` `neither subsection (d), (d-5), nor (e) of this Section apply.` `In such cases, electricity charges and credits shall be` `determined as follows:` ``(1) The electricity provider shall assess and the` `customer remains responsible for all taxes, fees, and` `utility delivery charges that would otherwise be` `applicable to the gross amount of kilowatt-hours supplied` `to the eligible customer by the electricity provider.` ``(2) Each month that service is supplied by means of` `dual-channel metering, the electricity provider shall` `compensate the eligible customer for any excess` `kilowatt-hour credits at the electricity provider's` `avoided cost of electricity supply over the monthly period` `or as otherwise specified by the terms of a power-purchase` `agreement negotiated between the customer and electricity` `provider.` ``(3) For all eligible net metering customers taking` `service from an electricity provider under contracts or` `tariffs employing``hourly or``time of use rates, any monthly` `consumption of electricity shall be calculated according` `to the terms of the contract or tariff to which the same` `customer would be assigned to or be eligible for if the` `customer was not a net metering customer. When those same` `customer-generators are net generators during any discrete` `hourly or``time of use period, the net kilowatt-hours` `produced shall be valued at the same price per` `kilowatt-hour as the electric service provider would` `charge for retail kilowatt-hour sales during that same time` `of use period.` (g) For purposes of federal and State laws providing` `renewable energy credits or greenhouse gas credits, the` `eligible customer shall be treated as owning and having title` `to the renewable energy attributes, renewable energy credits,` `and greenhouse gas emission credits related to any electricity` `produced by the qualified generating unit. The electricity` `provider may not condition participation in a net metering` `program on the signing over of a customer's renewable energy` `credits; provided, however, this subsection (g) shall not be` `construed to prevent an arms-length agreement between an` `electricity provider and an eligible customer that sets forth` `the ownership or title of the credits. (h) Within 120 days after the effective date of this` `amendatory Act of the 95th General Assembly, the Commission` `shall establish standards for net metering and, if the` `Commission has not already acted on its own initiative,` `standards for the interconnection of eligible renewable` `generating equipment to the utility system. The` `interconnection standards shall address any procedural` `barriers, delays, and administrative costs associated with the` `interconnection of customer-generation while ensuring the` `safety and reliability of the units and the electric utility` `system. The Commission shall consider the Institute of` `Electrical and Electronics Engineers (IEEE) Standard 1547 and` `the issues of (i) reasonable and fair fees and costs, (ii)` `clear timelines for major milestones in the interconnection` `process, (iii) nondiscriminatory terms of agreement, and (iv)` `any best practices for interconnection of distributed` `generation. (i) All electricity providers shall begin to offer net` `metering no later than April 1, 2008. (j) An electricity provider shall provide net metering to` `eligible customers until the load of its net metering customers` `equals 5% of the total peak demand supplied by that electricity` `provider during the previous year.``After such time as the load` `of the electricity provider's net metering customers equals 5%` `of the total peak demand supplied by that electricity provider` `during the previous year, eligible customers that begin taking` `net metering shall only be eligible for netting of energy. `Electricity providers are authorized to offer net metering` `beyond the 5% level if they so choose. `` (k) Each electricity provider shall maintain records and` `report annually to the Commission the total number of net` `metering customers served by the provider, as well as the type,` `capacity, and energy sources of the generating systems used by` `the net metering customers. Nothing in this Section shall limit` `the ability of an electricity provider to request the redaction` `of information deemed by the Commission to be confidential` `business information.``Each electricity provider shall notify` `the Commission when the total generating capacity of its net` `metering customers is equal to or in excess of the 5% cap` `specified in subsection (j) of this Section.` ``(l)``(1)``Notwithstanding the definition of "eligible` `customer" in item``(ii) `(i)``of subsection (b) of this` `Section, each electricity provider shall``consider whether` `to``allow``meter aggregation for the purposes of``net metering` `as set forth in this subsection (l) and for the following` `projects `on``:` `(A) `(1)``properties owned or leased by multiple` `customers that contribute to the operation of an` `eligible renewable electrical generating``facility` `through an ownership or leasehold interest of at least` `200 watts in such``facility, such as a community-owned` `wind project, a community-owned biomass project, a` `community-owned solar project, or a community methane` `digester processing livestock waste from multiple` `sources``, provided that the facility is also located` `within the utility's service territory``;``and `(B) `(2)``individual units, apartments, or` `properties``located in a single building that are``owned` `or leased by multiple customers and collectively` `served by a common eligible renewable electrical` `generating facility, such as an``office or``apartment` `building``, a shopping center or strip mall``served by` `photovoltaic panels on the roof``; and `. `(C) subscriptions to community renewable` `generation projects.` ``In addition, the nameplate capacity of the eligible` `renewable electric generating facility that serves the` `demand of the properties, units, or apartments identified` `in paragraphs (1) and (2) of this subsection (l) shall not` `exceed 2,000 kilowatts in nameplate capacity in total. Any` `eligible renewable electrical generating facility or` `community renewable generation project that is powered by` `photovoltaic electric energy and installed after the` `effective date of this amendatory Act of the 99th General` `Assembly must be installed by a qualified person in` `compliance with the requirements of Section 16-128A of the` `Public Utilities Act and any rules or regulations adopted` `thereunder.` ``(2) Notwithstanding anything to the contrary, an` `electricity provider shall provide credits for the` `electricity produced by the projects described in` `paragraph (1) of this subsection (l). The electricity` `provider shall provide credits at the subscriber's energy` `supply rate on the subscriber's monthly bill equal to the` `subscriber's share of the production of electricity from` `the project, as determined by paragraph (3) of this` `subsection (l). ``(3)``For the purposes of``facilitating net metering, the` `owner or operator of the eligible renewable electrical` `generating facility or community renewable generation` `project shall be responsible for determining the amount of` `the credit that each customer or subscriber participating` `in a project under this subsection (l) is to receive in the` `following manner: `this subsection (l), "meter aggregation"` `means the combination of reading and billing on a pro rata` `basis for the types of eligible customers described in this` `Section. `(A) The owner or operator shall, on a monthly` `basis, provide to the electric utility the` `kilowatthours of generation attributable to each of` `the utility's retail customers and subscribers` `participating in projects under this subsection (l) in` `accordance with the customer's or subscriber's share` `of the eligible renewable electric generating` `facility's or community renewable generation project's` `output of power and energy for such month. The owner or` `operator shall electronically transmit such` `calculations and associated documentation to the` `electric utility, in a format or method set forth in` `the applicable tariff, on a monthly basis so that the` `electric utility can reflect the monetary credits on` `customers' and subscribers' electric utility bills.` `The electric utility shall be permitted to revise its` `tariffs to implement the provisions of this amendatory` `Act of the 99th General Assembly. The owner or operator` `shall separately provide the electric utility with the` `documentation detailing the calculations supporting` `the credit in the manner set forth in the applicable` `tariff. `(B) For those participating customers and` `subscribers who receive their energy supply from an` `alternative retail electric supplier, the electric` `utility shall remit to the applicable alternative` `retail electric supplier the information provided` `under subparagraph (A) of this paragraph (3) for such` `customers and subscribers in a manner set forth in such` `alternative retail electric supplier's net metering` `program, or as otherwise agreed between the utility and` `the alternative retail electric supplier. The` `alternative retail electric supplier shall then submit` `to the utility the amount of the charges for power and` `energy to be applied to such customers and subscribers,` `including the amount of the credit associated with net` `metering. `(C) A participating customer or subscriber may` `provide authorization as required by applicable law` `that directs the electric utility to submit` `information to the owner or operator of the eligible` `renewable electrical generating facility or community` `renewable generation project to which the customer or` `subscriber has an ownership or leasehold interest or a` `subscription. Such information shall be limited to the` `components of the net metering credit calculated under` `this subsection (l), including the bill credit rate,` `total kilowatthours, and total monetary credit value` `applied to the customer's or subscriber's bill for the` `monthly billing period. (l-5) Within 90 days after the effective date of this` `amendatory Act of the 99th General Assembly, each electric` `utility subject to this Section shall file a tariff to` `implement the provisions of subsection (l) of this Section,` `which shall, consistent with the provisions of subsection (l),` `describe the terms and conditions under which owners or` `operators of qualifying properties, units, or apartments may` `participate in net metering. The Commission shall approve, or` `approve with modification, the tariff within 120 days after the` `effective date of this amendatory Act of the 99th General` `Assembly. (m) Nothing in this Section shall affect the right of an` `electricity provider to continue to provide, or the right of a` `retail customer to continue to receive service pursuant to a` `contract for electric service between the electricity provider` `and the retail customer in accordance with the prices, terms,` `and conditions provided for in that contract. Either the` `electricity provider or the customer may require compliance` `with the prices, terms, and conditions of the contract.` (n) At such time, if any, that the load of the electricity` `provider's net metering customers equals 5% of the total peak` `demand supplied by that electricity provider during the` `previous year, as specified in subsection (j) of this Section,` `the net metering services described in subsections (d), (d-5),` `(e), (e-5), and (f) of this Section shall no longer be offered,` `except as to those retail customers that are receiving net` `metering service under these subsections at the time the net` `metering services under those subsections are no longer` `offered. Those retail customers that begin taking net metering` `service after the date that net metering services are no longer` `offered under such subsections shall be subject to the` `provisions set forth in the following paragraphs (1) through` `(3) of this subsection (n):` ``(1) An electricity provider shall charge or credit for` `the net electricity supplied to eligible customers or` `provided by eligible customers whose electric supply` `service is not provided based on hourly pricing in the` `following manner:` `(A) If the amount of electricity used by the` `customer during the billing period exceeds the amount` `of electricity produced by the customer, then the` `electricity provider shall charge the customer for the` `net kilowatt-hour based electricity charges reflected` `in the customer's electric service rate supplied to and` `used by the customer as provided in paragraph (3) of` `this subsection (n).` `(B) If the amount of electricity produced by a` `customer during the billing period exceeds the amount` `of electricity used by the customer during that billing` `period, then the electricity provider supplying that` `customer shall apply a 1:1 kilowatt-hour energy credit` `that reflects the kilowatt-hour based energy charges` `in the customer's electric service rate to a subsequent` `bill for service to the customer for the net` `electricity supplied to the electricity provider. The` `electricity provider shall continue to carry over any` `excess kilowatt-hour energy credits earned and apply` `those credits to subsequent billing periods to offset` `any customer-generator consumption in those billing` `periods until all credits are used or until the end of` `the annualized period.` `(C) At the end of the year or annualized over the` `period that service is supplied by means of net` `metering, or in the event that the retail customer` `terminates service with the electricity provider prior` `to the end of the year or the annualized period, any` `remaining credits in the customer's account shall` `expire.` ``(2) An electricity provider shall charge or credit for` `the net electricity supplied to eligible customers or` `provided by eligible customers whose electric supply` `service is provided based on hourly pricing in the` `following manner:` `(A) If the amount of electricity used by the` `customer during any hourly period exceeds the amount of` `electricity produced by the customer, then the` `electricity provider shall charge the customer for the` `net electricity supplied to and used by the customer as` `provided in paragraph (3) of this subsection (n).` `(B) If the amount of electricity produced by a` `customer during any hourly period exceeds the amount of` `electricity used by the customer during that hourly` `period, the energy provider shall calculate an energy` `credit for the net kilowatt-hours produced in such` `period. The value of the energy credit shall be` `calculated using the same price per kilowatt-hour as` `the electric service provider would charge for` `kilowatt-hour energy sales during that same hourly` `period.` ``(3) An electricity provider shall provide electric` `service to eligible customers who utilize net metering at` `non-discriminatory rates that are identical, with respect` `to rate structure, retail rate components, and any monthly` `charges, to the rates that the customer would be charged if` `not a net metering customer. An electricity provider shall` `charge the customer for the net electricity supplied to and` `used by the customer according to the terms of the contract` `or tariff to which the same customer would be assigned or` `be eligible for if the customer was not a net metering` `customer. An electricity provider shall not charge net` `metering customers any fee or charge or require additional` `equipment, insurance, or any other requirements not` `specifically authorized by interconnection standards` `authorized by the Commission, unless the fee, charge, or` `other requirement would apply to other similarly situated` `customers who are not net metering customers. The charge or` `credit that the customer receives for net electricity shall` `be at a rate equal to the customer's energy supply rate.` `The customer remains responsible for the gross amount of` `delivery services charges, supply-related charges that are` `kilowatt based, and all taxes and fees related to such` `charges. The customer also remains responsible for all` `taxes and fees that would otherwise be applicable to the` `net amount of electricity used by the customer. Paragraphs` `(1) and (2) of this subsection (n) shall not be construed` `to prevent an arms-length agreement between an electricity` `provider and an eligible customer that sets forth different` `prices, terms, and conditions for the provision of net` `metering service, including, but not limited to, the` `provision of the appropriate metering equipment for` `non-residential customers. Nothing in this paragraph (3)` `shall be interpreted to mandate that a utility that is only` `required to provide delivery services to a given customer` `must also sell electricity to such customer. `` `(Source: P.A. 97-616, eff. 10-26-11; 97-646, eff. 12-30-11;` `97-824, eff. 7-18-12.)` (220 ILCS 5/16-107.6 new)` Sec. 16-107.6.``Distributed generation rebate.` (a) In this Section:` "Smart inverter" means a device that converts direct` `current into alternating current and can autonomously` `contribute to grid support during excursions from normal` `operating voltage and frequency conditions by providing each of` `the following: dynamic reactive and real power support, voltage` `and frequency ride-through, ramp rate controls, communication` `systems with ability to accept external commands, and other` `functions from the electric utility.` "Subscriber" has the meaning set forth in Section 1-10 of` `the Illinois Power Agency Act.` "Subscription" has the meaning set forth in Section 1-10 of` `the Illinois Power Agency Act.` "Threshold date" means the date on which the load of an` `electricity provider's net metering customers equals 5% of the` `total peak demand supplied by that electricity provider during` `the previous year, as specified under subsection (j) of Section` `16-107.5 of this Act.` (b) An electric utility that serves more than 200,000` `customers in the State shall file a petition with the` `Commission requesting approval of the utility's tariff to` `provide a rebate to a retail customer who owns or operates` `distributed generation that meets the following criteria:` ``(1) has a nameplate generating capacity no greater than` `2,000 kilowatts and is primarily used to offset that` `customer's electricity load;` ``(2) is located on the customer's premises, for the` `customer's own use, and not for commercial use or sales,` `including, but not limited to, wholesale sales of electric` `power and energy;` ``(3) is located in the electric utility's service` `territory; and` ``(4) is interconnected under rules adopted by the` `Commission by means of the inverter or smart inverter` `required by this Section, as applicable.` For purposes of this Section, "distributed generation"` `shall satisfy the definition of distributed renewable energy` `generation device set forth in Section 1-10 of the Illinois` `Power Agency Act to the extent such definition is consistent` `with the requirements of this Section. In addition, any new photovoltaic distributed generation` `that is installed after the effective date of this amendatory` `Act of the 99th General Assembly must be installed by a` `qualified person, as defined by subsection (i) of Section 1-56` `of the Illinois Power Agency Act. The tariff shall provide that the utility shall be` `permitted to operate and control the smart inverter associated` `with the distributed generation that is the subject of the` `rebate for the purpose of preserving reliability during` `distribution system reliability events and shall address the` `terms and conditions of the operation and the compensation` `associated with the operation. Nothing in this Section shall` `negate or supersede Institute of Electrical and Electronics` `Engineers interconnection requirements or standards or other` `similar standards or requirements. The tariff shall also` `provide for additional uses of the smart inverter that shall be` `separately compensated and which may include, but are not` `limited to, voltage and VAR support, regulation, and other grid` `services. As part of the proceeding described in subsection (e)` `of this Section, the Commission shall review and determine` `whether smart inverters can provide any additional uses or` `services. If the Commission determines that an additional use` `or service would be beneficial, the Commission shall determine` `the terms and conditions of the operation and how the use or` `service should be separately compensated.` (c) The proposed tariff authorized by subsection (b) of` `this Section shall include the following participation terms` `and formulae to calculate the value of the rebates to be` `applied under this Section for distributed generation that` `satisfies the criteria set forth in subsection (b) of this` `Section:` ``(1) Until the utility files its tariff or tariffs to` `place into effect the rebate values established by the` `Commission under subsection (e) of this Section,` `non-residential customers that are taking service under a` `net metering program offered by an electricity provider` `under the terms of Section 16-107.5 of this Act may apply` `for a rebate as provided for in this Section. The value of` `the rebate shall be $250 per kilowatt of nameplate` `generating capacity, measured as nominal DC power output,` `of a non-residential customer's distributed generation.` ``(2) After the utility's tariff or tariffs setting the` `new rebate values established under subsection (d) of this` `Section take effect, retail customers may, as applicable,` `make the following elections:` `(A) Residential customers that are taking service` `under a net metering program offered by an electricity` `provider under the terms of Section 16-107.5 of this` `Act on the threshold date may elect to either continue` `to take such service under the terms of such program as` `in effect on such threshold date for the useful life of` `the customer's eligible renewable electric generating` `facility as defined in such Section, or file an` `application to receive a rebate under the terms of this` `Section, provided that such application must be` `submitted within 6 months after the effective date of` `the tariff approved under subsection (d) of this` `Section. The value of the rebate shall be the amount` `established by the Commission and reflected in the` `utility's tariff pursuant to subsection (e) of this` `Section.` `(B) Non-residential customers that are taking` `service under a net metering program offered by an` `electricity provider under the terms of Section` `16-107.5 of this Act on the threshold date may apply` `for a rebate as provided for in this Section. The value` `of the rebate shall be the amount established by the` `Commission and reflected in the utility's tariff` `pursuant to subsection (e) of this Section.` ``(3) Upon approval of a rebate application submitted` `under this subsection (c), the retail customer shall no` `longer be entitled to receive any delivery service credits` `for the excess electricity generated by its facility and` `shall be subject to the provisions of subsection (n) of` `Section 16-107.5 of this Act.` ``(4) To be eligible for a rebate described in this` `subsection (c), customers who begin taking service after` `the effective date of this amendatory Act of the 99th` `General Assembly under a net metering program offered by an` `electricity provider under the terms of Section 16-107.5 of` `this Act must have a smart inverter associated with the` `customer's distributed generation.` (d) The Commission shall review the proposed tariff` `submitted under subsections (b) and (c) of this Section and may` `make changes to the tariff that are consistent with this` `Section and with the Commission's authority under Article IX of` `this Act, subject to notice and hearing. Following notice and` `hearing, the Commission shall issue an order approving, or` `approving with modification, such tariff no later than 240 days` `after the utility files its tariff.` (e) When the total generating capacity of the electricity` `provider's net metering customers is equal to 3%, the` `Commission shall open an investigation into an annual process` `and formula for calculating the value of rebates for the retail` `customers described in subsections (b) and (f) of this Section` `that submit rebate applications after the threshold date for an` `electric utility that elected to file a tariff pursuant to this` `Section. The investigation shall include diverse sets of` `stakeholders, calculations for valuing distributed energy` `resource benefits to the grid based on best practices, and` `assessments of present and future technological capabilities` `of distributed energy resources. The value of such rebates` `shall reflect the value of the distributed generation to the` `distribution system at the location at which it is` `interconnected, taking into account the geographic,` `time-based, and performance-based benefits, as well as` `technological capabilities and present and future grid needs.` `No later than 10 days after the Commission enters its final` `order under this subsection (e), the utility shall file its` `tariff or tariffs in compliance with the order, and the` `Commission shall approve, or approve with modification, the` `tariff or tariffs within 45 days after the utility's filing.` `For those rebate applications filed after the threshold date` `but before the utility's tariff or tariffs filed pursuant to` `this subsection (e) take effect, the value of the rebate shall` `remain at the value established in subsection (c) of this` `Section until the tariff is approved.` (f) Notwithstanding any provision of this Act to the` `contrary, the owner, developer, or subscriber of a generation` `facility that is part of a net metering program provided under` `subsection (l) of Section 16-107.5 shall also be eligible to` `apply for the rebate described in this Section. A subscriber to` `the generation facility may apply for a rebate in the amount of` `the subscriber's subscription only if the owner, developer, or` `previous subscriber to the same panel or panels has not already` `submitted an application, and, regardless of whether the` `subscriber is a residential or non-residential customer, may be` `allowed the amount identified in paragraph (1) of subsection` `(c) or in subsection (e) of this Section applicable to such` `customer on the date that the application is submitted. An` `application for a rebate for a portion of a project described` `in this subsection (f) may be submitted at or after the time` `that a related request for net metering is made.` (g) No later than 60 days after the utility receives an` `application for a rebate under its tariff approved under` `subsection (d) or (e) of this Section, the utility shall issue` `a rebate to the applicant under the terms of the tariff. In the` `event the application is incomplete or the utility is otherwise` `unable to calculate the payment based on the information` `provided by the owner, the utility shall issue the payment no` `later than 60 days after the application is complete or all` `requested information is received.` (h) An electric utility shall recover from its retail` `customers all of the costs of the rebates made under a tariff` `or tariffs placed into effect under this Section, including,` `but not limited to, the value of the rebates and all costs` `incurred by the utility to comply with and implement this` `Section, consistent with the following provisions:` ``(1) The utility shall defer the full amount of its` `costs incurred under this Section as a regulatory asset.` `The total costs deferred as a regulatory asset shall be` `amortized over a 15-year period. The unamortized balance` `shall be recognized as of December 31 for a given year. The` `utility shall also earn a return on the total of the` `unamortized balance of the regulatory assets, less any` `deferred taxes related to the unamortized balance, at an` `annual rate equal to the utility's weighted average cost of` `capital that includes, based on a year-end capital` `structure, the utility's actual cost of debt for the` `applicable calendar year and a cost of equity, which shall` `be calculated as the sum of (i) the average for the` `applicable calendar year of the monthly average yields of` `30-year U.S. Treasury bonds published by the Board of` `Governors of the Federal Reserve System in its weekly H.15` `Statistical Release or successor publication; and (ii) 580` `basis points, including a revenue conversion factor` `calculated to recover or refund all additional income taxes` `that may be payable or receivable as a result of that` `return.` ``When an electric utility creates a regulatory asset` `under the provisions of this Section, the costs are` `recovered over a period during which customers also receive` `a benefit, which is in the public interest. Accordingly, it` `is the intent of the General Assembly that an electric` `utility that elects to create a regulatory asset under the` `provisions of this Section shall recover all of the` `associated costs, including, but not limited to, its cost` `of capital as set forth in this Section. After the` `Commission has approved the prudence and reasonableness of` `the costs that comprise the regulatory asset, the electric` `utility shall be permitted to recover all such costs, and` `the value and recoverability through rates of the` `associated regulatory asset shall not be limited, altered,` `impaired, or reduced. To enable the financing of the` `incremental capital expenditures, including regulatory` `assets, for electric utilities that serve less than` `3,000,000 retail customers but more than 500,000 retail` `customers in the State, the utility's actual year-end` `capital structure that includes a common equity ratio,` `excluding goodwill, of up to and including 50% of the total` `capital structure shall be deemed reasonable and used to` `set rates.` ``(2) The utility, at its election, may recover all of` `the costs it incurs under this Section as part of a filing` `for a general increase in rates under Article IX of this` `Act, as part of an annual filing to update a` `performance-based formula rate under subsection (d) of` `Section 16-108.5 of this Act, or through an automatic` `adjustment clause tariff, provided that nothing in this` `paragraph (2) permits the double recovery of such costs` `from customers. If the utility elects to recover the costs` `it incurs under this Section through an automatic` `adjustment clause tariff, the utility may file its proposed` `tariff together with the tariff it files under subsection` `(b) of this Section or at a later time. The proposed tariff` `shall provide for an annual reconciliation, less any` `deferred taxes related to the reconciliation, with` `interest at an annual rate of return equal to the utility's` `weighted average cost of capital as calculated under` `paragraph (1) of this subsection (h), including a revenue` `conversion factor calculated to recover or refund all` `additional income taxes that may be payable or receivable` `as a result of that return, of the revenue requirement` `reflected in rates for each calendar year, beginning with` `the calendar year in which the utility files its automatic` `adjustment clause tariff under this subsection (h), with` `what the revenue requirement would have been had the actual` `cost information for the applicable calendar year been` `available at the filing date. The Commission shall review` `the proposed tariff and may make changes to the tariff that` `are consistent with this Section and with the Commission's` `authority under Article IX of this Act, subject to notice` `and hearing. Following notice and hearing, the Commission` `shall issue an order approving, or approving with` `modification, such tariff no later than 240 days after the` `utility files its tariff.` (i) No later than 90 days after the Commission enters an` `order, or order on rehearing, whichever is later, approving an` `electric utility's proposed tariff under subsection (d) of this` `Section, the electric utility shall provide notice of the` `availability of rebates under this Section. Subsequent to the` `utility's notice, any entity that offers in the State, for sale` `or lease, distributed generation and estimates the dollar` `saving attributable to such distributed generation shall` `provide estimates based on both delivery service credits and` `the rebates available under this Section.` (220 ILCS 5/16-108) ` Sec. 16-108.``Recovery of costs associated with the` `provision of delivery``and other``services.` (a) An electric utility shall file a delivery services` `tariff with the Commission at least 210 days prior to the date` `that it is required to begin offering such services pursuant to` `this Act. An electric utility shall provide the components of` `delivery services that are subject to the jurisdiction of the` `Federal Energy Regulatory Commission at the same prices, terms` `and conditions set forth in its applicable tariff as approved` `or allowed into effect by that Commission. The Commission shall` `otherwise have the authority pursuant to Article IX to review,` `approve, and modify the prices, terms and conditions of those` `components of delivery services not subject to the jurisdiction` `of the Federal Energy Regulatory Commission, including the` `authority to determine the extent to which such delivery` `services should be offered on an unbundled basis. In making any` `such determination the Commission shall consider, at a minimum,` `the effect of additional unbundling on (i) the objective of` `just and reasonable rates, (ii) electric utility employees, and` `(iii) the development of competitive markets for electric` `energy services in Illinois. (b) The Commission shall enter an order approving, or` `approving as modified, the delivery services tariff no later` `than 30 days prior to the date on which the electric utility` `must commence offering such services. The Commission may` `subsequently modify such tariff pursuant to this Act. (c) The electric utility's tariffs shall define the classes` `of its customers for purposes of delivery services charges.` `Delivery services shall be priced and made available to all` `retail customers electing delivery services in each such class` `on a nondiscriminatory basis regardless of whether the retail` `customer chooses the electric utility, an affiliate of the` `electric utility, or another entity as its supplier of electric` `power and energy. Charges for delivery services shall be cost` `based, and shall allow the electric utility to recover the` `costs of providing delivery services through its charges to its` `delivery service customers that use the facilities and services` `associated with such costs. Such costs shall include the costs` `of owning, operating and maintaining transmission and` `distribution facilities. The Commission shall also be` `authorized to consider whether, and if so to what extent, the` `following costs are appropriately included in the electric` `utility's delivery services rates: (i) the costs of that` `portion of generation facilities used for the production and` `absorption of reactive power in order that retail customers` `located in the electric utility's service area can receive` `electric power and energy from suppliers other than the` `electric utility, and (ii) the costs associated with the use` `and redispatch of generation facilities to mitigate` `constraints on the transmission or distribution system in order` `that retail customers located in the electric utility's service` `area can receive electric power and energy from suppliers other` `than the electric utility. Nothing in this subsection shall be` `construed as directing the Commission to allocate any of the` `costs described in (i) or (ii) that are found to be` `appropriately included in the electric utility's delivery` `services rates to any particular customer group or geographic` `area in setting delivery services rates. (d) The Commission shall establish charges, terms and` `conditions for delivery services that are just and reasonable` `and shall take into account customer impacts when establishing` `such charges. In establishing charges, terms and conditions for` `delivery services, the Commission shall take into account` `voltage level differences. A retail customer shall have the` `option to request to purchase electric service at any delivery` `service voltage reasonably and technically feasible from the` `electric facilities serving that customer's premises provided` `that there are no significant adverse impacts upon system` `reliability or system efficiency. A retail customer shall also` `have the option to request to purchase electric service at any` `point of delivery that is reasonably and technically feasible` `provided that there are no significant adverse impacts on` `system reliability or efficiency. Such requests shall not be` `unreasonably denied. (e) Electric utilities shall recover the costs of` `installing, operating or maintaining facilities for the` `particular benefit of one or more delivery services customers,` `including without limitation any costs incurred in complying` `with a customer's request to be served at a different voltage` `level, directly from the retail customer or customers for whose` `benefit the costs were incurred, to the extent such costs are` `not recovered through the charges referred to in subsections` `(c) and (d) of this Section. (f) An electric utility shall be entitled but not required` `to implement transition charges in conjunction with the` `offering of delivery services pursuant to Section 16-104. If an` `electric utility implements transition charges, it shall` `implement such charges for all delivery services customers and` `for all customers described in subsection (h), but shall not` `implement transition charges for power and energy that a retail` `customer takes from cogeneration or self-generation facilities` `located on that retail customer's premises, if such facilities` `meet the following criteria: `` ``(i) the cogeneration or self-generation facilities` `serve a single retail customer and are located on that` `retail customer's premises (for purposes of this` `subparagraph and subparagraph (ii), an industrial or` `manufacturing retail customer and a third party contractor` `that is served by such industrial or manufacturing customer` `through such retail customer's own electrical distribution` `facilities under the circumstances described in subsection` `(vi) of the definition of "alternative retail electric` `supplier" set forth in Section 16-102, shall be considered` `a single retail customer); `` ``(ii) the cogeneration or self-generation facilities` `either (A) are sized pursuant to generally accepted` `engineering standards for the retail customer's electrical` `load at that premises (taking into account standby or other` `reliability considerations related to that retail` `customer's operations at that site) or (B) if the facility` `is a cogeneration facility located on the retail customer's` `premises, the retail customer is the thermal host for that` `facility and the facility has been designed to meet that` `retail customer's thermal energy requirements resulting in` `electrical output beyond that retail customer's electrical` `demand at that premises, comply with the operating and` `efficiency standards applicable to "qualifying facilities"` `specified in title 18 Code of Federal Regulations Section` `292.205 as in effect on the effective date of this` `amendatory Act of 1999; `` ``(iii) the retail customer on whose premises the` `facilities are located either has an exclusive right to` `receive, and corresponding obligation to pay for, all of` `the electrical capacity of the facility, or in the case of` `a cogeneration facility that has been designed to meet the` `retail customer's thermal energy requirements at that` `premises, an identified amount of the electrical capacity` `of the facility, over a minimum 5-year period; and `` ``(iv) if the cogeneration facility is sized for the` `retail customer's thermal load at that premises but exceeds` `the electrical load, any sales of excess power or energy` `are made only at wholesale, are subject to the jurisdiction` `of the Federal Energy Regulatory Commission, and are not` `for the purpose of circumventing the provisions of this` `subsection (f). `If a generation facility located at a retail customer's` `premises does not meet the above criteria, an electric utility` `implementing transition charges shall implement a transition` `charge until December 31, 2006 for any power and energy taken` `by such retail customer from such facility as if such power and` `energy had been delivered by the electric utility. Provided,` `however, that an industrial retail customer that is taking` `power from a generation facility that does not meet the above` `criteria but that is located on such customer's premises will` `not be subject to a transition charge for the power and energy` `taken by such retail customer from such generation facility if` `the facility does not serve any other retail customer and` `either was installed on behalf of the customer and for its own` `use prior to January 1, 1997, or is both predominantly fueled` `by byproducts of such customer's manufacturing process at such` `premises and sells or offers an average of 300 megawatts or` `more of electricity produced from such generation facility into` `the wholesale market. Such charges shall be calculated as` `provided in Section 16-102, and shall be collected on each` `kilowatt-hour delivered under a delivery services tariff to a` `retail customer from the date the customer first takes delivery` `services until December 31, 2006 except as provided in` `subsection (h) of this Section. Provided, however, that an` `electric utility, other than an electric utility providing` `service to at least 1,000,000 customers in this State on` `January 1, 1999, shall be entitled to petition for entry of an` `order by the Commission authorizing the electric utility to` `implement transition charges for an additional period ending no` `later than December 31, 2008. The electric utility shall file` `its petition with supporting evidence no earlier than 16` `months, and no later than 12 months, prior to December 31,` `2006. The Commission shall hold a hearing on the electric` `utility's petition and shall enter its order no later than 8` `months after the petition is filed. The Commission shall` `determine whether and to what extent the electric utility shall` `be authorized to implement transition charges for an additional` `period. The Commission may authorize the electric utility to` `implement transition charges for some or all of the additional` `period, and shall determine the mitigation factors to be used` `in implementing such transition charges; provided, that the` `Commission shall not authorize mitigation factors less than` `110% of those in effect during the 12 months ended December 31,` `2006. In making its determination, the Commission shall` `consider the following factors: the necessity to implement` `transition charges for an additional period in order to` `maintain the financial integrity of the electric utility; the` `prudence of the electric utility's actions in reducing its` `costs since the effective date of this amendatory Act of 1997;` `the ability of the electric utility to provide safe, adequate` `and reliable service to retail customers in its service area;` `and the impact on competition of allowing the electric utility` `to implement transition charges for the additional period. (g) The electric utility shall file tariffs that establish` `the transition charges to be paid by each class of customers to` `the electric utility in conjunction with the provision of` `delivery services. The electric utility's tariffs shall define` `the classes of its customers for purposes of calculating` `transition charges. The electric utility's tariffs shall` `provide for the calculation of transition charges on a` `customer-specific basis for any retail customer whose average` `monthly maximum electrical demand on the electric utility's` `system during the 6 months with the customer's highest monthly` `maximum electrical demands equals or exceeds 3.0 megawatts for` `electric utilities having more than 1,000,000 customers, and` `for other electric utilities for any customer that has an` `average monthly maximum electrical demand on the electric` `utility's system of one megawatt or more, and (A) for which` `there exists data on the customer's usage during the 3 years` `preceding the date that the customer became eligible to take` `delivery services, or (B) for which there does not exist data` `on the customer's usage during the 3 years preceding the date` `that the customer became eligible to take delivery services, if` `in the electric utility's reasonable judgment there exists` `comparable usage information or a sufficient basis to develop` `such information, and further provided that the electric` `utility can require customers for which an individual` `calculation is made to sign contracts that set forth the` `transition charges to be paid by the customer to the electric` `utility pursuant to the tariff. (h) An electric utility shall also be entitled to file` `tariffs that allow it to collect transition charges from retail` `customers in the electric utility's service area that do not` `take delivery services but that take electric power or energy` `from an alternative retail electric supplier or from an` `electric utility other than the electric utility in whose` `service area the customer is located. Such charges shall be` `calculated, in accordance with the definition of transition` `charges in Section 16-102, for the period of time that the` `customer would be obligated to pay transition charges if it` `were taking delivery services, except that no deduction for` `delivery services revenues shall be made in such calculation,` `and usage data from the customer's class shall be used where` `historical usage data is not available for the individual` `customer. The customer shall be obligated to pay such charges` `on a lump sum basis on or before the date on which the customer` `commences to take service from the alternative retail electric` `supplier or other electric utility, provided, that the electric` `utility in whose service area the customer is located shall` `offer the customer the option of signing a contract pursuant to` `which the customer pays such charges ratably over the period in` `which the charges would otherwise have applied. (i) An electric utility shall be entitled to add to the` `bills of delivery services customers charges pursuant to` `Sections 9-221, 9-222 (except as provided in Section 9-222.1),` `and Section 16-114 of this Act, Section 5-5 of the Electricity` `Infrastructure Maintenance Fee Law, Section 6-5 of the` `Renewable Energy, Energy Efficiency, and Coal Resources` `Development Law of 1997, and Section 13 of the Energy` `Assistance Act. (j) If a retail customer that obtains electric power and` `energy from cogeneration or self-generation facilities` `installed for its own use on or before January 1, 1997,` `subsequently takes service from an alternative retail electric` `supplier or an electric utility other than the electric utility` `in whose service area the customer is located for any portion` `of the customer's electric power and energy requirements` `formerly obtained from those facilities (including that amount` `purchased from the utility in lieu of such generation and not` `as standby power purchases, under a cogeneration displacement` `tariff in effect as of the effective date of this amendatory` `Act of 1997), the transition charges otherwise applicable` `pursuant to subsections (f), (g), or (h) of this Section shall` `not be applicable in any year to that portion of the customer's` `electric power and energy requirements formerly obtained from` `those facilities, provided, that for purposes of this` `subsection (j), such portion shall not exceed the average` `number of kilowatt-hours per year obtained from the` `cogeneration or self-generation facilities during the 3 years` `prior to the date on which the customer became eligible for` `delivery services, except as provided in subsection (f) of` `Section 16-110. (k) The electric utility shall be entitled to recover` `through tariffed charges all of the costs associated with the` `purchase of zero emission credits from zero emission facilities` `to meet the requirements of subsection (d-5) of Section 1-75 of` `the Illinois Power Agency Act. Such costs shall include the` `costs of procuring the zero emission credits, as well as the` `reasonable costs that the utility incurs as part of the` `procurement processes and to implement and comply with plans` `and processes approved by the Commission under such subsection` `(d-5). The costs shall be allocated across all retail customers` `through a single, uniform cents per kilowatt-hour charge` `applicable to all retail customers, which shall appear as a` `separate line item on each customer's bill. Beginning June 1,` `2017, the electric utility shall be entitled to recover through` `tariffed charges all of the costs associated with the purchase` `of renewable energy resources to meet the renewable energy` `resource standards of subsection (c) of Section 1-75 of the` `Illinois Power Agency Act, under procurement plans as approved` `in accordance with that Section and Section 16-111.5 of this` `Act. Such costs shall include the costs of procuring the` `renewable energy resources, as well as the reasonable costs` `that the utility incurs as part of the procurement processes` `and to implement and comply with plans and processes approved` `by the Commission under such Sections. The costs associated` `with the purchase of renewable energy resources shall be` `allocated across all retail customers in proportion to the` `amount of renewable energy resources the utility procures for` `such customers through a single, uniform cents per` `kilowatt-hour charge applicable to such retail customers,` `which shall appear as a separate line item on each such` `customer's bill.` Notwithstanding whether the Commission has approved the` `initial long-term renewable resources procurement plan as of` `June 1, 2017, an electric utility shall place new tariffed` `charges into effect beginning with the June 2017 monthly` `billing period, to the extent practicable, to begin recovering` `the costs of procuring renewable energy resources, as those` `charges are calculated under the limitations described in` `subparagraph (E) of paragraph (1) of subsection (c) of Section` `1-75 of the Illinois Power Agency Act. Notwithstanding the date` `on which the utility places such new tariffed charges into` `effect, the utility shall be permitted to collect the charges` `under such tariff as if the tariff had been in effect beginning` `with the first day of the June 2017 monthly billing period. For` `the delivery years commencing June 1, 2017, June 1, 2018, and` `June 1, 2019, the electric utility shall deposit into a` `separate interest bearing account of a financial institution` `the monies collected under the tariffed charges. Any interest` `earned shall be credited back to retail customers under the` `reconciliation proceeding provided for in this subsection (k),` `provided that the electric utility shall first be reimbursed` `from the interest for the administrative costs that it incurs` `to administer and manage the account. Any taxes due on the` `funds in the account, or interest earned on it, will be paid` `from the account or, if insufficient monies are available in` `the account, from the monies collected under the tariffed` `charges to recover the costs of procuring renewable energy` `resources. Monies deposited in the account shall be subject to` `the review, reconciliation, and true-up process described in` `this subsection (k) that is applicable to the funds collected` `and costs incurred for the procurement of renewable energy` `resources.` The electric utility shall be entitled to recover all of` `the costs identified in this subsection (k) through automatic` `adjustment clause tariffs applicable to all of the utility's` `retail customers that allow the electric utility to adjust its` `tariffed charges consistent with this subsection (k). The` `determination as to whether any excess funds were collected` `during a given delivery year for the purchase of renewable` `energy resources, and the crediting of any excess funds back to` `retail customers, shall not be made until after the close of` `the delivery year, which will ensure that the maximum amount of` `funds is available to implement the approved long-term` `renewable resources procurement plan during a given delivery` `year. The electric utility's collections under such automatic` `adjustment clause tariffs to recover the costs of renewable` `energy resources and zero emission credits from zero emission` `facilities shall be subject to separate annual review,` `reconciliation, and true-up against actual costs by the` `Commission under a procedure that shall be specified in the` `electric utility's automatic adjustment clause tariffs and` `that shall be approved by the Commission in connection with its` `approval of such tariffs. The procedure shall provide that any` `difference between the electric utility's collections under` `the automatic adjustment charges for an annual period and the` `electric utility's actual costs of renewable energy resources` `and zero emission credits from zero emission facilities for` `that same annual period shall be refunded to or collected from,` `as applicable, the electric utility's retail customers in` `subsequent periods.` Nothing in this subsection (k) is intended to affect,` `limit, or change the right of the electric utility to recover` `the costs associated with the procurement of renewable energy` `resources for periods commencing before, on, or after June 1,` `2017, as otherwise provided in the Illinois Power Agency Act. Notwithstanding anything to the contrary, the Commission` `shall not conduct an annual review, reconciliation, and true-up` `associated with renewable energy resources' collections and` `costs for the delivery years commencing June 1, 2017, June 1,` `2018, June 1, 2019, and June 1, 2020, and shall instead conduct` `a single review, reconciliation, and true-up associated with` `renewable energy resources' collections and costs for the` `4-year period beginning June 1, 2017 and ending May 31, 2021,` `provided that the review, reconciliation, and true-up shall not` `be initiated until after August 31, 2021. During the 4-year` `period, the utility shall be permitted to collect and retain` `funds under this subsection (k) and to purchase renewable` `energy resources under an approved long-term renewable` `resources procurement plan using those funds regardless of the` `delivery year in which the funds were collected during the` `4-year period.` If the amount of funds collected during the delivery year` `commencing June 1, 2017, exceeds the costs incurred during that` `delivery year, then up to half of this excess amount, as` `calculated on June 1, 2018, may be used to fund the programs` `under subsection (b) of Section 1-56 of the Illinois Power` `Agency Act in the same proportion the programs are funded under` `that subsection (b). However, any amount identified under this` `subsection (k) to fund programs under subsection (b) of Section` `1-56 of the Illinois Power Agency Act shall be reduced if it` `exceeds the funding shortfall. For purposes of this Section,` `"funding shortfall" means the difference between $200,000,000` `and the amount appropriated by the General Assembly to the` `Illinois Power Agency Renewable Energy Resources Fund during` `the period that commences on the effective date of this` `amendatory act of the 99th General Assembly and ends on August` `1, 2018. If the amount of funds collected during the delivery year` `commencing June 1, 2018, exceeds the costs incurred during that` `delivery year, then up to half of this excess amount, as` `calculated on June 1, 2019, may be used to fund the programs` `under subsection (b) of Section 1-56 of the Illinois Power` `Agency Act in the same proportion the programs are funded under` `that subsection (b). However, any amount identified under this` `subsection (k) to fund programs under subsection (b) of Section` `1-56 of the Illinois Power Agency Act shall be reduced if it` `exceeds the funding shortfall. If the amount of funds collected during the delivery year` `commencing June 1, 2019, exceeds the costs incurred during that` `delivery year, then up to half of this excess amount, as` `calculated on June 1, 2020, may be used to fund the programs` `under subsection (b) of Section 1-56 of the Illinois Power` `Agency Act in the same proportion the programs are funded under` `that subsection (b). However, any amount identified under this` `subsection (k) to fund programs under subsection (b) of Section` `1-56 of the Illinois Power Agency Act shall be reduced if it` `exceeds the funding shortfall. The funding available under this subsection (k), if any,` `for the programs described under subsection (b) of Section 1-56` `of the Illinois Power Agency Act shall not reduce the amount of` `funding for the programs described in subparagraph (O) of` `paragraph (1) of subsection (c) of Section 1-75 of the Illinois` `Power Agency Act. If funding is available under this subsection` `(k) for programs described under subsection (b) of Section 1-56` `of the Illinois Power Agency Act, then the long-term renewable` `resources plan shall provide for the Agency to procure` `contracts in an amount that does not exceed the funding, and` `the contracts approved by the Commission shall be executed by` `the applicable utility or utilities. (l) A utility that has terminated any contract executed` `under subsection (d-5) of Section 1-75 of the Illinois Power` `Agency Act shall be entitled to recover any remaining balance` `associated with the purchase of zero emission credits prior to` `such termination, and such utility shall also apply a credit to` `its retail customer bills in the event of any over-collection. ``(m)(1) An electric utility that recovers its costs of` `procuring zero emission credits from zero emission` `facilities through a cents-per-kilowatthour charge under` `to subsection (k) of this Section shall be subject to the` `requirements of this subsection (m). Notwithstanding` `anything to the contrary, such electric utility shall,` `beginning on April 30, 2018, and each April 30 thereafter` `until April 30, 2026, calculate whether any reduction must` `be applied to such cents-per-kilowatthour charge that is` `paid by retail customers of the electric utility that are` `exempt from subsections (a) through (j) of Section 8-103B` `of this Act under subsection (l) of Section 8-103B. Such` `charge shall be reduced for such customers for the next` `delivery year commencing on June 1 based on the amount` `necessary, if any, to limit the annual estimated average` `net increase for the prior calendar year due to the future` `energy investment costs to no more than 1.3% of 5.98 cents` `per kilowatt-hour, which is the average amount paid per` `kilowatthour for electric service during the year ending` `December 31, 2015 by Illinois industrial retail customers,` `as reported to the Edison Electric Institute. ``The calculations required by this subsection (m) shall` `be made only once for each year, and no subsequent rate` `impact determinations shall be made. ``(2) For purposes of this Section, "future energy` `investment costs" shall be calculated by subtracting the` `cents-per-kilowatthour charge identified in subparagraph` `(A) of this paragraph (2) from the sum of the` `cents-per-kilowatthour charges identified in subparagraph` `(B) of this paragraph (2): `(A) The cents-per-kilowatthour charge identified` `in the electric utility's tariff placed into effect` `under Section 8-103 of the Public Utilities Act that,` `on December 1, 2016, was applicable to those retail` `customers that are exempt from subsections (a) through` `(j) of Section 8-103B of this Act under subsection (l)` `of Section 8-103B. `(B) The sum of the following` `cents-per-kilowatthour charges applicable to those` `retail customers that are exempt from subsections (a)` `through (j) of Section 8-103B of this Act under` `subsection (l) of Section 8-103B, provided that if one` `or more of the following charges has been in effect and` `applied to such customers for more than one calendar` `year, then each charge shall be equal to the average of` `the charges applied over a period that commences with` `the calendar year ending December 31, 2017 and ends` `with the most recently completed calendar year prior to` `the calculation required by this subsection (m): (i) the cents-per-kilowatthour charge to` `recover the costs incurred by the utility under` `subsection (d-5) of Section 1-75 of the Illinois` `Power Agency Act, adjusted for any reductions` `required under this subsection (m); and` (ii) the cents-per-kilowatthour charge to` `recover the costs incurred by the utility under` `Section 16-107.6 of the Public Utilities Act. `If no charge was applied for a given calendar year` `under item (i) or (ii) of this subparagraph (B), then` `the value of the charge for that year shall be zero. ``(3) If a reduction is required by the calculation` `performed under this subsection (m), then the amount of the` `reduction shall be multiplied by the number of years` `reflected in the averages calculated under subparagraph` `(B) of paragraph (2) of this subsection (m). Such reduction` `shall be applied to the cents-per-kilowatthour charge that` `is applicable to those retail customers that are exempt` `from subsections (a) through (j) of Section 8-103B of this` `Act under subsection (l) of Section 8-103B beginning with` `the next delivery year commencing after the date of the` `calculation required by this subsection (m). ``(4) The electric utility shall file a notice with the` `Commission on May 1 of 2018 and each May 1 thereafter until` `May 1, 2026 containing the reduction, if any, which must be` `applied for the delivery year which begins in the year of` `the filing. The notice shall contain the calculations made` `pursuant to this section. By October 1 of each year` `beginning in 2018, each electric utility shall notify the` `Commission if it appears, based on an estimate of the` `calculation required in this subsection (m), that a` `reduction will be required in the next year. `(Source: P.A. 91-50, eff. 6-30-99; 92-690, eff. 7-18-02.) (220 ILCS 5/16-108.5)` Sec. 16-108.5.``Infrastructure investment and` `modernization; regulatory reform.` (a) (Blank).` (b) For purposes of this Section, "participating utility"` `means an electric utility or a combination utility serving more` `than 1,000,000 customers in Illinois that voluntarily elects` `and commits to undertake (i) the infrastructure investment` `program consisting of the commitments and obligations` `described in this subsection (b) and (ii) the customer` `assistance program consisting of the commitments and` `obligations described in subsection (b-10) of this Section,` `notwithstanding any other provisions of this Act and without` `obtaining any approvals from the Commission or any other agency` `other than as set forth in this Section, regardless of whether` `any such approval would otherwise be required. "Combination` `utility" means a utility that, as of January 1, 2011, provided` `electric service to at least one million retail customers in` `Illinois and gas service to at least 500,000 retail customers` `in Illinois. A participating utility shall recover the` `expenditures made under the infrastructure investment program` `through the ratemaking process, including, but not limited to,` `the performance-based formula rate and process set forth in` `this Section.` During the infrastructure investment program's peak` `program year, a participating utility other than a combination` `utility shall create 2,000 full-time equivalent jobs in` `Illinois, and a participating utility that is a combination` `utility shall create 450 full-time equivalent jobs in Illinois` `related to the provision of electric service. These jobs shall` `include direct jobs, contractor positions, and induced jobs,` `but shall not include any portion of a job commitment, not` `specifically contingent on an amendatory Act of the 97th` `General Assembly becoming law, between a participating utility` `and a labor union that existed on December 30, 2011 (the` `effective date of Public Act 97-646) and that has not yet been` `fulfilled. A portion of the full-time equivalent jobs created` `by each participating utility shall include incremental` `personnel hired subsequent to December 30, 2011 (the effective` `date of Public Act 97-646). For purposes of this Section, "peak` `program year" means the consecutive 12-month period with the` `highest number of full-time equivalent jobs that occurs between` `the beginning of investment year 2 and the end of investment` `year 4.` A participating utility shall meet one of the following` `commitments, as applicable:` ``(1) Beginning no later than 180 days after a` `participating utility other than a combination utility` `files a performance-based formula rate tariff pursuant to` `subsection (c) of this Section, or, beginning no later than` `January 1, 2012 if such utility files such` `performance-based formula rate tariff within 14 days of` `October 26, 2011 (the effective date of Public Act 97-616),` `the participating utility shall, except as provided in` `subsection (b-5):` `(A) over a 5-year period, invest an estimated` `$1,300,000,000 in electric system upgrades,` `modernization projects, and training facilities,` `including, but not limited to:` (i) distribution infrastructure improvements` `totaling an estimated $1,000,000,000, including` `underground residential distribution cable` `injection and replacement and mainline cable` `system refurbishment and replacement projects;` (ii) training facility construction or upgrade` `projects totaling an estimated $10,000,000,` `provided that, at a minimum, one such facility` `shall be located in a municipality having a` `population of more than 2 million residents and one` `such facility shall be located in a municipality` `having a population of more than 150,000 residents` `but fewer than 170,000 residents; any such new` `facility located in a municipality having a` `population of more than 2 million residents must be` `designed for the purpose of obtaining, and the` `owner of the facility shall apply for,` `certification under the United States Green` `Building Council's Leadership in Energy Efficiency` `Design Green Building Rating System;` (iii) wood pole inspection, treatment, and` `replacement programs;` (iv) an estimated $200,000,000 for reducing` `the susceptibility of certain circuits to` `storm-related damage, including, but not limited` `to, high winds, thunderstorms, and ice storms;` `improvements may include, but are not limited to,` `overhead to underground conversion and other` `engineered outcomes for circuits; the` `participating utility shall prioritize the` `selection of circuits based on each circuit's` `historical susceptibility to storm-related damage` `and the ability to provide the greatest customer` `benefit upon completion of the improvements; to be` `eligible for improvement, the participating` `utility's ability to maintain proper tree` `clearances surrounding the overhead circuit must` `not have been impeded by third parties; and` `(B) over a 10-year period, invest an estimated` `$1,300,000,000 to upgrade and modernize its` `transmission and distribution infrastructure and in` `Smart Grid electric system upgrades, including, but` `not limited to:` (i) additional smart meters;` (ii) distribution automation;` (iii) associated cyber secure data` `communication network; and` (iv) substation micro-processor relay` `upgrades.` ``(2) Beginning no later than 180 days after a` `participating utility that is a combination utility files a` `performance-based formula rate tariff pursuant to` `subsection (c) of this Section, or, beginning no later than` `January 1, 2012 if such utility files such` `performance-based formula rate tariff within 14 days of` `October 26, 2011 (the effective date of Public Act 97-616),` `the participating utility shall, except as provided in` `subsection (b-5):` `(A) over a 10-year period, invest an estimated` `$265,000,000 in electric system upgrades,` `modernization projects, and training facilities,` `including, but not limited to:` (i) distribution infrastructure improvements` `totaling an estimated $245,000,000, which may` `include bulk supply substations, transformers,` `reconductoring, and rebuilding overhead` `distribution and sub-transmission lines,` `underground residential distribution cable` `injection and replacement and mainline cable` `system refurbishment and replacement projects;` (ii) training facility construction or upgrade` `projects totaling an estimated $1,000,000; any` `such new facility must be designed for the purpose` `of obtaining, and the owner of the facility shall` `apply for, certification under the United States` `Green Building Council's Leadership in Energy` `Efficiency Design Green Building Rating System;` `and` (iii) wood pole inspection, treatment, and` `replacement programs; and` `(B) over a 10-year period, invest an estimated` `$360,000,000 to upgrade and modernize its transmission` `and distribution infrastructure and in Smart Grid` `electric system upgrades, including, but not limited` `to:` (i) additional smart meters;` (ii) distribution automation;` (iii) associated cyber secure data` `communication network; and` (iv) substation micro-processor relay` `upgrades.` For purposes of this Section, "Smart Grid electric system` `upgrades" shall have the meaning set forth in subsection (a) of` `Section 16-108.6 of this Act.` The investments in the infrastructure investment program` `described in this subsection (b) shall be incremental to the` `participating utility's annual capital investment program, as` `defined by, for purposes of this subsection (b), the` `participating utility's average capital spend for calendar` `years 2008, 2009, and 2010 as reported in the applicable` `Federal Energy Regulatory Commission (FERC) Form 1; provided` `that where one or more utilities have merged, the average` `capital spend shall be determined using the aggregate of the` `merged utilities' capital spend reported in FERC Form 1 for the` `years 2008, 2009, and 2010. A participating utility may add` `reasonable construction ramp-up and ramp-down time to the` `investment periods specified in this subsection (b). For each` `such investment period, the ramp-up and ramp-down time shall` `not exceed a total of 6 months.` Within 60 days after filing a tariff under subsection (c)` `of this Section, a participating utility shall submit to the` `Commission its plan, including scope, schedule, and staffing,` `for satisfying its infrastructure investment program` `commitments pursuant to this subsection (b). The submitted plan` `shall include a schedule and staffing plan for the next` `calendar year. The plan shall also include a plan for the` `creation, operation, and administration of a Smart Grid test` `bed as described in subsection (c) of Section 16-108.8. The` `plan need not allocate the work equally over the respective` `periods, but should allocate material increments throughout` `such periods commensurate with the work to be undertaken. No` `later than April 1 of each subsequent year, the utility shall` `submit to the Commission a report that includes any updates to` `the plan, a schedule for the next calendar year, the` `expenditures made for the prior calendar year and cumulatively,` `and the number of full-time equivalent jobs created for the` `prior calendar year and cumulatively. If the utility is` `materially deficient in satisfying a schedule or staffing plan,` `then the report must also include a corrective action plan to` `address the deficiency. The fact that the plan, implementation` `of the plan, or a schedule changes shall not imply the` `imprudence or unreasonableness of the infrastructure` `investment program, plan, or schedule. Further, no later than` `45 days following the last day of the first, second, and third` `quarters of each year of the plan, a participating utility` `shall submit to the Commission a verified quarterly report for` `the prior quarter that includes (i) the total number of` `full-time equivalent jobs created during the prior quarter,` `(ii) the total number of employees as of the last day of the` `prior quarter, (iii) the total number of full-time equivalent` `hours in each job classification or job title, (iv) the total` `number of incremental employees and contractors in support of` `the investments undertaken pursuant to this subsection (b) for` `the prior quarter, and (v) any other information that the` `Commission may require by rule.` With respect to the participating utility's peak job` `commitment, if, after considering the utility's corrective` `action plan and compliance thereunder, the Commission enters an` `order finding, after notice and hearing, that a participating` `utility did not satisfy its peak job commitment described in` `this subsection (b) for reasons that are reasonably within its` `control, then the Commission shall also determine, after` `consideration of the evidence, including, but not limited to,` `evidence submitted by the Department of Commerce and Economic` `Opportunity and the utility, the deficiency in the number of` `full-time equivalent jobs during the peak program year due to` `such failure. The Commission shall notify the Department of any` `proceeding that is initiated pursuant to this paragraph. For` `each full-time equivalent job deficiency during the peak` `program year that the Commission finds as set forth in this` `paragraph, the participating utility shall, within 30 days` `after the entry of the Commission's order, pay $6,000 to a fund` `for training grants administered under Section 605-800 of the` `Department of Commerce and Economic Opportunity Law, which` `shall not be a recoverable expense.` With respect to the participating utility's investment` `amount commitments, if, after considering the utility's` `corrective action plan and compliance thereunder, the` `Commission enters an order finding, after notice and hearing,` `that a participating utility is not satisfying its investment` `amount commitments described in this subsection (b), then the` `utility shall no longer be eligible to annually update the` `performance-based formula rate tariff pursuant to subsection` `(d) of this Section. In such event, the then current rates` `shall remain in effect until such time as new rates are set` `pursuant to Article IX of this Act, subject to retroactive` `adjustment, with interest, to reconcile rates charged with` `actual costs.` If the Commission finds that a participating utility is no` `longer eligible to update the performance-based formula rate` `tariff pursuant to subsection (d) of this Section, or the` `performance-based formula rate is otherwise terminated, then` `the participating utility's voluntary commitments and` `obligations under this subsection (b) shall immediately` `terminate, except for the utility's obligation to pay an amount` `already owed to the fund for training grants pursuant to a` `Commission order.` In meeting the obligations of this subsection (b), to the` `extent feasible and consistent with State and federal law, the` `investments under the infrastructure investment program should` `provide employment opportunities for all segments of the` `population and workforce, including minority-owned and` `female-owned business enterprises, and shall not, consistent` `with State and federal law, discriminate based on race or` `socioeconomic status.` (b-5) Nothing in this Section shall prohibit the Commission` `from investigating the prudence and reasonableness of the` `expenditures made under the infrastructure investment program` `during the annual review required by subsection (d) of this` `Section and shall, as part of such investigation, determine` `whether the utility's actual costs under the program are` `prudent and reasonable. The fact that a participating utility` `invests more than the minimum amounts specified in subsection` `(b) of this Section or its plan shall not imply imprudence or` `unreasonableness.` If the participating utility finds that it is implementing` `its plan for satisfying the infrastructure investment program` `commitments described in subsection (b) of this Section at a` `cost below the estimated amounts specified in subsection (b) of` `this Section, then the utility may file a petition with the` `Commission requesting that it be permitted to satisfy its` `commitments by spending less than the estimated amounts` `specified in subsection (b) of this Section. The Commission` `shall, after notice and hearing, enter its order approving, or` `approving as modified, or denying each such petition within 150` `days after the filing of the petition.` In no event, absent General Assembly approval, shall the` `capital investment costs incurred by a participating utility` `other than a combination utility in satisfying its` `infrastructure investment program commitments described in` `subsection (b) of this Section exceed $3,000,000,000 or, for a` `participating utility that is a combination utility,` `$720,000,000. If the participating utility's updated cost` `estimates for satisfying its infrastructure investment program` `commitments described in subsection (b) of this Section exceed` `the limitation imposed by this subsection (b-5), then it shall` `submit a report to the Commission that identifies the increased` `costs and explains the reason or reasons for the increased` `costs no later than the year in which the utility estimates it` `will exceed the limitation. The Commission shall review the` `report and shall, within 90 days after the participating` `utility files the report, report to the General Assembly its` `findings regarding the participating utility's report. If the` `General Assembly does not amend the limitation imposed by this` `subsection (b-5), then the utility may modify its plan so as` `not to exceed the limitation imposed by this subsection (b-5)` `and may propose corresponding changes to the metrics` `established pursuant to subparagraphs (5) through (8) of` `subsection (f) of this Section, and the Commission may modify` `the metrics and incremental savings goals established pursuant` `to subsection (f) of this Section accordingly.` (b-10) All participating utilities shall make` `contributions for an energy low-income and support program in` `accordance with this subsection. Beginning no later than 180` `days after a participating utility files a performance-based` `formula rate tariff pursuant to subsection (c) of this Section,` `or beginning no later than January 1, 2012 if such utility` `files such performance-based formula rate tariff within 14 days` `of December 30, 2011 (the effective date of Public Act 97-646),` `and without obtaining any approvals from the Commission or any` `other agency other than as set forth in this Section,` `regardless of whether any such approval would otherwise be` `required, a participating utility other than a combination` `utility shall pay $10,000,000 per year for 5 years and a` `participating utility that is a combination utility shall pay` `$1,000,000 per year for 10 years to the energy low-income and` `support program, which is intended to fund customer assistance` `programs with the primary purpose being avoidance of imminent` `disconnection. Such programs may include:` ``(1) a residential hardship program that may partner` `with community-based organizations, including senior` `citizen organizations, and provides grants to low-income` `residential customers, including low-income senior` `citizens, who demonstrate a hardship;` ``(2) a program that provides grants and other bill` `payment concessions to veterans with disabilities who` `demonstrate a hardship and members of the armed services or` `reserve forces of the United States or members of the` `Illinois National Guard who are on active duty pursuant to` `an executive order of the President of the United States,` `an act of the Congress of the United States, or an order of` `the Governor and who demonstrate a hardship;` ``(3) a budget assistance program that provides tools and` `education to low-income senior citizens to assist them with` `obtaining information regarding energy usage and effective` `means of managing energy costs;` ``(4) a non-residential special hardship program that` `provides grants to non-residential customers such as small` `businesses and non-profit organizations that demonstrate a` `hardship, including those providing services to senior` `citizen and low-income customers; and` ``(5) a performance-based assistance program that` `provides grants to encourage residential customers to make` `on-time payments by matching a portion of the customer's` `payments or providing credits towards arrearages.` The payments made by a participating utility pursuant to` `this subsection (b-10) shall not be a recoverable expense. A` `participating utility may elect to fund either new or existing` `customer assistance programs, including, but not limited to,` `those that are administered by the utility.` Programs that use funds that are provided by a` `participating utility to reduce utility bills may be` `implemented through tariffs that are filed with and reviewed by` `the Commission. If a utility elects to file tariffs with the` `Commission to implement all or a portion of the programs, those` `tariffs shall, regardless of the date actually filed, be deemed` `accepted and approved, and shall become effective on December` `30, 2011 (the effective date of Public Act 97-646). The` `participating utilities whose customers benefit from the funds` `that are disbursed as contemplated in this Section shall file` `annual reports documenting the disbursement of those funds with` `the Commission. The Commission has the authority to audit` `disbursement of the funds to ensure they were disbursed` `consistently with this Section.` If the Commission finds that a participating utility is no` `longer eligible to update the performance-based formula rate` `tariff pursuant to subsection (d) of this Section, or the` `performance-based formula rate is otherwise terminated, then` `the participating utility's voluntary commitments and` `obligations under this subsection (b-10) shall immediately` `terminate.` (c) A participating utility may elect to recover its` `delivery services costs through a performance-based formula` `rate approved by the Commission, which shall specify the cost` `components that form the basis of the rate charged to customers` `with sufficient specificity to operate in a standardized manner` `and be updated annually with transparent information that` `reflects the utility's actual costs to be recovered during the` `applicable rate year, which is the period beginning with the` `first billing day of January and extending through the last` `billing day of the following December. In the event the utility` `recovers a portion of its costs through automatic adjustment` `clause tariffs on October 26, 2011 (the effective date of` `Public Act 97-616), the utility may elect to continue to` `recover these costs through such tariffs, but then these costs` `shall not be recovered through the performance-based formula` `rate. In the event the participating utility, prior to December` `30, 2011 (the effective date of Public Act 97-646), filed` `electric delivery services tariffs with the Commission` `pursuant to Section 9-201 of this Act that are related to the` `recovery of its electric delivery services costs that are still` `pending on December 30, 2011 (the effective date of Public Act` `97-646), the participating utility shall, at the time it files` `its performance-based formula rate tariff with the Commission,` `also file a notice of withdrawal with the Commission to` `withdraw the electric delivery services tariffs previously` `filed pursuant to Section 9-201 of this Act. Upon receipt of` `such notice, the Commission shall dismiss with prejudice any` `docket that had been initiated to investigate the electric` `delivery services tariffs filed pursuant to Section 9-201 of` `this Act, and such tariffs and the record related thereto shall` `not be the subject of any further hearing, investigation, or` `proceeding of any kind related to rates for electric delivery` `services.` The performance-based formula rate shall be implemented` `through a tariff filed with the Commission consistent with the` `provisions of this subsection (c) that shall be applicable to` `all delivery services customers. The Commission shall initiate` `and conduct an investigation of the tariff in a manner` `consistent with the provisions of this subsection (c) and the` `provisions of Article IX of this Act to the extent they do not` `conflict with this subsection (c). Except in the case where the` `Commission finds, after notice and hearing, that a` `participating utility is not satisfying its investment amount` `commitments under subsection (b) of this Section, the` `performance-based formula rate shall remain in effect at the` `discretion of the utility. The performance-based formula rate` `approved by the Commission shall do the following:` ``(1) Provide for the recovery of the utility's actual` `costs of delivery services that are prudently incurred and` `reasonable in amount consistent with Commission practice` `and law. The sole fact that a cost differs from that` `incurred in a prior calendar year or that an investment is` `different from that made in a prior calendar year shall not` `imply the imprudence or unreasonableness of that cost or` `investment.` ``(2) Reflect the utility's actual year-end capital` `structure for the applicable calendar year, excluding` `goodwill, subject to a determination of prudence and` `reasonableness consistent with Commission practice and` `law.``To enable the financing of the incremental capital` `expenditures, including regulatory assets, for electric` `utilities that serve less than 3,000,000 retail customers` `but more than 500,000 retail customers in the State, a` `participating electric utility's actual year-end capital` `structure that includes a common equity ratio, excluding` `goodwill, of up to and including 50% of the total capital` `structure shall be deemed reasonable and used to set rates. ``(3) Include a cost of equity, which shall be calculated` `as the sum of the following:` `(A) the average for the applicable calendar year of` `the monthly average yields of 30-year U.S. Treasury` `bonds published by the Board of Governors of the` `Federal Reserve System in its weekly H.15 Statistical` `Release or successor publication; and` `(B) 580 basis points.` ``At such time as the Board of Governors of the Federal` `Reserve System ceases to include the monthly average yields` `of 30-year U.S. Treasury bonds in its weekly H.15` `Statistical Release or successor publication, the monthly` `average yields of the U.S. Treasury bonds then having the` `longest duration published by the Board of Governors in its` `weekly H.15 Statistical Release or successor publication` `shall instead be used for purposes of this paragraph (3).` ``(4) Permit and set forth protocols, subject to a` `determination of prudence and reasonableness consistent` `with Commission practice and law, for the following:` `(A) recovery of incentive compensation expense` `that is based on the achievement of operational` `metrics, including metrics related to budget controls,` `outage duration and frequency, safety, customer` `service, efficiency and productivity, and` `environmental compliance. Incentive compensation` `expense that is based on net income or an affiliate's` `earnings per share shall not be recoverable under the` `performance-based formula rate;` `(B) recovery of pension and other post-employment` `benefits expense, provided that such costs are` `supported by an actuarial study;` `(C) recovery of severance costs, provided that if` `the amount is over $3,700,000 for a participating` `utility that is a combination utility or $10,000,000` `for a participating utility that serves more than 3` `million retail customers, then the full amount shall be` `amortized consistent with subparagraph (F) of this` `paragraph (4);` `(D) investment return at a rate equal to the` `utility's weighted average cost of long-term debt, on` `the pension assets as, and in the amount, reported in` `Account 186 (or in such other Account or Accounts as` `such asset may subsequently be recorded) of the` `utility's most recently filed FERC Form 1, net of` `deferred tax benefits;` `(E) recovery of the expenses related to the` `Commission proceeding under this subsection (c) to` `approve this performance-based formula rate and` `initial rates or to subsequent proceedings related to` `the formula, provided that the recovery shall be` `amortized over a 3-year period; recovery of expenses` `related to the annual Commission proceedings under` `subsection (d) of this Section to review the inputs to` `the performance-based formula rate shall be expensed` `and recovered through the performance-based formula` `rate;` `(F) amortization over a 5-year period of the full` `amount of each charge or credit that exceeds $3,700,000` `for a participating utility that is a combination` `utility or $10,000,000 for a participating utility` `that serves more than 3 million retail customers in the` `applicable calendar year and that relates to a` `workforce reduction program's severance costs, changes` `in accounting rules, changes in law, compliance with` `any Commission-initiated audit, or a single storm or` `other similar expense, provided that any unamortized` `balance shall be reflected in rate base. For purposes` `of this subparagraph (F), changes in law includes any` `enactment, repeal, or amendment in a law, ordinance,` `rule, regulation, interpretation, permit, license,` `consent, or order, including those relating to taxes,` `accounting, or to environmental matters, or in the` `interpretation or application thereof by any` `governmental authority occurring after October 26,` `2011 (the effective date of Public Act 97-616);` `(G) recovery of existing regulatory assets over` `the periods previously authorized by the Commission;` `(H) historical weather normalized billing` `determinants; and` `(I) allocation methods for common costs.` ``(5) Provide that if the participating utility's earned` `rate of return on common equity related to the provision of` `delivery services for the prior rate year (calculated using` `costs and capital structure approved by the Commission as` `provided in subparagraph (2) of this subsection (c),` `consistent with this Section, in accordance with` `Commission rules and orders, including, but not limited to,` `adjustments for goodwill, and after any Commission-ordered` `disallowances and taxes) is more than 50 basis points` `higher than the rate of return on common equity calculated` `pursuant to paragraph (3) of this subsection (c) (after` `adjusting for any penalties to the rate of return on common` `equity applied pursuant to the performance metrics` `provision of subsection (f) of this Section), then the` `participating utility shall apply a credit through the` `performance-based formula rate that reflects an amount` `equal to the value of that portion of the earned rate of` `return on common equity that is more than 50 basis points` `higher than the rate of return on common equity calculated` `pursuant to paragraph (3) of this subsection (c) (after` `adjusting for any penalties to the rate of return on common` `equity applied pursuant to the performance metrics` `provision of subsection (f) of this Section) for the prior` `rate year, adjusted for taxes. If the participating` `utility's earned rate of return on common equity related to` `the provision of delivery services for the prior rate year` `(calculated using costs and capital structure approved by` `the Commission as provided in subparagraph (2) of this` `subsection (c), consistent with this Section, in` `accordance with Commission rules and orders, including,` `but not limited to, adjustments for goodwill, and after any` `Commission-ordered disallowances and taxes) is more than` `50 basis points less than the return on common equity` `calculated pursuant to paragraph (3) of this subsection (c)` `(after adjusting for any penalties to the rate of return on` `common equity applied pursuant to the performance metrics` `provision of subsection (f) of this Section), then the` `participating utility shall apply a charge through the` `performance-based formula rate that reflects an amount` `equal to the value of that portion of the earned rate of` `return on common equity that is more than 50 basis points` `less than the rate of return on common equity calculated` `pursuant to paragraph (3) of this subsection (c) (after` `adjusting for any penalties to the rate of return on common` `equity applied pursuant to the performance metrics` `provision of subsection (f) of this Section) for the prior` `rate year, adjusted for taxes.` ``(6) Provide for an annual reconciliation, as described` `in subsection (d) of this Section, with interest, of the` `revenue requirement reflected in rates for each calendar` `year, beginning with the calendar year in which the utility` `files its performance-based formula rate tariff pursuant` `to subsection (c) of this Section, with what the revenue` `requirement would have been had the actual cost information` `for the applicable calendar year been available at the` `filing date.` The utility shall file, together with its tariff, final` `data based on its most recently filed FERC Form 1, plus` `projected plant additions and correspondingly updated` `depreciation reserve and expense for the calendar year in which` `the tariff and data are filed, that shall populate the` `performance-based formula rate and set the initial delivery` `services rates under the formula. For purposes of this Section,` `"FERC Form 1" means the Annual Report of Major Electric` `Utilities, Licensees and Others that electric utilities are` `required to file with the Federal Energy Regulatory Commission` `under the Federal Power Act, Sections 3, 4(a), 304 and 209,` `modified as necessary to be consistent with 83 Ill. Admin. Code` `Part 415 as of May 1, 2011. Nothing in this Section is intended` `to allow costs that are not otherwise recoverable to be` `recoverable by virtue of inclusion in FERC Form 1.` After the utility files its proposed performance-based` `formula rate structure and protocols and initial rates, the` `Commission shall initiate a docket to review the filing. The` `Commission shall enter an order approving, or approving as` `modified, the performance-based formula rate, including the` `initial rates, as just and reasonable within 270 days after the` `date on which the tariff was filed, or, if the tariff is filed` `within 14 days after October 26, 2011 (the effective date of` `Public Act 97-616), then by May 31, 2012. Such review shall be` `based on the same evidentiary standards, including, but not` `limited to, those concerning the prudence and reasonableness of` `the costs incurred by the utility, the Commission applies in a` `hearing to review a filing for a general increase in rates` `under Article IX of this Act. The initial rates shall take` `effect within 30 days after the Commission's order approving` `the performance-based formula rate tariff.` Until such time as the Commission approves a different rate` `design and cost allocation pursuant to subsection (e) of this` `Section, rate design and cost allocation across customer` `classes shall be consistent with the Commission's most recent` `order regarding the participating utility's request for a` `general increase in its delivery services rates.` Subsequent changes to the performance-based formula rate` `structure or protocols shall be made as set forth in Section` `9-201 of this Act, but nothing in this subsection (c) is` `intended to limit the Commission's authority under Article IX` `and other provisions of this Act to initiate an investigation` `of a participating utility's performance-based formula rate` `tariff, provided that any such changes shall be consistent with` `paragraphs (1) through (6) of this subsection (c). Any change` `ordered by the Commission shall be made at the same time new` `rates take effect following the Commission's next order` `pursuant to subsection (d) of this Section, provided that the` `new rates take effect no less than 30 days after the date on` `which the Commission issues an order adopting the change.` A participating utility that files a tariff pursuant to` `this subsection (c) must submit a one-time $200,000 filing fee` `at the time the Chief Clerk of the Commission accepts the` `filing, which shall be a recoverable expense.` In the event the performance-based formula rate is` `terminated, the then current rates shall remain in effect until` `such time as new rates are set pursuant to Article IX of this` `Act, subject to retroactive rate adjustment, with interest, to` `reconcile rates charged with actual costs. At such time that` `the performance-based formula rate is terminated, the` `participating utility's voluntary commitments and obligations` `under subsection (b) of this Section shall immediately` `terminate, except for the utility's obligation to pay an amount` `already owed to the fund for training grants pursuant to a` `Commission order issued under subsection (b) of this Section.` (d) Subsequent to the Commission's issuance of an order` `approving the utility's performance-based formula rate` `structure and protocols, and initial rates under subsection (c)` `of this Section, the utility shall file, on or before May 1 of` `each year, with the Chief Clerk of the Commission its updated` `cost inputs to the performance-based formula rate for the` `applicable rate year and the corresponding new charges. Each` `such filing shall conform to the following requirements and` `include the following information:` ``(1) The inputs to the performance-based formula rate` `for the applicable rate year shall be based on final` `historical data reflected in the utility's most recently` `filed annual FERC Form 1 plus projected plant additions and` `correspondingly updated depreciation reserve and expense` `for the calendar year in which the inputs are filed. The` `filing shall also include a reconciliation of the revenue` `requirement that was in effect for the prior rate year (as` `set by the cost inputs for the prior rate year) with the` `actual revenue requirement for the prior rate year` `(determined using a year-end rate base) that uses amounts` `reflected in the applicable FERC Form 1 that reports the` `actual costs for the prior rate year. Any over-collection` `or under-collection indicated by such reconciliation shall` `be reflected as a credit against, or recovered as an` `additional charge to, respectively, with interest` `calculated at a rate equal to the utility's weighted` `average cost of capital approved by the Commission for the` `prior rate year, the charges for the applicable rate year.` `Provided, however, that the first such reconciliation` `shall be for the calendar year in which the utility files` `its performance-based formula rate tariff pursuant to` `subsection (c) of this Section and shall reconcile (i) the` `revenue requirement or requirements established by the` `rate order or orders in effect from time to time during` `such calendar year (weighted, as applicable) with (ii) the` `revenue requirement determined using a year-end rate base` `for that calendar year calculated pursuant to the` `performance-based formula rate using (A) actual costs for` `that year as reflected in the applicable FERC Form 1, and` `(B) for the first such reconciliation only, the cost of` `equity, which shall be calculated as the sum of 590 basis` `points plus the average for the applicable calendar year of` `the monthly average yields of 30-year U.S. Treasury bonds` `published by the Board of Governors of the Federal Reserve` `System in its weekly H.15 Statistical Release or successor` `publication. The first such reconciliation is not intended` `to provide for the recovery of costs previously excluded` `from rates based on a prior Commission order finding of` `imprudence or unreasonableness. Each reconciliation shall` `be certified by the participating utility in the same` `manner that FERC Form 1 is certified. The filing shall also` `include the charge or credit, if any, resulting from the` `calculation required by paragraph (6) of subsection (c) of` `this Section.` ``Notwithstanding anything that may be to the contrary,` `the intent of the reconciliation is to ultimately reconcile` `the revenue requirement reflected in rates for each` `calendar year, beginning with the calendar year in which` `the utility files its performance-based formula rate` `tariff pursuant to subsection (c) of this Section, with` `what the revenue requirement determined using a year-end` `rate base for the applicable calendar year would have been` `had the actual cost information for the applicable calendar` `year been available at the filing date.` ``(2) The new charges shall take effect beginning on the` `first billing day of the following January billing period` `and remain in effect through the last billing day of the` `next December billing period regardless of whether the` `Commission enters upon a hearing pursuant to this` `subsection (d).` ``(3) The filing shall include relevant and necessary` `data and documentation for the applicable rate year that is` `consistent with the Commission's rules applicable to a` `filing for a general increase in rates or any rules adopted` `by the Commission to implement this Section. Normalization` `adjustments shall not be required. Notwithstanding any` `other provision of this Section or Act or any rule or other` `requirement adopted by the Commission, a participating` `utility that is a combination utility with more than one` `rate zone shall not be required to file a separate set of` `such data and documentation for each rate zone and may` `combine such data and documentation into a single set of` `schedules.` Within 45 days after the utility files its annual update of` `cost inputs to the performance-based formula rate, the` `Commission shall have the authority, either upon complaint or` `its own initiative, but with reasonable notice, to enter upon a` `hearing concerning the prudence and reasonableness of the costs` `incurred by the utility to be recovered during the applicable` `rate year that are reflected in the inputs to the` `performance-based formula rate derived from the utility's FERC` `Form 1. During the course of the hearing, each objection shall` `be stated with particularity and evidence provided in support` `thereof, after which the utility shall have the opportunity to` `rebut the evidence. Discovery shall be allowed consistent with` `the Commission's Rules of Practice, which Rules shall be` `enforced by the Commission or the assigned hearing examiner.` `The Commission shall apply the same evidentiary standards,` `including, but not limited to, those concerning the prudence` `and reasonableness of the costs incurred by the utility, in the` `hearing as it would apply in a hearing to review a filing for a` `general increase in rates under Article IX of this Act. The` `Commission shall not, however, have the authority in a` `proceeding under this subsection (d) to consider or order any` `changes to the structure or protocols of the performance-based` `formula rate approved pursuant to subsection (c) of this` `Section. In a proceeding under this subsection (d), the` `Commission shall enter its order no later than the earlier of` `240 days after the utility's filing of its annual update of` `cost inputs to the performance-based formula rate or December` `31. The Commission's determinations of the prudence and` `reasonableness of the costs incurred for the applicable` `calendar year shall be final upon entry of the Commission's` `order and shall not be subject to reopening, reexamination, or` `collateral attack in any other Commission proceeding, case,` `docket, order, rule or regulation, provided, however, that` `nothing in this subsection (d) shall prohibit a party from` `petitioning the Commission to rehear or appeal to the courts` `the order pursuant to the provisions of this Act.` In the event the Commission does not, either upon complaint` `or its own initiative, enter upon a hearing within 45 days` `after the utility files the annual update of cost inputs to its` `performance-based formula rate, then the costs incurred for the` `applicable calendar year shall be deemed prudent and` `reasonable, and the filed charges shall not be subject to` `reopening, reexamination, or collateral attack in any other` `proceeding, case, docket, order, rule, or regulation.` A participating utility's first filing of the updated cost` `inputs, and any Commission investigation of such inputs` `pursuant to this subsection (d) shall proceed notwithstanding` `the fact that the Commission's investigation under subsection` `(c) of this Section is still pending and notwithstanding any` `other law, order, rule, or Commission practice to the contrary.` (e) Nothing in subsections (c) or (d) of this Section shall` `prohibit the Commission from investigating, or a participating` `utility from filing, revenue-neutral tariff changes related to` `rate design of a performance-based formula rate that has been` `placed into effect for the utility. Following approval of a` `participating utility's performance-based formula rate tariff` `pursuant to subsection (c) of this Section, the utility shall` `make a filing with the Commission within one year after the` `effective date of the performance-based formula rate tariff` `that proposes changes to the tariff to incorporate the findings` `of any final rate design orders of the Commission applicable to` `the participating utility and entered subsequent to the` `Commission's approval of the tariff. The Commission shall,` `after notice and hearing, enter its order approving, or` `approving with modification, the proposed changes to the` `performance-based formula rate tariff within 240 days after the` `utility's filing. Following such approval, the utility shall` `make a filing with the Commission during each subsequent 3-year` `period that either proposes revenue-neutral tariff changes or` `re-files the existing tariffs without change, which shall` `present the Commission with an opportunity to suspend the` `tariffs and consider revenue-neutral tariff changes related to` `rate design.` (f) Within 30 days after the filing of a tariff pursuant to` `subsection (c) of this Section, each participating utility` `shall develop and file with the Commission multi-year metrics` `designed to achieve, ratably (i.e., in equal segments) over a` `10-year period, improvement over baseline performance values` `as follows:` ``(1) Twenty percent improvement in the System Average` `Interruption Frequency Index, using a baseline of the` `average of the data from 2001 through 2010.` ``(2) Fifteen percent improvement in the system Customer` `Average Interruption Duration Index, using a baseline of` `the average of the data from 2001 through 2010.` ``(3) For a participating utility other than a` `combination utility, 20% improvement in the System Average` `Interruption Frequency Index for its Southern Region,` `using a baseline of the average of the data from 2001` `through 2010. For purposes of this paragraph (3), Southern` `Region shall have the meaning set forth in the` `participating utility's most recent report filed pursuant` `to Section 16-125 of this Act.` ``(3.5) For a participating utility other than a` `combination utility, 20% improvement in the System Average` `Interruption Frequency Index for its Northeastern Region,` `using a baseline of the average of the data from 2001` `through 2010. For purposes of this paragraph (3.5),` `Northeastern Region shall have the meaning set forth in the` `participating utility's most recent report filed pursuant` `to Section 16-125 of this Act.` ``(4) Seventy-five percent improvement in the total` `number of customers who exceed the service reliability` `targets as set forth in subparagraphs (A) through (C) of` `paragraph (4) of subsection (b) of 83 Ill. Admin. Code Part` `411.140 as of May 1, 2011, using 2010 as the baseline year.` ``(5) Reduction in issuance of estimated electric bills:` `90% improvement for a participating utility other than a` `combination utility, and 56% improvement for a` `participating utility that is a combination utility, using` `a baseline of the average number of estimated bills for the` `years 2008 through 2010.` ``(6) Consumption on inactive meters: 90% improvement` `for a participating utility other than a combination` `utility, and 56% improvement for a participating utility` `that is a combination utility, using a baseline of the` `average unbilled kilowatthours for the years 2009 and 2010.` ``(7) Unaccounted for energy: 50% improvement for a` `participating utility other than a combination utility` `using a baseline of the non-technical line loss unaccounted` `for energy kilowatthours for the year 2009.` ``(8) Uncollectible expense: reduce uncollectible` `expense by at least $30,000,000 for a participating utility` `other than a combination utility and by at least $3,500,000` `for a participating utility that is a combination utility,` `using a baseline of the average uncollectible expense for` `the years 2008 through 2010.` ``(9) Opportunities for minority-owned and female-owned` `business enterprises: design a performance metric` `regarding the creation of opportunities for minority-owned` `and female-owned business enterprises consistent with` `State and federal law using a base performance value of the` `percentage of the participating utility's capital` `expenditures that were paid to minority-owned and` `female-owned business enterprises in 2010.` The definitions set forth in 83 Ill. Admin. Code Part` `411.20 as of May 1, 2011 shall be used for purposes of` `calculating performance under paragraphs (1) through (3.5) of` `this subsection (f), provided, however, that the participating` `utility may exclude up to 9 extreme weather event days from` `such calculation for each year, and provided further that the` `participating utility shall exclude 9 extreme weather event` `days when calculating each year of the baseline period to the` `extent that there are 9 such days in a given year of the` `baseline period. For purposes of this Section, an extreme` `weather event day is a 24-hour calendar day (beginning at 12:00` `a.m. and ending at 11:59 p.m.) during which any weather event` `(e.g., storm, tornado) caused interruptions for 10,000 or more` `of the participating utility's customers for 3 hours or more.` `If there are more than 9 extreme weather event days in a year,` `then the utility may choose no more than 9 extreme weather` `event days to exclude, provided that the same extreme weather` `event days are excluded from each of the calculations performed` `under paragraphs (1) through (3.5) of this subsection (f).` The metrics shall include incremental performance goals` `for each year of the 10-year period, which shall be designed to` `demonstrate that the utility is on track to achieve the` `performance goal in each category at the end of the 10-year` `period. The utility shall elect when the 10-year period shall` `commence for the metrics set forth in subparagraphs (1) through` `(4) and (9) of this subsection (f), provided that it begins no` `later than 14 months following the date on which the utility` `begins investing pursuant to subsection (b) of this Section,` `and when the 10-year period shall commence for the metrics set` `forth in subparagraphs (5) through (8) of this subsection (f),` `provided that it begins no later than 14 months following the` `date on which the Commission enters its order approving the` `utility's Advanced Metering Infrastructure Deployment Plan` `pursuant to subsection (c) of Section 16-108.6 of this Act.` The metrics and performance goals set forth in` `subparagraphs (5) through (8) of this subsection (f) are based` `on the assumptions that the participating utility may fully` `implement the technology described in subsection (b) of this` `Section, including utilizing the full functionality of such` `technology and that there is no requirement for personal` `on-site notification. If the utility is unable to meet the` `metrics and performance goals set forth in subparagraphs (5)` `through (8) of this subsection (f) for such reasons, and the` `Commission so finds after notice and hearing, then the utility` `shall be excused from compliance, but only to the limited` `extent achievement of the affected metrics and performance` `goals was hindered by the less than full implementation.` (f-5) The financial penalties applicable to the metrics` `described in subparagraphs (1) through (8) of subsection (f) of` `this Section, as applicable, shall be applied through an` `adjustment to the participating utility's return on equity of` `no more than a total of 30 basis points in each of the first 3` `years, of no more than a total of 34 basis points in each of the` `3 years thereafter, and of no more than a total of 38 basis` `points in each of the 4 years thereafter, as follows:` ``(1) With respect to each of the incremental annual` `performance goals established pursuant to paragraph (1) of` `subsection (f) of this Section,` `(A) for each year that a participating utility` `other than a combination utility does not achieve the` `annual goal, the participating utility's return on` `equity shall be reduced as follows: during years 1` `through 3, by 5 basis points; during years 4 through 6,` `by 6 basis points; and during years 7 through 10, by 7` `basis points; and` `(B) for each year that a participating utility that` `is a combination utility does not achieve the annual` `goal, the participating utility's return on equity` `shall be reduced as follows: during years 1 through 3,` `by 10 basis points; during years 4 through 6, by 12` `basis points; and during years 7 through 10, by 14` `basis points.` ``(2) With respect to each of the incremental annual` `performance goals established pursuant to paragraph (2) of` `subsection (f) of this Section, for each year that the` `participating utility does not achieve each such goal, the` `participating utility's return on equity shall be reduced` `as follows: during years 1 through 3, by 5 basis points;` `during years 4 through 6, by 6 basis points; and during` `years 7 through 10, by 7 basis points.` ``(3) With respect to each of the incremental annual` `performance goals established pursuant to paragraphs (3)` `and (3.5) of subsection (f) of this Section, for each year` `that a participating utility other than a combination` `utility does not achieve both such goals, the participating` `utility's return on equity shall be reduced as follows:` `during years 1 through 3, by 5 basis points; during years 4` `through 6, by 6 basis points; and during years 7 through` `10, by 7 basis points.` ``(4) With respect to each of the incremental annual` `performance goals established pursuant to paragraph (4) of` `subsection (f) of this Section, for each year that the` `participating utility does not achieve each such goal, the` `participating utility's return on equity shall be reduced` `as follows: during years 1 through 3, by 5 basis points;` `during years 4 through 6, by 6 basis points; and during` `years 7 through 10, by 7 basis points.` ``(5) With respect to each of the incremental annual` `performance goals established pursuant to subparagraph (5)` `of subsection (f) of this Section, for each year that the` `participating utility does not achieve at least 95% of each` `such goal, the participating utility's return on equity` `shall be reduced by 5 basis points for each such unachieved` `goal.` ``(6) With respect to each of the incremental annual` `performance goals established pursuant to paragraphs (6),` `(7), and (8) of subsection (f) of this Section, as` `applicable, which together measure non-operational` `customer savings and benefits relating to the` `implementation of the Advanced Metering Infrastructure` `Deployment Plan, as defined in Section 16-108.6 of this` `Act, the performance under each such goal shall be` `calculated in terms of the percentage of the goal achieved.` `The percentage of goal achieved for each of the goals shall` `be aggregated, and an average percentage value calculated,` `for each year of the 10-year period. If the utility does` `not achieve an average percentage value in a given year of` `at least 95%, the participating utility's return on equity` `shall be reduced by 5 basis points.` The financial penalties shall be applied as described in` `this subsection (f-5) for the 12-month period in which the` `deficiency occurred through a separate tariff mechanism, which` `shall be filed by the utility together with its metrics. In the` `event the formula rate tariff established pursuant to` `subsection (c) of this Section terminates, the utility's` `obligations under subsection (f) of this Section and this` `subsection (f-5) shall also terminate, provided, however, that` `the tariff mechanism established pursuant to subsection (f) of` `this Section and this subsection (f-5) shall remain in effect` `until any penalties due and owing at the time of such` `termination are applied.` The Commission shall, after notice and hearing, enter an` `order within 120 days after the metrics are filed approving, or` `approving with modification, a participating utility's tariff` `or mechanism to satisfy the metrics set forth in subsection (f)` `of this Section. On June 1 of each subsequent year, each` `participating utility shall file a report with the Commission` `that includes, among other things, a description of how the` `participating utility performed under each metric and an` `identification of any extraordinary events that adversely` `impacted the utility's performance. Whenever a participating` `utility does not satisfy the metrics required pursuant to` `subsection (f) of this Section, the Commission shall, after` `notice and hearing, enter an order approving financial` `penalties in accordance with this subsection (f-5). The` `Commission-approved financial penalties shall be applied` `beginning with the next rate year. Nothing in this Section` `shall authorize the Commission to reduce or otherwise obviate` `the imposition of financial penalties for failing to achieve` `one or more of the metrics established pursuant to subparagraph` `(1) through (4) of subsection (f) of this Section.` (g) On or before July 31, 2014, each participating utility` `shall file a report with the Commission that sets forth the` `average annual increase in the average amount paid per` `kilowatthour for residential eligible retail customers,` `exclusive of the effects of energy efficiency programs,` `comparing the 12-month period ending May 31, 2012; the 12-month` `period ending May 31, 2013; and the 12-month period ending May` `31, 2014. For a participating utility that is a combination` `utility with more than one rate zone, the weighted average` `aggregate increase shall be provided. The report shall be filed` `together with a statement from an independent auditor attesting` `to the accuracy of the report. The cost of the independent` `auditor shall be borne by the participating utility and shall` `not be a recoverable expense. "The average amount paid per` `kilowatthour" shall be based on the participating utility's` `tariffed rates actually in effect and shall not be calculated` `using any hypothetical rate or adjustments to actual charges` `(other than as specified for energy efficiency) as an input.` In the event that the average annual increase exceeds 2.5%` `as calculated pursuant to this subsection (g), then Sections` `16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act, other` `than this subsection, shall be inoperative as they relate to` `the utility and its service area as of the date of the report` `due to be submitted pursuant to this subsection and the utility` `shall no longer be eligible to annually update the` `performance-based formula rate tariff pursuant to subsection` `(d) of this Section. In such event, the then current rates` `shall remain in effect until such time as new rates are set` `pursuant to Article IX of this Act, subject to retroactive` `adjustment, with interest, to reconcile rates charged with` `actual costs, and the participating utility's voluntary` `commitments and obligations under subsection (b) of this` `Section shall immediately terminate, except for the utility's` `obligation to pay an amount already owed to the fund for` `training grants pursuant to a Commission order issued under` `subsection (b) of this Section.` In the event that the average annual increase is 2.5% or` `less as calculated pursuant to this subsection (g), then the` `performance-based formula rate shall remain in effect as set` `forth in this Section.` For purposes of this Section, the amount per kilowatthour` `means the total amount paid for electric service expressed on a` `per kilowatthour basis, and the total amount paid for electric` `service includes without limitation amounts paid for supply,` `transmission, distribution, surcharges, and add-on taxes` `exclusive of any increases in taxes or new taxes imposed after` `October 26, 2011 (the effective date of Public Act 97-616). For` `purposes of this Section, "eligible retail customers" shall` `have the meaning set forth in Section 16-111.5 of this Act.` The fact that this Section becomes inoperative as set forth` `in this subsection shall not be construed to mean that the` `Commission may reexamine or otherwise reopen prudence or` `reasonableness determinations already made.` (h)``Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of` `this Act, other than this subsection, are inoperative after` `December 31, 2019 for every participating utility, after which` `time a participating utility shall no longer be eligible to` `annually update the performance-based formula rate tariff` `pursuant to subsection (d) of this Section. At such time, the` `then current rates shall remain in effect until such time as` `new rates are set pursuant to Article IX of this Act, subject` `to retroactive adjustment, with interest, to reconcile rates` `charged with actual costs.` By December 31, 2017, the Commission shall prepare and file` `with the General Assembly a report on the infrastructure` `program and the performance-based formula rate. The report` `shall include the change in the average amount per kilowatthour` `paid by residential customers between June 1, 2011 and May 31,` `2017. If the change in the total average rate paid exceeds 2.5%` `compounded annually, the Commission shall include in the report` `an analysis that shows the portion of the change due to the` `delivery services component and the portion of the change due` `to the supply component of the rate. The report shall include` `separate sections for each participating utility.` In the event``Sections 16-108.5, 16-108.6, 16-108.7, and` `16-108.8 of this Act``, other than this subsection (h), `do not` `become inoperative after December 31, 2019, then these Sections `are inoperative after December 31, 2022 for every participating` `utility, after which time a participating utility shall no` `longer be eligible to annually update the performance-based` `formula rate tariff pursuant to subsection (d) of this Section.` `At such time, the then current rates shall remain in effect` `until such time as new rates are set pursuant to Article IX of` `this Act, subject to retroactive adjustment, with interest, to` `reconcile rates charged with actual costs.` The fact that this Section becomes inoperative as set forth` `in this subsection shall not be construed to mean that the` `Commission may reexamine or otherwise reopen prudence or` `reasonableness determinations already made.` (i) While a participating utility may use, develop, and` `maintain broadband systems and the delivery of broadband` `services, voice-over-internet-protocol services,` `telecommunications services, and cable and video programming` `services for use in providing delivery services and Smart Grid` `functionality or application to its retail customers,` `including, but not limited to, the installation,` `implementation and maintenance of Smart Grid electric system` `upgrades as defined in Section 16-108.6 of this Act, a` `participating utility is prohibited from offering to its retail` `customers broadband services or the delivery of broadband` `services, voice-over-internet-protocol services,` `telecommunications services, or cable or video programming` `services, unless they are part of a service directly related to` `delivery services or Smart Grid functionality or applications` `as defined in Section 16-108.6 of this Act, and from recovering` `the costs of such offerings from retail customers.` (j) Nothing in this Section is intended to legislatively` `overturn the opinion issued in Commonwealth Edison Co. v. Ill.` `Commerce Comm'n, Nos. 2-08-0959, 2-08-1037, 2-08-1137,` `1-08-3008, 1-08-3030, 1-08-3054, 1-08-3313 cons. (Ill. App.` `Ct. 2d Dist. Sept. 30, 2010). Public Act 97-616 shall not be` `construed as creating a contract between the General Assembly` `and the participating utility, and shall not establish a` `property right in the participating utility. (k) The changes made in subsections (c) and (d) of this` `Section by Public Act 98-15 are intended to be a restatement` `and clarification of existing law, and intended to give binding` `effect to the provisions of House Resolution 1157 adopted by` `the House of Representatives of the 97th General Assembly and` `Senate Resolution 821 adopted by the Senate of the 97th General` `Assembly that are reflected in paragraph (3) of this` `subsection. In addition, Public Act 98-15 preempts and` `supersedes any final Commission orders entered in Docket Nos.` `11-0721, 12-0001, 12-0293, and 12-0321 to the extent` `inconsistent with the amendatory language added to subsections` `(c) and (d).` ``(1) No earlier than 5 business days after May 22, 2013` `(the effective date of Public Act 98-15), each` `participating utility shall file any tariff changes` `necessary to implement the amendatory language set forth in` `subsections (c) and (d) of this Section by Public Act 98-15` `and a revised revenue requirement under the participating` `utility's performance-based formula rate. The Commission` `shall enter a final order approving such tariff changes and` `revised revenue requirement within 21 days after the` `participating utility's filing.` ``(2) Notwithstanding anything that may be to the` `contrary, a participating utility may file a tariff to` `retroactively recover its previously unrecovered actual` `costs of delivery service that are no longer subject to` `recovery through a reconciliation adjustment under` `subsection (d) of this Section. This retroactive recovery` `shall include any derivative adjustments resulting from` `the changes to subsections (c) and (d) of this Section by` `Public Act 98-15. Such tariff shall allow the utility to` `assess, on current customer bills over a period of 12` `monthly billing periods, a charge or credit related to` `those unrecovered costs with interest at the utility's` `weighted average cost of capital during the period in which` `those costs were unrecovered. A participating utility may` `file a tariff that implements a retroactive charge or` `credit as described in this paragraph for amounts not` `otherwise included in the tariff filing provided for in` `paragraph (1) of this subsection (k). The Commission shall` `enter a final order approving such tariff within 21 days` `after the participating utility's filing.` ``(3) The tariff changes described in paragraphs (1) and` `(2) of this subsection (k) shall relate only to, and be` `consistent with, the following provisions of Public Act` `98-15: paragraph (2) of subsection (c) regarding year-end` `capital structure, subparagraph (D) of paragraph (4) of` `subsection (c) regarding pension assets, and subsection` `(d) regarding the reconciliation components related to` `year-end rate base and interest calculated at a rate equal` `to the utility's weighted average cost of capital.` ``(4) Nothing in this subsection is intended to effect a` `dismissal of or otherwise affect an appeal from any final` `Commission orders entered in Docket Nos. 11-0721, 12-0001,` `12-0293, and 12-0321 other than to the extent of the` `amendatory language contained in subsections (c) and (d) of` `this Section of Public Act 98-15.` (l) Each participating utility shall be deemed to have been` `in full compliance with all requirements of subsection (b) of` `this Section, subsection (c) of this Section, Section 16-108.6` `of this Act, and all Commission orders entered pursuant to` `Sections 16-108.5 and 16-108.6 of this Act, up to and including` `May 22, 2013 (the effective date of Public Act 98-15). The` `Commission shall not undertake any investigation of such` `compliance and no penalty shall be assessed or adverse action` `taken against a participating utility for noncompliance with` `Commission orders associated with subsection (b) of this` `Section, subsection (c) of this Section, and Section 16-108.6` `of this Act prior to such date. Each participating utility` `other than a combination utility shall be permitted, without` `penalty, a period of 12 months after such effective date to` `take actions required to ensure its infrastructure investment` `program is in compliance with subsection (b) of this Section` `and with Section 16-108.6 of this Act. Provided further, the` `following subparagraphs shall apply to a participating utility` `other than a combination utility:` ``(A) if the Commission has initiated a proceeding` `pursuant to subsection (e) of Section 16-108.6 of this Act` `that is pending as of May 22, 2013 (the effective date of` `Public Act 98-15), then the order entered in such` `proceeding shall, after notice and hearing, accelerate the` `commencement of the meter deployment schedule approved in` `the final Commission order on rehearing entered in Docket` `No. 12-0298;` ``(B) if the Commission has entered an order pursuant to` `subsection (e) of Section 16-108.6 of this Act prior to May` `22, 2013 (the effective date of Public Act 98-15) that does` `not accelerate the commencement of the meter deployment` `schedule approved in the final Commission order on` `rehearing entered in Docket No. 12-0298, then the utility` `shall file with the Commission, within 45 days after such` `effective date, a plan for accelerating the commencement of` `the utility's meter deployment schedule approved in the` `final Commission order on rehearing entered in Docket No.` `12-0298; the Commission shall reopen the proceeding in` `which it entered its order pursuant to subsection (e) of` `Section 16-108.6 of this Act and shall, after notice and` `hearing, enter an amendatory order that approves or` `approves as modified such accelerated plan within 90 days` `after the utility's filing; or` ``(C) if the Commission has not initiated a proceeding` `pursuant to subsection (e) of Section 16-108.6 of this Act` `prior to May 22, 2013 (the effective date of Public Act` `98-15), then the utility shall file with the Commission,` `within 45 days after such effective date, a plan for` `accelerating the commencement of the utility's meter` `deployment schedule approved in the final Commission order` `on rehearing entered in Docket No. 12-0298 and the` `Commission shall, after notice and hearing, approve or` `approve as modified such plan within 90 days after the` `utility's filing.` Any schedule for meter deployment approved by the` `Commission pursuant to this subsection (l) shall take into` `consideration procurement times for meters and other equipment` `and operational issues. Nothing in Public Act 98-15 shall` `shorten or extend the end dates for the 5-year or 10-year` `periods set forth in subsection (b) of this Section or Section` `16-108.6 of this Act. Nothing in this subsection is intended to` `address whether a participating utility has, or has not,` `satisfied any or all of the metrics and performance goals` `established pursuant to subsection (f) of this Section.` (m) The provisions of Public Act 98-15 are severable under` `Section 1.31 of the Statute on Statutes.` `(Source: P.A. 98-15, eff. 5-22-13; 98-1175, eff. 6-1-15;` `99-143, eff. 7-27-15; 99-642, eff. 7-28-16.)` (220 ILCS 5/16-108.10 new)` Sec. 16-108.10.``Energy low-income and support program.` `Beginning in 2017, without obtaining any approvals from the` `Commission or any other agency, regardless of whether any such` `approval would otherwise be required, a participating utility` `that is not a combination utility, as defined by Section` `16-108.5 of this Act, shall contribute $10,000,000 per year for` `5 years to the energy low-income and support program, which is` `intended to fund customer assistance programs with the primary` `purpose being avoidance of imminent disconnection and` `reconnecting customers who have been disconnected for` `non-payment. Such programs may include:` ``(1) a residential hardship program that may partner` `with community-based organizations, including senior` `citizen organizations, and provides grants to low-income` `residential customers, including low-income senior` `citizens, who demonstrate a hardship;` ``(2) a program that provides grants and other bill` `payment concessions to disabled veterans who demonstrate a` `hardship and members of the armed services or reserve` `forces of the United States or members of the Illinois` `National Guard who are on active duty under an executive` `order of the President of the United States, an act of the` `Congress of the United States, or an order of the Governor` `and who demonstrate a hardship;` ``(3) a budget assistance program that provides tools and` `education to low-income senior citizens to assist them with` `obtaining information regarding energy usage and effective` `means of managing energy costs;` ``(4) a non-residential special hardship program that` `provides grants to non-residential customers, such as` `small businesses and non-profit organizations, that` `demonstrate a hardship, including those providing services` `to senior citizen and low-income customers; and` ``(5) a performance-based assistance program that` `provides grants to encourage residential customers to make` `on-time payments by matching a portion of the customer's` `payments or providing credits towards arrearages.` The payments made by a participating utility under this` `Section shall not be a recoverable expense. A participating` `utility may elect to fund either new or existing customer` `assistance programs, including, but not limited to, those that` `are administered by the utility.` Programs that use funds that are provided by an electric` `utility to reduce utility bills may be implemented through` `tariffs that are filed with and reviewed by the Commission. If` `a utility elects to file tariffs with the Commission to` `implement all or a portion of the programs, those tariffs` `shall, regardless of the date actually filed, be deemed` `accepted and approved and shall become effective on the first` `business day after they are filed. The electric utilities whose` `customers benefit from the funds that are disbursed as` `contemplated in this Section shall file annual reports` `documenting the disbursement of those funds with the` `Commission. The Commission may audit disbursement of the funds` `to ensure they were disbursed consistently with this Section.` If the Commission finds that a participating utility is no` `longer eligible to update the performance-based formula rate` `tariff under subsection (d) of Section 16-108.5 of this Act or` `the performance-based formula rate is otherwise terminated,` `then the participating utility's obligations under this` `Section shall immediately terminate.` (220 ILCS 5/16-108.11 new)` Sec. 16-108.11.``Employment opportunities.``To the extent` `feasible and consistent with State and federal law, the` `procurement of contracted labor, materials, and supplies by` `electric utilities in connection with the offering of delivery` `services under Article XVI of this Act should provide` `employment opportunities for all segments of the population and` `workforce, including minority-owned and female-owned business` `enterprises, and shall not, consistent with State and federal` `law, discriminate based on race or socioeconomic status.` (220 ILCS 5/16-108.12 new)` Sec. 16-108.12.``Utility job training program. (a) An electric utility that serves more than 3,000,000` `customers in the State shall spend $10,000,000 per year in` `2017, 2021, and 2025 to fund the programs described in this` `Section.` ``(1) The utility shall fund a solar training pipeline` `program in the amount of $3,000,000. The utility may` `administer the program or contract with another entity to` `administer the program. The program shall be designed to` `establish a solar installer training pipeline for projects` `authorized under Section 1-56 of the Illinois Power Agency` `Act and to establish a pool of trained installers who will` `be able to install solar projects authorized under` `subsection (c) of Section 1-75 of the Illinois Power Agency` `Act and otherwise. The program may include single event` `training programs. The program described in this paragraph` `(1) shall be designed to ensure that entities that offer` `training are located in, and trainees are recruited from,` `the same communities that the program aims to serve and` `that the program provides trainees with the opportunity to` `obtain real-world experience. The program described in` `this paragraph (1) shall also be designed to assist` `trainees so that they can obtain applicable certifications` `or participate in an apprenticeship program. The utility or` `administrator shall include funding for programs that` `provide training to individuals who are or were foster` `children or that target persons with a record who are` `transitioning with job training and job placement` `programs. The program shall include an incentive to` `facilitate an increase of hiring of qualified persons who` `are or were foster children and persons with a record. It` `is a goal of the program described in this paragraph (1)` `that at least 50% of the trainees in this program come from` `within environmental justice communities and that 2,000` `jobs are created for persons who are or were foster` `children and persons with a record.` ``(2) The utility shall fund a craft apprenticeship` `program in the amount of $3,000,000. The program shall be` `an accredited or otherwise recognized apprenticeship` `program over a period not to exceed 4 years, for particular` `crafts, trades, or skills in the electric industry that` `may, but need not, be related to solar installation.` ``(3) The utility shall fund multi-cultural jobs` `programs in the amount of $4,000,000. The funding shall be` `allocated in the applicable year to individual programs as` `set forth in subparagraphs (A) through (F) of this` `paragraph (3) and may, but need not, be related to solar` `installation, over a period not to exceed 4 years, by` `diversity-focused community organizations that have a` `record of successfully delivering job training.` `(A) $1,000,000 to a community-based civil rights` `and human services not-for-profit organization that` `provides economic development, human capital, and` `education program services.` `(B) $500,000 to a not-for-profit organization that` `is also an education institution that offers training` `programs approved by the Illinois State Board of` `Education and United States Department of Education` `with the goal of providing workforce initiatives` `leading to economic independence.` `(C) $500,000 to a not-for-profit organization` `dedicated to developing the educational and leadership` `capacity of minority youth through the operation of` `schools, youth leadership clubs and youth development` `centers.` `(D) $1,000,000 to a not-for-profit organization` `dedicated to providing equal access to opportunities` `in the construction industry that offer training` `programs that include Occupational Safety and Health` `Administration 10 and 30 certifications, Environmental` `Protection Agency Renovation, Repair and Painting` `Certification and Leadership in Energy and` `Environmental Design Accredited Green Associate Exam` `preparation courses.` `(E) $500,000 to a non-profit organization that has` `a proven record of successfully implementing utility` `industry training programs, with expertise in creating` `programs that strengthen the economics of communities` `including technical training workshops and economic` `development through community and financial partners.` `(F) $500,000 to a nonprofit organization that` `provides family services, housing education, job and` `career education opportunities that has successfully` `partnered with the utility on electric industry job` `training. For the purposes of this Section, "person with a record"` `means any person who (1) has been convicted of a crime in this` `State or of an offense in any other jurisdiction, not including` `an offense or attempted offense that would subject a person to` `registration under the Sex Offender Registration Act; (2) has a` `record of an arrest or an arrest that did not result in` `conviction for any crime in this State or of an offense in any` `other jurisdiction; or (3) has a juvenile delinquency` `adjudication.` (b) Within 60 days after the effective date of this` `amendatory Act of the 99th General Assembly, an electric` `utility that serves more than 3,000,000 customers in the State` `shall file with the Commission a plan to implement this` `Section. Within 60 days after the plan is filed, the Commission` `shall enter an order approving the plan if it is consistent` `with this Section or, if the plan is not consistent with this` `Section, the Commission shall explain the deficiencies, after` `which time the utility shall file a new plan. The utility shall` `use the funds described in subparagraph (O) of paragraph (1) of` `subsection (c) of Section 1-75 of the Illinois Power Agency Act` `to pay for the Commission approved programs under this Section.` (220 ILCS 5/16-108.15 new)` Sec. 16-108.15.``Rate impacts. `` (a) Each electric utility that serves more than 500,000` `retail customers in the State shall file with the Commission` `the reports required by this Section, which shall identify the` `actual and projected average monthly increases in residential` `retail customers' electric bills due to future energy` `investment costs for the applicable period or periods.` (b) The average monthly increase calculation shall be` `comprised of the following components:` ``(1) Beginning with the 2017 calendar year, the average` `monthly amount paid by residential retail customers,` `expressed on a cents-per-kilowatthour basis, to recover` `future energy investment costs, which include the charges` `to recover the costs incurred by the utility under the` `following provisions:` `(A) Sections 8-103, Section 8-103B, and 16-111.5B` `of this Act, as applicable, and as such costs may be` `recovered under Sections 8-103, 8-103B, 16-111.5B or` `Section 16-108.5 of this Act;` `(B) subsection (d-5) of Section 1-75 of the` `Illinois Power Agency Act, as such costs may be` `recovered under subsection (k) of Section 16-108 of` `this Act; and` `(C) Section 16-107.6 of this Act.` ``Beginning with the 2018 calendar year, each of the` `average monthly charges calculated in subparagraphs (A)` `through (C) of this paragraph (1) shall be equal to the` `average of each such charge applied over a period that` `commences with the calendar year ending December 31, 2017` `and ends with the most recently completed calendar year` `prior to the calculation or calculations required by this` `Section.` ``(2) The sum of the following:` `(A) net energy savings to residential retail` `customers that are attributable to the implementation` `of voltage optimization measures under Section 8-103B` `of this Act, expressed on a cents-per-kilowatthour` `basis, which are estimated energy and capacity` `benefits for residential retail customers minus the` `measure costs recovered from those customers, divided` `by the total number of residential retail customers,` `which quotient shall be divided by the months in the` `relevant period; notwithstanding this subparagraph` `(A), a utility may elect not to include an estimate of` `net energy savings as described in this subparagraph` `(A), in which case the value under this subparagraph` `(A) shall be zero; and` `(B) for an electric utility that serves more than` `3,000,000 retail customers in the State, the benefits` `of the programs described in Section 16-108.10 of this` `Act, which are $0.00030 per kilowatthour for the 2017,` `2018, 2019, 2020, and 2021 calendar years.` `Beginning with the 2018 calendar year, each of the` `values identified in subparagraphs (A) and (B) of this` `paragraph (2) shall be equal to the average of each` `such value during a period that commences with the` `calendar year ending December 31, 2017 and ends with` `the most recently completed calendar year prior to the` `calculation or calculations required by this Section.` ``(3) For an electric utility that serves more than` `3,000,000 retail customers in the State, the residential` `retail customer energy efficiency charges shall be $2.33` `per month for the 2017 calendar year, provided that such` `charge shall be increased by 4% per year thereafter; for an` `electric utility that serves more than 500,000 but less` `than 3,000,000 retail customers in the State, the` `residential retail customer energy efficiency charges` `shall be $3.94 per month for the 2017 calendar year,` `provided that such charge shall be increased by 4% per year` `thereafter. Beginning with the 2018 calendar year, this` `charge shall be equal to the average of the charges applied` `over a period that commences with the calendar year ending` `December 31, 2017 and ends with the most recently completed` `calendar year prior to the calculation or calculations` `required by this Section.` ``(c)(1) No later than June 30, 2017, an electric utility` `subject to this Section shall submit a report to the` `Commission that sets forth the utility's rolling 10-year` `projection of the values of each of the components` `described in paragraphs (1) through (3) of subsection (b)` `of this Section. No later than February 15, 2018 and every` `February 15 thereafter until February 15, 2031, each` `utility shall submit a report to the Commission that` `identifies the value of the actual charges applied during` `the immediately preceding calendar year and updates its` `rolling 10-year projection based on such actual charges` `provided that, beginning with the February 15, 2021 report` `and for each report thereafter, the period of time covered` `by such projection shall not extend beyond December 31,` `2030. Each report submitted under this subsection (c) shall` `calculate the actual average monthly increase in` `residential retail customers' electric bills due to future` `energy investment costs during the immediately preceding` `calendar year and shall also calculate the projected` `average monthly increase in residential retail customers'` `electric bills due to such costs over the rolling 10-year` `period. Such calculations shall be performed by` `subtracting the sum of paragraph (2) of subsection (b) of` `this Section from the sum of paragraph (1) of such` `subsection (b), multiplying such difference by, as` `applicable, the actual or forecasted average monthly` `kilowatthour consumption for the residential retail` `customer class for the applicable period, and subtracting` `from such product the applicable value identified under` `paragraph (3) of such subsection (b).` ``If the actual or projected average monthly increase for` `residential retail customers of electric utility that` `serves more than 3 million retail customers in the State` `exceeds $0.25, or the actual or projected average monthly` `increase for residential retail customers of an electric` `utility that serves more than 500,000 but less than 3` `million retail customers in the State exceeds $0.35, then` `the applicable utility shall comply with the provisions of` `paragraphs (2) through (4) of this subsection (c), as` `applicable.` ``(2) If the projected average monthly increase for` `residential retail customers during a calendar year` `exceeds the applicable limitation set forth in paragraph` `(1) of this subsection (c), then the utility shall comply` `with the following provisions, as applicable:` `(A) If an exceedance is projected during the first` `four calendar year of the rolling 10-year projection,` `then the utility shall include in its report submitted` `under paragraph (1) of this subsection (c) the` `utility's proposal or proposals to decrease the future` `energy investment costs described in paragraph (1) of` `subsection (b) of this Section to ensure that the` `limitation set forth in such paragraph (1) is not` `exceeded. The Commission shall, after notice and` `hearing, enter an order directing the utility to` `implement one or more proposals, as such proposals may` `be modified by the Commission. The Commission shall` `have the authority under this subparagraph (A) to` `approve modifications to the contracts executed under` `subsection (d-5) of Section 1-75 of the Illinois Power` `Agency Act. If the Commission approves modifications` `to such contracts, then the supplier shall have the` `option of accepting the modifications or terminating` `the modified contract or contracts, subject to the` `termination requirements and notice provisions set` `forth in item (i) of subparagraph (B) of paragraph (4)` `of this Section.` `(B) If an exceedance is projected during any` `calendar year during the last 6 years of the 10-year` `projection, then the utility shall demonstrate in its` `report submitted under paragraph (1) of this` `subsection (c) how the utility will reduce the future` `energy investment costs described in paragraph (1) of` `subsection (b) of this Section to ensure that the` `limitation set forth in such paragraph (1) is not` `exceeded.` ``(3) If the actual average monthly increase for` `residential retail customers during a calendar year` `exceeded the limitation set forth in paragraph (1) of this` `subsection (c), then the utility shall prepare and file` `with the Commission, at the time it submits its report` `under paragraph (1) of this subsection (c), a corrective` `action plan that identifies how the utility will` `immediately reduce expenditures so that the utility will be` `in compliance with such limitation beginning on January 1` `of the next calendar year. The Commission shall initiate an` `investigation to determine the factors that contributed to` `the actual average monthly increase exceeding such` `limitation for the applicable calendar year, and shall,` `after notice and hearing, enter an order approving, or` `approving with modification, the utility's corrective` `action plan within 120 days after the utility files such` `plan. The Commission shall also submit a report to the` `General Assembly no later than 30 days after it enters such` `order, and the report shall explain the results of the` `Commission's investigation and findings and conclusions of` `its order.` ``(4) If the actual average monthly increase for` `residential retail customers during a calendar year` `exceeds the limitation set forth in paragraph (1) of this` `subsection (c) for two consecutive years, then the utility` `shall indicate in its report filed under paragraph (1) of` `this subsection (c) whether the utility will proceed with` `or terminate the future energy investments described and` `authorized under subsection (d-5) of the Illinois Power` `Agency Act and Sections 8-103B and 16-107.6 of this Act.` `The utility shall be subject to the requirements of` `subparagraph (A) or (B) of this paragraph (4), as` `applicable.` `(A) If the utility indicates that it will proceed` `with the future energy investments, then it shall be` `subject to the corrective action plan requirements set` `forth in paragraph (3) of this subsection (c). In` `addition, the utility must commit to apply a credit to` `residential retail customers' bills if the actual` `average monthly increase for such customers exceeds` `the limitation set forth in paragraph (1) of this` `subsection (c) for the year in which the utility files` `its corrective action plan, which credit shall be in an` `amount that equals the portion by which the increase` `exceeds such limitation. The Commission shall initiate` `an investigation to determine the factors that` `contributed to the actual average monthly increase` `exceeding such limitation for the applicable calendar` `year, including an analysis of the factors` `contributing to the limitation being exceeded for two` `consecutive years, and shall, after notice and` `hearing, enter an order approving, or approving with` `modification, the utility's corrective action plan` `within 120 days after the utility files such plan. The` `Commission shall also submit a supplemental report to` `the General Assembly no later than 30 days after it` `enters such order, and the report shall explain the` `results of the Commission's investigation and findings` `and conclusions of its order.` `(B) If the utility indicates that it will terminate` `future energy investments, then the Commission shall,` `notwithstanding anything to the contrary:` (i) Order the utility to terminate the` `contract or contracts executed under subsection` `(d-5) of Section 1-75 of the Illinois Power Agency` `Act, pursuant to the contract termination` `provisions set forth in such subsection (d-5),` `provided that notice of such termination must be` `made at least 3 years and 75 days prior to the` `effective date of such termination. In the event` `that only a portion of the contracts executed under` `such subsection (d-5) are terminated for a` `particular zero emission facility, then the zero` `emission facility may elect to terminate all of the` `contracts executed for that facility under such` `subsection (d-5).` (ii) Within 30 days after the utility submits` `its report indicates that it will terminate future` `energy investments, initiate a proceeding to` `approve the process for terminating future` `expenditures under Section 16-107.6 of the Public` `Utilities Act. The Commission shall, after notice` `and hearing, enter its order approving such` `process no later than 120 days after initiating` `such proceeding.` (iii) Within 30 days after the utility submits` `its report indicates that it will terminate future` `energy investments, initiate a proceeding under` `Section 8-103B of this Act to reduce the cumulative` `persisting annual savings goals previously` `approved by the Commission under such Section to` `ensure just and reasonable rates. The Commission` `shall, after notice and hearing, enter its order` `approving such goal reductions no later than 120` `days after initiating such proceeding.` `Notwithstanding the termination of future energy` `investments pursuant to this subparagraph (B), the` `utility shall be permitted to continue to recover the` `costs of such investments that were incurred prior to` `such termination, including but not limited to all` `costs that are recovered through regulatory assets` `created under Sections 8-103B and 16-107.6 of this Act.` `Nothing in this Section shall limit the utility's` `ability to fully recover such costs. The utility shall` `also be permitted to continue to recover the costs of` `all payments made under contracts executed under` `subsection (d-5) until the effective date of the` `contract's termination.` (220 ILCS 5/16-108.16 new)` Sec. 16-108.16.``Commercial Rate Impacts.` (a) Each electric utility that serves more than 500,000` `retail customers in the State shall file with the Commission` `the reports required by this Section, which shall identify the` `annual average increases due to future energy investment costs` `for the applicable period or periods in electric bills to` `commercial and industrial retail customers. For purposes of` `this Section, "commercial and industrial retail customers"` `means non-residential retail customers other than those` `customers who are exempt from subsections (a) through (j) of` `Section 8-103B of this Act under subsection (l) of Section` `8-103B.` (b) The increase determination required by subsection (a)` `of this Section shall be based on a calculation comprised of` `the following components:` ``(1 )Beginning with the 2017 calendar year, the average` `annual amount paid by commercial and industrial retail` `customers, expressed on a cents-per-kilowatthour basis, to` `recover future energy investment costs, which include the` `charges to recover the costs incurred by the utility under` `the following provisions:` `(A) Sections 8-103, Section 8-103B, and 16-111.5B` `of this Act, as applicable, and as such costs may be` `recovered under Sections 8-103, 8-103B, 16-111.5B or` `Section 16-108.5 of this Act;` `(B) subsection (d-5) of Section 1-75 of the` `Illinois Power Agency Act, as such costs may be` `recovered under subsection (k) of Section 16-108 of` `this Act; and` `(C) Section 16-107.6 of this Act.` ``Beginning with the 2018 calendar year, each of the` `average annual charges calculated in subparagraphs (A)` `through (C) of this paragraph (1) shall be equal to the` `average of each such charge applied over a period that` `commences with the calendar year ending December 31, 2017` `and ends with the most recently completed calendar year` `prior to the calculation or calculations required by this` `Section.` ``(2) The sum of the following:` `(A) annual net energy savings to commercial and` `industrial retail customers that are attributable to` `the implementation of voltage optimization measures` `under Section 8-103B of this Act, expressed on a` `cents-per-kilowatthour basis, which are estimated` `energy and capacity benefits for commercial and` `industrial retail customers minus the measure costs` `recovered from those customers, divided by the average` `annual kilowatt-hour consumption of commercial and` `industrial retail customers; notwithstanding this` `subparagraph (A), a utility may elect not to include an` `estimate of net energy savings as described in this` `subparagraph (A), in which case the value under this` `subparagraph (A) shall be zero;` `(B) the average annual cents-per-kilowatthour` `charge applied under Section 8-103 of this Act to` `commercial and industrial retail customers during` `calendar year 2016 to recover the costs authorized by` `such Section; and` `(C) incremental energy efficiency savings, which` `shall be calculated by subtracting the value` `determined in item (ii) of this subparagraph (C) from` `the value determined in item (i) of this subparagraph` `and dividing the difference by the value identified in` `item (iii) of this subparagraph:` (i) Total value, in dollars, of the cumulative` `persisting annual saving achieved from the` `installation or implementation of all energy` `efficiency measures for commercial and industrial` `retail customers under Sections 8-103, 8-103B and` `16-111.5 of this Act, net of the cumulative annual` `percentage savings in kilowatt-hours, if any,` `calculated under subparagraph (A) of this` `paragraph (2).` (ii) 2016 value, which shall equal the value` `calculated under item (i) of this subparagraph (C)` `multiplied by the quotient of (aa) the cumulative` `persisting annual savings, in kilowatt-hours,` `achieved from the installation or implementation` `of all energy efficiency measures for commercial` `and industrial retail customers under Sections` `8-103, 8-103B and 16-111.5B of this Act as of` `December 31, 2016, divided by (bb) the cumulative` `persisting annual savings, in kilowatt-hours, from` `the installation or implementation of all energy` `efficiency measures for commercial and industrial` `retail customers under Sections 8-103, 8-103B and` `16-111.5 of this Act, net of the cumulative annual` `percentage savings in kilowatt-hours, if any,` `calculated under subparagraph (A) of this` `paragraph (2).` (iii) The average annual kilowatt-hour` `consumption of those commercial and industrial` `retail customers that installed or implemented` `energy efficiency measures under energy efficiency` `programs or plans approved pursuant to Sections` `8-103, 8-103B or 16-111.5B of this Act.` `Beginning with the 2018 calendar year, each of the` `values identified in subparagraphs (A) and (C) of this` `paragraph (2) shall be equal to the average of each` `such value during a period that commences with the` `calendar year ending December 31, 2017 and ends with` `the most recently completed calendar year prior to the` `calculation or calculations required by this Section.` `For purposes of this Section, cumulative` `persisting annual savings shall have the meaning set` `forth in Section 8-103B of this Act, and energy` `efficiency measures shall have the meaning set forth in` `Section 1-10 of the Illinois Power Agency Act.` ``(c)(1) No later than June 30, 2017, and every June 30` `thereafter until June 30, 2027, an electric utility subject` `to this Section shall submit a report to the Commission` `that sets forth the utility's 10-year projection of the` `values of each of the components described in paragraphs` `(1) and (2) of subsection (b) of this Section. Each` `utility's report to the Commission shall identify the` `result of the computation performed under this Section for` `the immediately preceding calendar year and update its` `10-year projection. Such calculations shall be performed` `by subtracting the sum of paragraph (2) of subsection (b)` `of this Section from the sum of paragraph (1) of such` `subsection (b).` ``In the event that the actual or projected average` `annual increase for commercial and industrial retail` `customers exceeds 1.3% of 8.90 cents-per-kilowatthour,` `which is the average amount paid per kilowatt-hour for` `electric service during the year ending December 31, 2015` `by Illinois commercial retail customers, as reported to the` `Edison Electric Institute, then the applicable utility` `shall comply with the provisions of paragraphs (2) through` `(4) of this subsection (c), as applicable.` ``(2) In the event that the projected average annual` `increase for commercial and industrial retail customers` `during a calendar year exceeds the applicable limitation` `set forth in paragraph (1) of this subsection (c), then the` `utility shall comply with the following provisions, as` `applicable:` `(A) If an exceedance is projected during the first` `four calendar years of the 10-year projection, then the` `utility shall include in its report submitted under` `paragraph (1) of this subsection (c) the utility's` `proposal or proposals to decrease the future energy` `investment costs described in paragraph (1) of` `subsection (b) of this Section to ensure that the` `limitation set forth in such paragraph (1) is not` `exceeded. The Commission shall, after notice and` `hearing, enter an order directing the utility to` `implement one or more proposals, as such proposals may` `be modified by the Commission. The Commission shall` `have the authority under this subparagraph (A) to` `approve modifications to the contracts executed under` `subsection (d-5) of Section 1-75 of the Illinois Power` `Agency Act. If the Commission approves modifications` `to such contracts that are in an amount that reduces` `the quantities to be procured under such contracts by` `more than 7%, then the supplier shall have the option` `of accepting the modifications or terminating the` `modified contract or contracts, subject to the` `termination requirements and notice provisions set` `forth in item (i) of subparagraph (B) of paragraph (4)` `of this Section.` `(B) If an exceedance is projected during any` `calendar year during the last 6 years of the 10-year` `projection, then the utility shall demonstrate in its` `report submitted under paragraph (1) of this` `subsection (c) how the utility will reduce the future` `energy investment costs described in paragraph (1) of` `subsection (b) of this Section to ensure that the` `limitation set forth in such paragraph (1) is not` `exceeded.` ``(3) If the actual average annual increase for` `commercial and industrial retail customers during a` `calendar year exceeded the limitation set forth in` `paragraph (1) of this subsection (c), then the utility` `shall prepare and file with the Commission, at the time it` `submits its report under paragraph (1) of this subsection` `(c), a corrective action plan. The Commission shall` `initiate an investigation to determine the factors that` `contributed to the actual average annual increase` `exceeding such limitation for the applicable calendar` `year, and shall, after notice and hearing, enter an order` `approving, or approving with modification, the utility's` `corrective action plan within 120 days after the utility` `files such plan. The Commission shall also submit a report` `to the General Assembly no later than 30 days after it` `enters such order, and the report shall explain the results` `of the Commission's investigation and findings and` `conclusions of its order.` ``(4) If the actual average annual increase for` `commercial and industrial retail customers during a` `calendar year exceeds the limitation set forth in paragraph` `(1) of this subsection (c) for two consecutive years, then` `the utility shall indicate in its report filed under` `paragraph (1) of this subsection (c) whether the utility` `will proceed with or terminate the future energy` `investments described and authorized under subsection` `(d-5) of the Illinois Power Agency Act and Sections 8-103B` `and 16-107.6 of this Act. The utility's election shall be` `subject to the requirements of subparagraph (A) or (B) of` `this paragraph (4), as applicable.` `(A) If the utility elects to proceed with the` `future energy investments, then it shall be subject to` `the corrective action plan requirements set forth in` `paragraph (3) of this subsection (c). In addition, the` `utility must commit to apply a credit to commercial and` `industrial retail customers' bills if the actual` `average annual increase for such customers exceeds the` `limitation set forth in paragraph (1) of this` `subsection (c) for the year in which the utility files` `its corrective action plan, which credit shall be in an` `amount that equals the portion by which the increase` `exceeds such limitation. The Commission shall initiate` `an investigation to determine the factors that` `contributed to the actual average annual increase` `exceeding such limitation for the applicable calendar` `year, including an analysis of the factors` `contributing to the limitation being exceeded for two` `consecutive years, and shall, after notice and` `hearing, enter an order approving, or approving with` `modification, the utility's corrective action plan` `within 120 days after the utility files such plan. The` `Commission shall also submit a supplemental report to` `the General Assembly no later than 30 days after it` `enters such order, and the report shall explain the` `results of the Commission's investigation and findings` `and conclusions of its order.` `(B) If the utility elects to terminate future` `energy investments, then the Commission shall,` `notwithstanding anything to the contrary:` (i) Order the utility to terminate the` `contract or contracts executed under subsection` `(d-5) of Section 1-75 of the Illinois Power Agency` `Act, pursuant to the contract termination` `provisions set forth in such subsection (d-5),` `provided that notice of such termination must be` `made at least 3 years and 75 days prior to the` `effective date of such termination. In the event` `that only a portion of the contracts executed under` `such subsection (d-5) are terminated for a` `particular zero emission facility, then the zero` `emission facility may elect to terminate all of the` `contracts executed for that facility under such` `subsection (d-5).` (ii) Within 30 days of the utility's report` `identifying its election to terminate future` `energy investments, initiate a proceeding to` `approve the process for terminating future` `expenditures under Sections 16-107.6 of the Public` `Utilities Act. The Commission shall, after notice` `and hearing, enter its order approving such` `process no later than 120 days after initiating` `such proceeding.` (iii) Within 30 days of the utility's report` `identifying its election to terminate future` `energy investments, initiate a proceeding under` `Section 8-103B of this Act to reduce the cumulative` `persisting annual savings goals previously` `approved by the Commission under such Section to` `ensure just and reasonable rates. The Commission` `shall, after notice and hearing, enter its order` `approving such goal reductions no later than 120` `days after initiating such proceeding.` `Notwithstanding the termination of future energy` `investments pursuant to this subparagraph (B), the` `utility shall be permitted to continue to recover the` `costs of such investments that were incurred prior to` `such termination, including but not limited to all` `costs that are recovered through regulatory assets` `created under Sections 8-103B and 16-107.6 of this Act.` `Nothing in this Section shall limit the utility's` `ability to fully recover such costs. The utility shall` `also be permitted to continue to recover the costs of` `all payments made under contracts executed under` `subsection (d-5) until the effective date of the` `contract's termination.` ``(5) Notwithstanding anything to the contrary, if,` `under this Section or subsection (m) of Section 16-108 of` `this Act, modifications to the contracts executed under` `subsection (d-5) of Section 1-75 of the Illinois Power` `Agency Act are, in total, in an amount that reduces the` `quantities to procured under such contracts by more than` `10%, then the supplier shall have the option of accepting` `the modifications or terminating the modified contract or` `contracts, subject to the termination requirements and` `notice provisions set forth in item (i) of subparagraph (B)` `of paragraph (4) of this Section.` (220 ILCS 5/16-111.1) ` Sec. 16-111.1.``Illinois Clean Energy Community Trust. (a) An electric utility which has sold or transferred` `generating facilities in a transaction to which subsection (k)` `of Section 16-111 applies is authorized to establish an` `Illinois clean energy community trust or foundation for the` `purposes of providing financial support and assistance to` `entities, public or private, within the State of Illinois` `including, but not limited to, units of State and local` `government, educational institutions, corporations, and` `charitable, educational, environmental and community` `organizations, for programs and projects that benefit the` `public by improving energy efficiency, developing renewable` `energy resources, supporting other energy related projects` `that improve the State's environmental quality, and supporting` `projects and programs intended to preserve or enhance the` `natural habitats and wildlife areas of the State. Provided,` `however, that the trust or foundation funds shall not be used` `for the remediation of environmentally impaired property. The` `trust or foundation may also assist in identifying other energy` `and environmental grant opportunities. (b) Such trust or foundation shall be governed by a` `declaration of trust or articles of incorporation and bylaws` `which shall, at a minimum, provide that: `` ``(1) There shall be 6 voting trustees of the trust or` `foundation, one of whom shall be appointed by the Governor,` `one of whom shall be appointed by the President of the` `Illinois Senate, one of whom shall be appointed by the` `Minority Leader of the Illinois Senate, one of whom shall` `be appointed by the Speaker of the Illinois House of` `Representatives, one of whom shall be appointed by the` `Minority Leader of the Illinois House of Representatives,` `and one of whom shall be appointed by the electric utility` `establishing the trust or foundation, provided that the` `voting trustee appointed by the utility shall be a` `representative of a recognized environmental action group` `selected by the utility. The Governor shall designate one` `of the 6 voting trustees to serve as chairman of the trust` `or foundation, who shall serve as chairman of the trust or` `foundation at the pleasure of the Governor. In addition,` `there shall be``5 `4``non-voting trustees, one of whom shall` `be appointed by the Director of Commerce and Economic` `Opportunity, one of whom shall be appointed by the Director` `of the Illinois Environmental Protection Agency, one of` `whom shall be appointed by the Director of Natural` `Resources, and``2 `one``of whom shall be appointed by the` `electric utility establishing the trust or foundation,` `provided that the non-voting trustee appointed by the` `utility shall bring financial expertise to the trust or` `foundation and shall have appropriate credentials` `therefor. `` ``(2) All voting trustees and the non-voting trustee with` `financial expertise shall be entitled to compensation for` `their services as trustees, provided, however, that no` `member of the General Assembly and no employee of the` `electric utility establishing the trust or foundation` `serving as a voting trustee shall receive any compensation` `for his or her services as a trustee, and provided further` `that the compensation to the chairman of the trust shall` `not exceed $25,000 annually and the compensation to any` `other trustee shall not exceed $20,000 annually. All` `trustees shall be entitled to reimbursement for reasonable` `expenses incurred on behalf of the trust in the performance` `of their duties as trustees. All such compensation and` `reimbursements shall be paid out of the trust. `` ``(3) Trustees shall be appointed within 30 days after` `the creation of the trust or foundation and shall serve for` `a term of 5 years commencing upon the date of their` `respective appointments, until their respective successors` `are appointed and qualified. `` ``(4) A vacancy in the office of trustee shall be filled` `by the person holding the office responsible for appointing` `the trustee whose death or resignation creates the vacancy,` `and a trustee appointed to fill a vacancy shall serve the` `remainder of the term of the trustee whose resignation or` `death created the vacancy. `` ``(5) The trust or foundation shall have an indefinite` `term, and shall terminate at such time as no trust assets` `remain. `` ``(6) The trust or foundation shall be funded in the` `minimum amount of $250,000,000, with the allocation and` `disbursement of funds for the various purposes for which` `the trust or foundation is established to be determined by` `the trustees in accordance with the declaration of trust or` `the articles of incorporation and bylaws; provided,` `however, that this amount may be reduced by up to` `$25,000,000 if, at the time the trust or foundation is` `funded, a corresponding amount is contributed by the` `electric utility establishing the trust or foundation to` `the Board of Trustees of Southern Illinois University for` `the purpose of funding programs or projects related to` `clean coal and provided further that $25,000,000 of the` `amount contributed to the trust or foundation shall be` `available to fund programs or projects related to clean` `coal. `` ``(7) The trust or foundation shall be authorized to` `employ an executive director and other employees, to enter` `into leases, contracts and other obligations on behalf of` `the trust or foundation, and to incur expenses that the` `trustees deem necessary or appropriate for the fulfillment` `of the purposes for which the trust or foundation is` `established, provided, however, that salaries and` `administrative expenses incurred on behalf of the trust or` `foundation shall not exceed $500,000 in the first fiscal` `year after the trust or foundation is established and shall` `not exceed $1,000,000 in each subsequent fiscal year. `` ``(8) The trustees may create and appoint advisory boards` `or committees to assist them with the administration of the` `trust or foundation, and to advise and make recommendations` `to them regarding the contribution and disbursement of the` `trust or foundation funds. `` (c)(1) In addition to the allocation and disbursement of` `funds for the purposes set forth in subsection (a) of this` `Section, the trustees of the trust or foundation shall` `annually contribute funds in amounts set forth in` `subparagraph (2) of this subsection to the Citizens Utility` `Board created by the Citizens Utility Board Act; provided,` `however, that any such funds shall be used solely for the` `representation of the interests of utility consumers` `before the Illinois Commerce Commission, the Federal` `Energy Regulatory Commission, and the Federal` `Communications Commission and for the provision of` `consumer education on utility service and prices and on` `benefits and methods of energy conservation. Provided,` `however, that no part of such funds shall be used to` `support (i) any lobbying activity, (ii) activities related` `to fundraising, (iii) advertising or other marketing` `efforts regarding a particular utility, or (iv)` `solicitation of support for, or advocacy of, a particular` `position regarding any specific utility or a utility's` `docketed proceeding. `` ``(2) In the calendar year in which the trust or` `foundation is first funded, the trustees shall contribute` `$1,000,000 to the Citizens Utility Board within 60 days` `after such trust or foundation is established; provided,` `however, that such contribution shall be made after` `December 31, 1999. In each of the 6 calendar years` `subsequent to the first contribution, if the trust or` `foundation is in existence, the trustees shall contribute` `to the Citizens Utility Board an amount equal to the total` `expenditures by such organization in the prior calendar` `year, as set forth in the report filed by the Citizens` `Utility Board with the chairman of such trust or foundation` `as required by subparagraph (3) of this subsection. Such` `subsequent contributions shall be made within 30 days of` `submission by the Citizens Utility Board of such report to` `the Chairman of the trust or foundation, but in no event` `shall any annual contribution by the trustees to the` `Citizens Utility Board exceed $1,000,000. Following such` `7-year period, an Illinois statutory consumer protection` `agency may petition the trust or foundation for` `contributions to fund expenditures of the type identified` `in paragraph (1), but in no event shall annual` `contributions by the trust or foundation for such` `expenditures exceed $1,000,000. `` ``(3) The Citizens Utility Board shall file a report with` `the chairman of such trust or foundation for each year in` `which it expends any funds received from the trust or` `foundation setting forth the amount of any expenditures` `(regardless of the source of funds for such expenditures)` `for: (i) the representation of the interests of utility` `consumers before the Illinois Commerce Commission, the` `Federal Energy Regulatory Commission, and the Federal` `Communications Commission, and (ii) the provision of` `consumer education on utility service and prices and on` `benefits and methods of energy conservation. Such report` `shall separately state the total amount of expenditures for` `the purposes or activities identified by items (i) and (ii)` `of this paragraph, the name and address of the external` `recipient of any such expenditure, if applicable, and the` `specific purposes or activities (including internal` `purposes or activities) for which each expenditure was` `made. Any report required by this subsection shall be filed` `with the chairman of such trust or foundation no later than` `March 31 of the year immediately following the year for` `which the report is required. (d) In addition to any other allocation and disbursement of` `funds in this Section, the trustees of the trust or foundation` `shall contribute an amount up to $125,000,000 (1) for deposit` `into the General Obligation Bond Retirement and Interest Fund` `held in the State treasury to assist in the repayment on` `general obligation bonds issued under subsection (d) of Section` `7 of the General Obligation Bond Act, and (2) for deposit into` `funds administered by agencies with responsibility for` `environmental activities to assist in payment for` `environmental programs. The amount required to be contributed` `shall be provided to the trustees in a certification letter` `from the Director of the Bureau of the Budget that shall be` `provided no later than August 1, 2003. The payment from the` `trustees shall be paid to the State no later than December 31st` `following the receipt of the letter. `(Source: P.A. 93-32, eff. 6-20-03; 94-793, eff. 5-19-06.) (220 ILCS 5/16-111.5)` Sec. 16-111.5.``Provisions relating to procurement.` (a) An electric utility that on December 31, 2005 served at` `least 100,000 customers in Illinois shall procure power and` `energy for its eligible retail customers in accordance with the` `applicable provisions set forth in Section 1-75 of the Illinois` `Power Agency Act and this Section.``Beginning with the delivery` `year commencing on June 1, 2017, such electric utility shall` `also procure zero emission credits from zero emission` `facilities in accordance with the applicable provisions set` `forth in Section 1-75 of the Illinois Power Agency Act, and,` `for years beginning on or after June 1, 2017, the utility shall` `procure renewable energy resources in accordance with the` `applicable provisions set forth in Section 1-75 of the Illinois` `Power Agency Act and this Section.``A small multi-jurisdictional` `electric utility that on December 31, 2005 served less than` `100,000 customers in Illinois may elect to procure power and` `energy for all or a portion of its eligible Illinois retail` `customers in accordance with the applicable provisions set` `forth in this Section and Section 1-75 of the Illinois Power` `Agency Act. This Section shall not apply to a small` `multi-jurisdictional utility until such time as a small` `multi-jurisdictional utility requests the Illinois Power` `Agency to prepare a procurement plan for its eligible retail` `customers. "Eligible retail customers" for the purposes of this` `Section means those retail customers that purchase power and` `energy from the electric utility under fixed-price bundled` `service tariffs, other than those retail customers whose` `service is declared or deemed competitive under Section 16-113` `and those other customer groups specified in this Section,` `including self-generating customers, customers electing hourly` `pricing, or those customers who are otherwise ineligible for` `fixed-price bundled tariff service.``For those `Those``customers` `that are excluded from the``definition of "eligible retail` `customers" shall not be included in the``procurement``plan's` `electric supply service `plan load``requirements, and the utility` `shall procure any supply requirements, including capacity,` `ancillary services, and hourly priced energy, in the applicable` `markets as needed to serve those customers, provided that the` `utility may include in its procurement plan load requirements` `for the load that is associated with those retail customers` `whose service has been declared or deemed competitive pursuant` `to Section 16-113 of this Act to the extent that those` `customers are purchasing power and energy during one of the` `transition periods identified in subsection (b) of Section` `16-113 of this Act.` (b) A procurement plan shall be prepared for each electric` `utility consistent with the applicable requirements of the` `Illinois Power Agency Act and this Section. For purposes of` `this Section, Illinois electric utilities that are affiliated` `by virtue of a common parent company are considered to be a` `single electric utility. Small multi-jurisdictional utilities` `may request a procurement plan for a portion of or all of its` `Illinois load. Each procurement plan shall analyze the` `projected balance of supply and demand for``those retail` `customers to be included in the plan's electric supply service` `requirements `eligible retail customers``over a 5-year period``, `with the first planning year beginning on June 1 of the year` `following the year in which the plan is filed. The plan shall` `specifically identify the wholesale products to be procured` `following plan approval, and shall follow all the requirements` `set forth in the Public Utilities Act and all applicable State` `and federal laws, statutes, rules, or regulations, as well as` `Commission orders. Nothing in this Section precludes` `consideration of contracts longer than 5 years and related` `forecast data. Unless specified otherwise in this Section, in` `the procurement plan or in the implementing tariff, any` `procurement occurring in accordance with this plan shall be` `competitively bid through a request for proposals process.` `Approval and implementation of the procurement plan shall be` `subject to review and approval by the Commission according to` `the provisions set forth in this Section. A procurement plan` `shall include each of the following components:` ``(1) Hourly load analysis. This analysis shall include:` `(i) multi-year historical analysis of hourly` `loads;` `(ii) switching trends and competitive retail` `market analysis;` `(iii) known or projected changes to future loads;` `and` `(iv) growth forecasts by customer class.` ``(2) Analysis of the impact of any demand side and` `renewable energy initiatives. This analysis shall include:` `(i) the impact of demand response programs and` `energy efficiency programs, both current and` `projected; for small multi-jurisdictional utilities,` `the impact of demand response and energy efficiency` `programs approved pursuant to Section 8-408 of this` `Act, both current and projected; and` `(ii) supply side needs that are projected to be` `offset by purchases of renewable energy resources, if` `any.` ``(3) A plan for meeting the expected load requirements` `that will not be met through preexisting contracts. This` `plan shall include:` `(i) definitions of the different Illinois retail` `customer classes for which supply is being purchased;` `(ii) the proposed mix of demand-response products` `for which contracts will be executed during the next` `year. For small multi-jurisdictional electric` `utilities that on December 31, 2005 served fewer than` `100,000 customers in Illinois, these shall be defined` `as demand-response products offered in an energy` `efficiency plan approved pursuant to Section 8-408 of` `this Act. The cost-effective demand-response measures` `shall be procured whenever the cost is lower than` `procuring comparable capacity products, provided that` `such products shall:` (A) be procured by a demand-response provider` `from``those `eligible``retail customers``included in` `the plan's electric supply service requirements``;` (B) at least satisfy the demand-response` `requirements of the regional transmission` `organization market in which the utility's service` `territory is located, including, but not limited` `to, any applicable capacity or dispatch` `requirements;` (C) provide for customers' participation in` `the stream of benefits produced by the` `demand-response products;` (D) provide for reimbursement by the` `demand-response provider of the utility for any` `costs incurred as a result of the failure of the` `supplier of such products to perform its` `obligations thereunder; and` (E) meet the same credit requirements as apply` `to suppliers of capacity, in the applicable` `regional transmission organization market;` `(iii) monthly forecasted system supply` `requirements, including expected minimum, maximum, and` `average values for the planning period;` `(iv) the proposed mix and selection of standard` `wholesale products for which contracts will be` `executed during the next year, separately or in` `combination, to meet that portion of its load` `requirements not met through pre-existing contracts,` `including but not limited to monthly 5 x 16 peak period` `block energy, monthly off-peak wrap energy, monthly 7 x` `24 energy, annual 5 x 16 energy, annual off-peak wrap` `energy, annual 7 x 24 energy, monthly capacity, annual` `capacity, peak load capacity obligations, capacity` `purchase plan, and ancillary services;` `(v) proposed term structures for each wholesale` `product type included in the proposed procurement plan` `portfolio of products; and` `(vi) an assessment of the price risk, load` `uncertainty, and other factors that are associated` `with the proposed procurement plan; this assessment,` `to the extent possible, shall include an analysis of` `the following factors: contract terms, time frames for` `securing products or services, fuel costs, weather` `patterns, transmission costs, market conditions, and` `the governmental regulatory environment; the proposed` `procurement plan shall also identify alternatives for` `those portfolio measures that are identified as having` `significant price risk.` ``(4) Proposed procedures for balancing loads. The` `procurement plan shall include, for load requirements` `included in the procurement plan, the process for (i)` `hourly balancing of supply and demand and (ii) the criteria` `for portfolio re-balancing in the event of significant` `shifts in load.` ``(5) Long-Term Renewable Resources Procurement Plan.` `The Agency shall prepare a long-term renewable resources` `procurement plan for the procurement of renewable energy` `credits under Sections 1-56 and 1-75 of the Illinois Power` `Agency Act for delivery beginning in the 2017 delivery` `year.` `(i) The initial long-term renewable resources` `procurement plan and all subsequent revisions shall be` `subject to review and approval by the Commission. For` `the purposes of this Section, "delivery year" has the` `same meaning as in Section 1-10 of the Illinois Power` `Agency Act. For purposes of this Section, "Agency"` `shall mean the Illinois Power Agency.` `(ii) The long-term renewable resources planning` `process shall be conducted as follows:` (A) Electric utilities shall provide a range` `of load forecasts to the Illinois Power Agency` `within 45 days of the Agency's request for` `forecasts, which request shall specify the length` `and conditions for the forecasts including, but` `not limited to, the quantity of distributed` `generation expected to be interconnected for each` `year.` (B) The Agency shall publish for comment the` `initial long-term renewable resources procurement` `plan no later than 120 days after the effective` `date of this amendatory Act of the 99th General` `Assembly and shall review, and may revise, the plan` `at least every 2 years thereafter. To the extent` `practicable, the Agency shall review and propose` `any revisions to the long-term renewable energy` `resources procurement plan in conjunction with the` `Agency's other planning and approval processes` `conducted under this Section. The initial` `long-term renewable resources procurement plan` `shall:` ``(aa) Identify the procurement programs and` `competitive procurement events consistent with` `the applicable requirements of the Illinois` `Power Agency Act and shall be designed to` `achieve the goals set forth in subsection (c)` `of Section 1-75 of that Act.` ``(bb) Include a schedule for procurements` `for renewable energy credits from` `utility-scale wind projects, utility-scale` `solar projects, and brownfield site` `photovoltaic projects consistent with` `subparagraph (G) of paragraph (1) of` `subsection (c) of Section 1-75 of the Illinois` `Power Agency Act.` ``(cc) Identify the process whereby the` `Agency will submit to the Commission for review` `and approval the proposed contracts to` `implement the programs required by such plan.` Copies of the initial long-term renewable` `resources procurement plan and all subsequent` `revisions shall be posted and made publicly` `available on the Agency's and Commission's` `websites, and copies shall also be provided to each` `affected electric utility. An affected utility and` `other interested parties shall have 45 days` `following the date of posting to provide comment to` `the Agency on the initial long-term renewable` `resources procurement plan and all subsequent` `revisions. All comments submitted to the Agency` `shall be specific, supported by data or other` `detailed analyses, and, if objecting to all or a` `portion of the procurement plan, accompanied by` `specific alternative wording or proposals. All` `comments shall be posted on the Agency's and` `Commission's websites. During this 45-day comment` `period, the Agency shall hold at least one public` `hearing within each utility's service area that is` `subject to the requirements of this paragraph (5)` `for the purpose of receiving public comment.` `Within 21 days following the end of the 45-day` `review period, the Agency may revise the long-term` `renewable resources procurement plan based on the` `comments received and shall file the plan with the` `Commission for review and approval.` (C) Within 14 days after the filing of the` `initial long-term renewable resources procurement` `plan or any subsequent revisions, any person` `objecting to the plan may file an objection with` `the Commission. Within 21 days after the filing of` `the plan, the Commission shall determine whether a` `hearing is necessary. The Commission shall enter` `its order confirming or modifying the initial` `long-term renewable resources procurement plan or` `any subsequent revisions within 120 days after the` `filing of the plan by the Illinois Power Agency.` (D) The Commission shall approve the initial` `long-term renewable resources procurement plan and` `any subsequent revisions, including expressly the` `forecast used in the plan and taking into account` `that funding will be limited to the amount of` `revenues actually collected by the utilities, if` `the Commission determines that the plan will` `reasonably and prudently accomplish the` `requirements of Section 1-56 and subsection (c) of` `Section 1-75 of the Illinois Power Agency Act. The` `Commission shall also approve the process for the` `submission, review, and approval of the proposed` `contracts to procure renewable energy credits or` `implement the programs authorized by the` `Commission pursuant to a long-term renewable` `resources procurement plan approved under this` `Section.` `(iii) The Agency or third parties contracted by the` `Agency shall implement all programs authorized by the` `Commission in an approved long-term renewable` `resources procurement plan without further review and` `approval by the Commission. Third parties shall not` `begin implementing any programs or receive any payment` `under this Section until the Commission has approved` `the contract or contracts under the process authorized` `by the Commission in item (D) of subparagraph (ii) of` `paragraph (5) of this subsection (b) and the third` `party and the Agency or utility, as applicable, have` `executed the contract. For those renewable energy` `credits subject to procurement through a competitive` `bid process under the plan or under the initial forward` `procurements for wind and solar resources described in` `subparagraph (G) of paragraph (1) of subsection (c) of` `Section 1-75 of the Illinois Power Agency Act, the` `Agency shall follow the procurement process specified` `in the provisions relating to electricity procurement` `in subsections (e) through (i) of this Section.` `(iv) An electric utility shall recover its costs` `associated with the procurement of renewable energy` `credits under this Section through an automatic` `adjustment clause tariff under subsection (k) of` `Section 16-108 of this Act. A utility shall not be` `required to advance any payment or pay any amounts` `under this Section that exceed the actual amount of` `revenues collected by the utility under paragraph (6)` `of subsection (c) of Section 1-75 of the Illinois Power` `Agency Act and subsection (k) of Section 16-108 of this` `Act, and contracts executed under this Section shall` `expressly incorporate this limitation.` `(v) For the public interest, safety, and welfare,` `the Agency and the Commission may adopt rules to carry` `out the provisions of this Section on an emergency` `basis immediately following the effective date of this` `amendatory Act of the 99th General Assembly.` `(vi) On or before July 1 of each year, the` `Commission shall hold an informal hearing for the` `purpose of receiving comments on the prior year's` `procurement process and any recommendations for` `change. (c) The procurement process set forth in Section 1-75 of` `the Illinois Power Agency Act and subsection (e) of this` `Section shall be administered by a procurement administrator` `and monitored by a procurement monitor.` ``(1) The procurement administrator shall:` `(i) design the final procurement process in` `accordance with Section 1-75 of the Illinois Power` `Agency Act and subsection (e) of this Section following` `Commission approval of the procurement plan;` `(ii) develop benchmarks in accordance with` `subsection (e)(3) to be used to evaluate bids; these` `benchmarks shall be submitted to the Commission for` `review and approval on a confidential basis prior to` `the procurement event;` `(iii) serve as the interface between the electric` `utility and suppliers;` `(iv) manage the bidder pre-qualification and` `registration process;` `(v) obtain the electric utilities' agreement to` `the final form of all supply contracts and credit` `collateral agreements;` `(vi) administer the request for proposals process;` `(vii) have the discretion to negotiate to` `determine whether bidders are willing to lower the` `price of bids that meet the benchmarks approved by the` `Commission; any post-bid negotiations with bidders` `shall be limited to price only and shall be completed` `within 24 hours after opening the sealed bids and shall` `be conducted in a fair and unbiased manner; in` `conducting the negotiations, there shall be no` `disclosure of any information derived from proposals` `submitted by competing bidders; if information is` `disclosed to any bidder, it shall be provided to all` `competing bidders;` `(viii) maintain confidentiality of supplier and` `bidding information in a manner consistent with all` `applicable laws, rules, regulations, and tariffs;` `(ix) submit a confidential report to the` `Commission recommending acceptance or rejection of` `bids;` `(x) notify the utility of contract counterparties` `and contract specifics; and` `(xi) administer related contingency procurement` `events.` ``(2) The procurement monitor, who shall be retained by` `the Commission, shall:` `(i) monitor interactions among the procurement` `administrator, suppliers, and utility;` `(ii) monitor and report to the Commission on the` `progress of the procurement process;` `(iii) provide an independent confidential report` `to the Commission regarding the results of the` `procurement event;` `(iv) assess compliance with the procurement plans` `approved by the Commission for each utility that on` `December 31, 2005 provided electric service to``at `a `least 100,000 customers in Illinois and for each small` `multi-jurisdictional utility that on December 31, 2005` `served less than 100,000 customers in Illinois;` `(v) preserve the confidentiality of supplier and` `bidding information in a manner consistent with all` `applicable laws, rules, regulations, and tariffs;` `(vi) provide expert advice to the Commission and` `consult with the procurement administrator regarding` `issues related to procurement process design, rules,` `protocols, and policy-related matters; and` `(vii) consult with the procurement administrator` `regarding the development and use of benchmark` `criteria, standard form contracts, credit policies,` `and bid documents.` (d) Except as provided in subsection (j), the planning` `process shall be conducted as follows:` ``(1) Beginning in 2008, each Illinois utility procuring` `power pursuant to this Section shall annually provide a` `range of load forecasts to the Illinois Power Agency by` `July 15 of each year, or such other date as may be required` `by the Commission or Agency. The load forecasts shall cover` `the 5-year procurement planning period for the next` `procurement plan and shall include hourly data` `representing a high-load, low-load``,``and expected-load` `scenario for the load of``those `the eligible``retail` `customers``included in the plan's electric supply service` `requirements``. The utility shall provide supporting data` `and assumptions for each of the scenarios.` ``(2) Beginning in 2008, the Illinois Power Agency shall` `prepare a procurement plan by August 15th of each year, or` `such other date as may be required by the Commission. The` `procurement plan shall identify the portfolio of` `demand-response and power and energy products to be` `procured. Cost-effective demand-response measures shall be` `procured as set forth in item (iii) of subsection (b) of` `this Section. Copies of the procurement plan shall be` `posted and made publicly available on the Agency's and` `Commission's websites, and copies shall also be provided to` `each affected electric utility. An affected utility shall` `have 30 days following the date of posting to provide` `comment to the Agency on the procurement plan. Other` `interested entities also may comment on the procurement` `plan. All comments submitted to the Agency shall be` `specific, supported by data or other detailed analyses,` `and, if objecting to all or a portion of the procurement` `plan, accompanied by specific alternative wording or` `proposals. All comments shall be posted on the Agency's and` `Commission's websites. During this 30-day comment period,` `the Agency shall hold at least one public hearing within` `each utility's service area for the purpose of receiving` `public comment on the procurement plan. Within 14 days` `following the end of the 30-day review period, the Agency` `shall revise the procurement plan as necessary based on the` `comments received and file the procurement plan with the` `Commission and post the procurement plan on the websites.` ``(3) Within 5 days after the filing of the procurement` `plan, any person objecting to the procurement plan shall` `file an objection with the Commission. Within 10 days after` `the filing, the Commission shall determine whether a` `hearing is necessary. The Commission shall enter its order` `confirming or modifying the procurement plan within 90 days` `after the filing of the procurement plan by the Illinois` `Power Agency.` ``(4) The Commission shall approve the procurement plan,` `including expressly the forecast used in the procurement` `plan, if the Commission determines that it will ensure` `adequate, reliable, affordable, efficient, and` `environmentally sustainable electric service at the lowest` `total cost over time, taking into account any benefits of` `price stability.` (e) The procurement process shall include each of the` `following components:` ``(1) Solicitation, pre-qualification, and registration` `of bidders. The procurement administrator shall` `disseminate information to potential bidders to promote a` `procurement event, notify potential bidders that the` `procurement administrator may enter into a post-bid price` `negotiation with bidders that meet the applicable` `benchmarks, provide supply requirements, and otherwise` `explain the competitive procurement process. In addition` `to such other publication as the procurement administrator` `determines is appropriate, this information shall be` `posted on the Illinois Power Agency's and the Commission's` `websites. The procurement administrator shall also` `administer the prequalification process, including` `evaluation of credit worthiness, compliance with` `procurement rules, and agreement to the standard form` `contract developed pursuant to paragraph (2) of this` `subsection (e). The procurement administrator shall then` `identify and register bidders to participate in the` `procurement event.` ``(2) Standard contract forms and credit terms and` `instruments. The procurement administrator, in` `consultation with the utilities, the Commission, and other` `interested parties and subject to Commission oversight,` `shall develop and provide standard contract forms for the` `supplier contracts that meet generally accepted industry` `practices. Standard credit terms and instruments that meet` `generally accepted industry practices shall be similarly` `developed. The procurement administrator shall make` `available to the Commission all written comments it` `receives on the contract forms, credit terms, or` `instruments. If the procurement administrator cannot reach` `agreement with the applicable electric utility as to the` `contract terms and conditions, the procurement` `administrator must notify the Commission of any disputed` `terms and the Commission shall resolve the dispute. The` `terms of the contracts shall not be subject to negotiation` `by winning bidders, and the bidders must agree to the terms` `of the contract in advance so that winning bids are` `selected solely on the basis of price.` ``(3) Establishment of a market-based price benchmark.` `As part of the development of the procurement process, the` `procurement administrator, in consultation with the` `Commission staff, Agency staff, and the procurement` `monitor, shall establish benchmarks for evaluating the` `final prices in the contracts for each of the products that` `will be procured through the procurement process. The` `benchmarks shall be based on price data for similar` `products for the same delivery period and same delivery` `hub, or other delivery hubs after adjusting for that` `difference. The price benchmarks may also be adjusted to` `take into account differences between the information` `reflected in the underlying data sources and the specific` `products and procurement process being used to procure` `power for the Illinois utilities. The benchmarks shall be` `confidential but shall be provided to, and will be subject` `to Commission review and approval, prior to a procurement` `event.` ``(4) Request for proposals competitive procurement` `process. The procurement administrator shall design and` `issue a request for proposals to supply electricity in` `accordance with each utility's procurement plan, as` `approved by the Commission. The request for proposals shall` `set forth a procedure for sealed, binding commitment` `bidding with pay-as-bid settlement, and provision for` `selection of bids on the basis of price.` ``(5) A plan for implementing contingencies in the event` `of supplier default or failure of the procurement process` `to fully meet the expected load requirement due to` `insufficient supplier participation, Commission rejection` `of results, or any other cause.` `(i) Event of supplier default: In the event of` `supplier default, the utility shall review the` `contract of the defaulting supplier to determine if the` `amount of supply is 200 megawatts or greater, and if` `there are more than 60 days remaining of the contract` `term. If both of these conditions are met, and the` `default results in termination of the contract, the` `utility shall immediately notify the Illinois Power` `Agency that a request for proposals must be issued to` `procure replacement power, and the procurement` `administrator shall run an additional procurement` `event. If the contracted supply of the defaulting` `supplier is less than 200 megawatts or there are less` `than 60 days remaining of the contract term, the` `utility shall procure power and energy from the` `applicable regional transmission organization market,` `including ancillary services, capacity, and day-ahead` `or real time energy, or both, for the duration of the` `contract term to replace the contracted supply;` `provided, however, that if a needed product is not` `available through the regional transmission` `organization market it shall be purchased from the` `wholesale market.` `(ii) Failure of the procurement process to fully` `meet the expected load requirement: If the procurement` `process fails to fully meet the expected load` `requirement due to insufficient supplier participation` `or due to a Commission rejection of the procurement` `results, the procurement administrator, the` `procurement monitor, and the Commission staff shall` `meet within 10 days to analyze potential causes of low` `supplier interest or causes for the Commission` `decision. If changes are identified that would likely` `result in increased supplier participation, or that` `would address concerns causing the Commission to` `reject the results of the prior procurement event, the` `procurement administrator may implement those changes` `and rerun the request for proposals process according` `to a schedule determined by those parties and` `consistent with Section 1-75 of the Illinois Power` `Agency Act and this subsection. In any event, a new` `request for proposals process shall be implemented by` `the procurement administrator within 90 days after the` `determination that the procurement process has failed` `to fully meet the expected load requirement.` `(iii) In all cases where there is insufficient` `supply provided under contracts awarded through the` `procurement process to fully meet the electric` `utility's load requirement, the utility shall meet the` `load requirement by procuring power and energy from the` `applicable regional transmission organization market,` `including ancillary services, capacity, and day-ahead` `or real time energy``,``or both; provided, however, that` `if a needed product is not available through the` `regional transmission organization market it shall be` `purchased from the wholesale market.` ``(6) The procurement process described in this` `subsection is exempt from the requirements of the Illinois` `Procurement Code, pursuant to Section 20-10 of that Code.` (f) Within 2 business days after opening the sealed bids,` `the procurement administrator shall submit a confidential` `report to the Commission. The report shall contain the results` `of the bidding for each of the products along with the` `procurement administrator's recommendation for the acceptance` `and rejection of bids based on the price benchmark criteria and` `other factors observed in the process. The procurement monitor` `also shall submit a confidential report to the Commission` `within 2 business days after opening the sealed bids. The` `report shall contain the procurement monitor's assessment of` `bidder behavior in the process as well as an assessment of the` `procurement administrator's compliance with the procurement` `process and rules. The Commission shall review the confidential` `reports submitted by the procurement administrator and` `procurement monitor, and shall accept or reject the` `recommendations of the procurement administrator within 2` `business days after receipt of the reports.` (g) Within 3 business days after the Commission decision` `approving the results of a procurement event, the utility shall` `enter into binding contractual arrangements with the winning` `suppliers using the standard form contracts; except that the` `utility shall not be required either directly or indirectly to` `execute the contracts if a tariff that is consistent with` `subsection (l) of this Section has not been approved and placed` `into effect for that utility.` (h) The names of the successful bidders and the load` `weighted average of the winning bid prices for each contract` `type and for each contract term shall be made available to the` `public at the time of Commission approval of a procurement` `event. The Commission, the procurement monitor, the` `procurement administrator, the Illinois Power Agency, and all` `participants in the procurement process shall maintain the` `confidentiality of all other supplier and bidding information` `in a manner consistent with all applicable laws, rules,` `regulations, and tariffs. Confidential information, including` `the confidential reports submitted by the procurement` `administrator and procurement monitor pursuant to subsection` `(f) of this Section, shall not be made publicly available and` `shall not be discoverable by any party in any proceeding,` `absent a compelling demonstration of need, nor shall those` `reports be admissible in any proceeding other than one for law` `enforcement purposes.` (i) Within 2 business days after a Commission decision` `approving the results of a procurement event or such other date` `as may be required by the Commission from time to time, the` `utility shall file for informational purposes with the` `Commission its actual or estimated retail supply charges, as` `applicable, by customer supply group reflecting the costs` `associated with the procurement and computed in accordance with` `the tariffs filed pursuant to subsection (l) of this Section` `and approved by the Commission.` (j) Within 60 days following``August 28, 2007 (``the effective` `date of``Public Act 95-481) `this amendatory Act``, each electric` `utility that on December 31, 2005 provided electric service to` `at least 100,000 customers in Illinois shall prepare and file` `with the Commission an initial procurement plan, which shall` `conform in all material respects to the requirements of the` `procurement plan set forth in subsection (b); provided,` `however, that the Illinois Power Agency Act shall not apply to` `the initial procurement plan prepared pursuant to this` `subsection. The initial procurement plan shall identify the` `portfolio of power and energy products to be procured and` `delivered for the period June 2008 through May 2009, and shall` `identify the proposed procurement administrator, who shall` `have the same experience and expertise as is required of a` `procurement administrator hired pursuant to Section 1-75 of the` `Illinois Power Agency Act. Copies of the procurement plan shall` `be posted and made publicly available on the Commission's` `website. The initial procurement plan may include contracts for` `renewable resources that extend beyond May 2009.` ``(i) Within 14 days following filing of the initial` `procurement plan, any person may file a detailed objection` `with the Commission contesting the procurement plan` `submitted by the electric utility. All objections to the` `electric utility's plan shall be specific, supported by` `data or other detailed analyses. The electric utility may` `file a response to any objections to its procurement plan` `within 7 days after the date objections are due to be` `filed. Within 7 days after the date the utility's response` `is due, the Commission shall determine whether a hearing is` `necessary. If it determines that a hearing is necessary, it` `shall require the hearing to be completed and issue an` `order on the procurement plan within 60 days after the` `filing of the procurement plan by the electric utility.` ``(ii) The order shall approve or modify the procurement` `plan, approve an independent procurement administrator,` `and approve or modify the electric utility's tariffs that` `are proposed with the initial procurement plan. The` `Commission shall approve the procurement plan if the` `Commission determines that it will ensure adequate,` `reliable, affordable, efficient, and environmentally` `sustainable electric service at the lowest total cost over` `time, taking into account any benefits of price stability.` (k)``(Blank). `In order to promote price stability for` `residential and small commercial customers during the` `transition to competition in Illinois, and notwithstanding any` `other provision of this Act, each electric utility subject to` `this Section shall enter into one or more multi-year financial` `swap contracts that become effective on the effective date of` `this amendatory Act. These contracts may be executed with` `generators and power marketers, including affiliated interests` `of the electric utility. These contracts shall be for a term of` `no more than 5 years and shall, for each respective utility or` `for any Illinois electric utilities that are affiliated by` `virtue of a common parent company and that are thereby` `considered a single electric utility for purposes of this` `subsection (k), not exceed in the aggregate 3,000 megawatts for` `any hour of the year. The contracts shall be financial` `contracts and not energy sales contracts. The contracts shall` `be executed as transactions under a negotiated master agreement` `based on the form of master agreement for financial swap` `contracts sponsored by the International Swaps and Derivatives` `Association, Inc. and shall be considered pre-existing` `contracts in the utilities' procurement plans for residential` `and small commercial customers. Costs incurred pursuant to a` `contract authorized by this subsection (k) shall be deemed` `prudently incurred and reasonable in amount and the electric` `utility shall be entitled to full cost recovery pursuant to the` `tariffs filed with the Commission.` (k-5)``(Blank). `In order to promote price stability for` `residential and small commercial customers during the` `infrastructure investment program described in subsection (b)` `of Section 16-108.5 of this Act, and notwithstanding any other` `provision of this Act or the Illinois Power Agency Act, for` `each electric utility that serves more than one million retail` `customers in Illinois, the Illinois Power Agency shall conduct` `a procurement event within 120 days after October 26, 2011 (the` `effective date of Public Act 97-616) and may procure contracts` `for energy and renewable energy credits for the period June 1,` `2013 through December 31, 2017 that satisfy the requirements of` `this subsection (k-5), including the benchmarks described in` `this subsection. These contracts shall be entered into as the` `result of a competitive procurement event, and, to the extent` `that any provisions of this Section or the Illinois Power` `Agency Act do not conflict with this subsection (k-5), such` `provisions shall apply to the procurement event. The energy` `contracts shall be for 24 hour by 7 day supply over a term that` `runs from the first delivery year through December 31, 2017.` `For a utility that serves over 2 million customers, the energy` `contracts shall be multi-year with pricing escalating at 2.5%` `per annum. The energy contracts may be designed as financial` `swaps or may require physical delivery.` Within 30 days of October 26, 2011 (the effective date of` `Public Act 97-616), each such utility shall submit to the` `Agency updated load forecasts for the period June 1, 2013` `through December 31, 2017. The megawatt volume of the contracts` `shall be based on the updated load forecasts of the minimum` `monthly on-peak or off-peak average load requirements shown in` `the forecasts, taking into account any existing energy` `contracts in effect as well as the expected migration of the` `utility's customers to alternative retail electric suppliers.` `The renewable energy credit volume shall be based on the number` `of credits that would satisfy the requirements of subsection` `(c) of Section 1-75 of the Illinois Power Agency Act, subject` `to the rate impact caps and other provisions of subsection (c)` `of Section 1-75 of the Illinois Power Agency Act. The` `evaluation of contract bids in the competitive procurement` `events for energy and for renewable energy credits shall` `incorporate price benchmarks set collaboratively by the` `Agency, the procurement administrator, the staff of the` `Commission, and the procurement monitor. If the contracts are` `swap contracts, then they shall be executed as transactions` `under a negotiated master agreement based on the form of master` `agreement for financial swap contracts sponsored by the` `International Swaps and Derivatives Association, Inc. Costs` `incurred pursuant to a contract authorized by this subsection` `(k-5) shall be deemed prudently incurred and reasonable in` `amount and the electric utility shall be entitled to full cost` `recovery pursuant to the tariffs filed with the Commission.` The cost of administering the procurement event described` `in this subsection (k-5) shall be paid by the winning supplier` `or suppliers to the procurement administrator through a` `supplier fee. In the event that there is no winning supplier` `for a particular utility, such utility will pay the procurement` `administrator for the costs associated with the procurement` `event, and those costs shall not be a recoverable expense.` `Nothing in this subsection (k-5) is intended to alter the` `recovery of costs for any other procurement event. (l) An electric utility shall recover its costs incurred` `under this Section, including, but not limited to, the costs of` `procuring power and energy demand-response resources under` `this Section. The utility shall file with the initial` `procurement plan its proposed tariffs through which its costs` `of procuring power that are incurred pursuant to a` `Commission-approved procurement plan and those other costs` `identified in this subsection (l), will be recovered. The` `tariffs shall include a formula rate or charge designed to pass` `through both the costs incurred by the utility in procuring a` `supply of electric power and energy for the applicable customer` `classes with no mark-up or return on the price paid by the` `utility for that supply, plus any just and reasonable costs` `that the utility incurs in arranging and providing for the` `supply of electric power and energy. The formula rate or charge` `shall also contain provisions that ensure that its application` `does not result in over or under recovery due to changes in` `customer usage and demand patterns, and that provide for the` `correction, on at least an annual basis, of any accounting` `errors that may occur. A utility shall recover through the` `tariff all reasonable costs incurred to implement or comply` `with any procurement plan that is developed and put into effect` `pursuant to Section 1-75 of the Illinois Power Agency Act and` `this Section, including any fees assessed by the Illinois Power` `Agency, costs associated with load balancing, and contingency` `plan costs. The electric utility shall also recover its full` `costs of procuring electric supply for which it contracted` `before the effective date of this Section in conjunction with` `the provision of full requirements service under fixed-price` `bundled service tariffs subsequent to December 31, 2006. All` `such costs shall be deemed to have been prudently incurred. The` `pass-through tariffs that are filed and approved pursuant to` `this Section shall not be subject to review under, or in any` `way limited by, Section 16-111(i) of this Act.``All of the costs` `incurred by the electric utility associated with the purchase` `of zero emission credits in accordance with subsection (d-5) of` `Section 1-75 of the Illinois Power Agency Act and, beginning` `June 1, 2017, all of the costs incurred by the electric utility` `associated with the purchase of renewable energy resources in` `accordance with Sections 1-56 and 1-75 of the Illinois Power` `Agency Act, shall be recovered through the electric utility's` `tariffed charges applicable to all of its retail customers, as` `specified in subsection (k) of Section 16-108 of this Act, and` `shall not be recovered through the electric utility's tariffed` `charges for electric power and energy supply to its eligible` `retail customers.` (m) The Commission has the authority to adopt rules to` `carry out the provisions of this Section. For the public` `interest, safety, and welfare, the Commission also has` `authority to adopt rules to carry out the provisions of this` `Section on an emergency basis immediately following``August 28,` `2007 (``the effective date of``Public Act 95-481) `this amendatory` `Act``.` (n) Notwithstanding any other provision of this Act, any` `affiliated electric utilities that submit a single procurement` `plan covering their combined needs may procure for those` `combined needs in conjunction with that plan, and may enter` `jointly into power supply contracts, purchases, and other` `procurement arrangements, and allocate capacity and energy and` `cost responsibility therefor among themselves in proportion to` `their requirements.` (o) On or before June 1 of each year, the Commission shall` `hold an informal hearing for the purpose of receiving comments` `on the prior year's procurement process and any recommendations` `for change.` (p) An electric utility subject to this Section may propose` `to invest, lease, own, or operate an electric generation` `facility as part of its procurement plan, provided the utility` `demonstrates that such facility is the least-cost option to` `provide electric service to``those `eligible``retail customers` `included in the plan's electric supply service requirements``. If` `the facility is shown to be the least-cost option and is` `included in a procurement plan prepared in accordance with` `Section 1-75 of the Illinois Power Agency Act and this Section,` `then the electric utility shall make a filing pursuant to` `Section 8-406 of this Act, and may request of the Commission` `any statutory relief required thereunder. If the Commission` `grants all of the necessary approvals for the proposed` `facility, such supply shall thereafter be considered as a` `pre-existing contract under subsection (b) of this Section. The` `Commission shall in any order approving a proposal under this` `subsection specify how the utility will recover the prudently` `incurred costs of investing in, leasing, owning, or operating` `such generation facility through just and reasonable rates` `charged to``those `eligible``retail customers``included in the` `plan's electric supply service requirements``. Cost recovery for` `facilities included in the utility's procurement plan pursuant` `to this subsection shall not be subject to review under or in` `any way limited by the provisions of Section 16-111(i) of this` `Act. Nothing in this Section is intended to prohibit a utility` `from filing for a fuel adjustment clause as is otherwise` `permitted under Section 9-220 of this Act. (q) If the Illinois Power Agency filed with the Commission,` `under Section 16-111.5 of this Act, its proposed procurement` `plan for the period commencing June 1, 2017, and the Commission` `has not yet entered its final order approving the plan on or` `before the effective date of this amendatory Act of the 99th` `General Assembly, then the Illinois Power Agency shall file a` `notice of withdrawal with the Commission, after the effective` `date of this amendatory Act of the 99th General Assembly, to` `withdraw the proposed procurement of renewable energy` `resources to be approved under the plan, other than the` `procurement of renewable energy credits from distributed` `renewable energy generation devices using funds previously` `collected from electric utilities' retail customers that take` `service pursuant to electric utilities' hourly pricing tariff` `or tariffs and, for an electric utility that serves less than` `100,000 retail customers in the State, other than the` `procurement of renewable energy credits from distributed` `renewable energy generation devices. Upon receipt of the` `notice, the Commission shall enter an order that approves the` `withdrawal of the proposed procurement of renewable energy` `resources from the plan. The initially proposed procurement of` `renewable energy resources shall not be approved or be the` `subject of any further hearing, investigation, proceeding, or` `order of any kind.` This amendatory Act of the 99th General Assembly preempts` `and supersedes any order entered by the Commission that` `approved the Illinois Power Agency's procurement plan for the` `period commencing June 1, 2017, to the extent it is` `inconsistent with the provisions of this amendatory Act of the` `99th General Assembly. To the extent any previously entered` `order approved the procurement of renewable energy resources,` `the portion of that order approving the procurement shall be` `void, other than the procurement of renewable energy credits` `from distributed renewable energy generation devices using` `funds previously collected from electric utilities' retail` `customers that take service under electric utilities' hourly` `pricing tariff or tariffs and, for an electric utility that` `serves less than 100,000 retail customers in the State, other` `than the procurement of renewable energy credits for` `distributed renewable energy generation devices. `(Source: P.A. 97-325, eff. 8-12-11; 97-616, eff. 10-26-11;` `97-813, eff. 7-13-12; revised 9-14-16.)` (220 ILCS 5/16-111.5B)` Sec. 16-111.5B.``Provisions relating to energy efficiency` `procurement.` (a)``Procurement `Beginning in 2012, procurement``plans` `prepared``and filed``pursuant to Section 16-111.5 of this Act` `during the years 2012 through 2015``shall be subject to the` `following additional requirements:` ``(1) The analysis included pursuant to paragraph (2) of` `subsection (b) of Section 16-111.5 shall also include the` `impact of energy efficiency building codes or appliance` `standards, both current and projected.` ``(2) The procurement plan components described in` `subsection (b) of Section 16-111.5 shall also include an` `assessment of opportunities to expand the programs` `promoting energy efficiency measures that have been` `offered under plans approved pursuant to Section 8-103 of` `this Act or to implement additional cost-effective energy` `efficiency programs or measures.` ``(3) In addition to the information provided pursuant to` `paragraph (1) of subsection (d) of Section 16-111.5 of this` `Act, each Illinois utility procuring power pursuant to that` `Section shall annually provide to the Illinois Power Agency` `by July 15 of each year, or such other date as may be` `required by the Commission or Agency, an assessment of` `cost-effective energy efficiency programs or measures that` `could be included in the procurement plan. The assessment` `shall include the following:` `(A) A comprehensive energy efficiency potential` `study for the utility's service territory that was` `completed within the past 3 years.` `(B) Beginning in 2014, the most recent analysis` `submitted pursuant to Section 8-103A of this Act and` `approved by the Commission under subsection (f) of` `Section 8-103 of this Act.` `(C) Identification of new or expanded` `cost-effective energy efficiency programs or measures` `that are incremental to those included in energy` `efficiency and demand-response plans approved by the` `Commission pursuant to Section 8-103 of this Act and` `that would be offered to all retail customers whose` `electric service has not been declared competitive` `under Section 16-113 of this Act and who are eligible` `to purchase power and energy from the utility under` `fixed-price bundled service tariffs, regardless of` `whether such customers actually do purchase such power` `and energy from the utility.` `(D) Analysis showing that the new or expanded` `cost-effective energy efficiency programs or measures` `would lead to a reduction in the overall cost of` `electric service.` `(E) Analysis of how the cost of procuring` `additional cost-effective energy efficiency measures` `compares over the life of the measures to the` `prevailing cost of comparable supply.` `(F) An energy savings goal, expressed in` `megawatt-hours, for the year in which the measures will` `be implemented.` `(G) For each expanded or new program, the estimated` `amount that the program may reduce the agency's need to` `procure supply.` ``In preparing such assessments, a utility shall conduct` `an annual solicitation process for purposes of requesting` `proposals from third-party vendors, the results of which` `shall be provided to the Agency as part of the assessment,` `including documentation of all bids received. The utility` `shall develop requests for proposals consistent with the` `manner in which it develops requests for proposals under` `plans approved pursuant to Section 8-103 of this Act, which` `considers input from the Agency and interested` `stakeholders.` ``(4) The Illinois Power Agency shall include in the` `procurement plan prepared pursuant to paragraph (2) of` `subsection (d) of Section 16-111.5 of this Act energy` `efficiency programs and measures it determines are` `cost-effective and the associated annual energy savings` `goal included in the annual solicitation process and` `assessment submitted pursuant to paragraph (3) of this` `subsection (a).` ``(5) Pursuant to paragraph (4) of subsection (d) of` `Section 16-111.5 of this Act, the Commission shall also` `approve the energy efficiency programs and measures` `included in the procurement plan, including the annual` `energy savings goal, if the Commission determines they` `fully capture the potential for all achievable` `cost-effective savings, to the extent practicable, and` `otherwise satisfy the requirements of Section 8-103 of this` `Act.` ``In the event the Commission approves the procurement of` `additional energy efficiency, it shall reduce the amount of` `power to be procured under the procurement plan to reflect` `the additional energy efficiency and shall direct the` `utility to undertake the procurement of such energy` `efficiency, which shall not be subject to the requirements` `of subsection (e) of Section 16-111.5 of this Act. The` `utility shall consider input from the Agency and interested` `stakeholders on the procurement and administration` `process.``The requirements set forth in paragraphs (1)` `through (5) of this subsection (a) shall terminate after` `the filing of the procurement plan in 2015, and no energy` `efficiency shall be procured by the Agency thereafter.` `Energy efficiency programs approved previously under this` `Section shall terminate no later than December 31, 2017. ``(6) An electric utility shall recover its costs` `incurred under this Section related to the implementation` `of energy efficiency programs and measures approved by the` `Commission in its order approving the procurement plan` `under Section 16-111.5 of this Act, including, but not` `limited to, all costs associated with complying with this` `Section and all start-up and administrative costs and the` `costs for any evaluation, measurement, and verification of` `the measures, from all retail customers whose electric` `service has not been declared competitive under Section` `16-113 of this Act and who are eligible to purchase power` `and energy from the utility under fixed-price bundled` `service tariffs, regardless of whether such customers` `actually do purchase such power and energy from the utility` `through the automatic adjustment clause tariff established` `pursuant to Section 8-103 of this Act, provided, however,` `that the limitations described in subsection (d) of that` `Section shall not apply to the costs incurred pursuant to` `this Section or Section 16-111.7 of this Act.` (b) For purposes of this Section, the term "energy` `efficiency" shall have the meaning set forth in Section 1-10 of` `the Illinois Power Agency Act, and the term "cost-effective"` `shall have the meaning set forth in subsection (a) of Section` `8-103 of this Act. (c) The changes to this Section made by this amendatory Act` `of the 99th General Assembly shall not interfere with existing` `contracts executed under a Commission order entered under this` `Section. (d)(1) For those electric utilities subject to the` `requirements of Section 8-103B of this Act, the contracts` `governing the energy efficiency programs and measures approved` `by the Commission in its order approving the procurement plan` `for the period June 1, 2016 through May 31, 2017 may be` `extended through December 31, 2017 so that the energy` `efficiency programs subject to such contracts and approved in` `such plan continue to be offered during the period June 1, 2017` `through December 31, 2017. Each such utility is authorized to` `increase, on a pro rata basis, the energy savings goals and` `budgets approved under this Section to reflect the additional 7` `months of implementation of the energy efficiency programs and` `measures. ``(2) If the Illinois Power Agency filed with the` `Commission, under Section 16-111.5 of this Act, its` `proposed procurement plan for the period commencing June 1,` `2017, and the Commission has not yet entered its final` `order approving such plan on or before the effective date` `of this amendatory Act of the 99th General Assembly, then` `the Illinois Power Agency shall file a notice of withdrawal` `with the Commission to withdraw the proposed energy` `efficiency programs to be approved under such plan. Upon` `receipt of such notice, the Commission shall enter an order` `that approves the withdrawal of all proposed energy` `efficiency programs from the plan. The initially proposed` `energy efficiency programs shall not be approved or be the` `subject of any further hearing, investigation, proceeding,` `or order of any kind. ``(3) This amendatory Act of the 99th General Assembly` `preempts and supersedes any order entered by the Commission` `that approved the Illinois Power Agency's procurement plan` `for the period commencing June 1, 2017, to the extent` `inconsistent with the provisions of this amendatory Act of` `the 99th General Assembly. To the extent any such` `previously entered order approved energy efficiency` `programs under this Section, the portion of such order` `approving such programs shall be void, and the provisions` `of paragraph (1) of this subsection (d) shall apply. `(Source: P.A. 97-616, eff. 10-26-11; 97-824, eff. 7-18-12.)` (220 ILCS 5/16-111.7) Sec. 16-111.7.``On-bill financing program; electric` `utilities.` (a) The Illinois General Assembly finds that Illinois homes` `and businesses have the potential to save energy through` `conservation and cost-effective energy efficiency measures.` `Programs created pursuant to this Section will allow utility` `customers to purchase cost-effective energy efficiency` `measures, including measures set forth in a` `Commission-approved energy efficiency and demand-response plan` `under Section 8-103``or 8-103B``of this Act, with no required` `initial upfront payment, and to pay the cost of those products` `and services over time on their utility bill.` (b) Notwithstanding any other provision of this Act, an` `electric utility serving more than 100,000 customers on January` `1, 2009 shall offer a Commission-approved on-bill financing` `program ("program") that allows its eligible retail customers,` `as that term is defined in Section 16-111.5 of this Act, who` `own a residential single family home, duplex, or other` `residential building with 4 or less units, or condominium at` `which the electric service is being provided (i) to borrow` `funds from a third party lender in order to purchase electric` `energy efficiency measures approved under the program for` `installation in such home or condominium without any required` `upfront payment and (ii) to pay back such funds over time` `through the electric utility's bill. Based upon the process` `described in subsection (b-5) of this Section, small commercial` `customers who own the premises at which electric service is` `being provided may be included in such program. After receiving` `a request from an electric utility for approval of a proposed` `program and tariffs pursuant to this Section, the Commission` `shall render its decision within 120 days. If no decision is` `rendered within 120 days, then the request shall be deemed to` `be approved.` Beginning no later than December 31, 2013, an electric` `utility subject to this subsection (b) shall also offer its` `program to eligible retail customers that own multifamily` `residential or mixed-use buildings with no more than 50` `residential units, provided, however, that such customers must` `either be a residential customer or small commercial customer` `and may not use the program in such a way that repayment of the` `cost of energy efficiency measures is made through tenants'` `utility bills. An electric utility may impose a per site loan` `limit not to exceed $150,000. The program, and loans issued` `thereunder, shall only be offered to customers of the utility` `that meet the requirements of this Section and that also have` `an electric service account at the premises where the energy` `efficiency measures being financed shall be installed.` `Beginning no later than 2 years after the effective date of` `this amendatory Act of the 99th General Assembly, the 50` `residential unit limitation described in this paragraph shall` `no longer apply, and the utility shall replace the per site` `loan limit of $150,000 with a loan limit that correlates to a` `maximum monthly payment that does not exceed 50% of the` `customer's average utility bill over the prior 12-month period.` Beginning no later than 2 years after the effective date of` `this amendatory Act of the 99th General Assembly, an electric` `utility subject to this subsection (b) shall also offer its` `program to eligible retail customers that are Unit Owners'` `Associations, as defined in subsection (o) of Section 2 of the` `Condominium Property Act, or Master Associations, as defined in` `subsection (u) of the Condominium Property Act. However, such` `customers must either be residential customers or small` `commercial customers and may not use the program in such a way` `that repayment of the cost of energy efficiency measures is` `made through unit owners' utility bills. The program and loans` `issued under the program shall only be offered to customers of` `the utility that meet the requirements of this Section and that` `also have an electric service account at the premises where the` `energy efficiency measures being financed shall be installed. For purposes of this Section, "small commercial customer"` `means, for an electric utility serving more than 3,000,000` `retail customers, those customers having peak demand of less` `than 100 kilowatts, and, for an electric utility serving less` `than 3,000,000 retail customers, those customers having peak` `demand of less than 150 kilowatts; provided, however, that in` `the event the Commission, after the effective date of this` `amendatory Act of the 98th General Assembly, approves changes` `to a utility's tariffs that reflects new or revised demand` `criteria for the utility's customer rate classifications, then` `the utility may file a petition with the Commission to revise` `the applicable definition of a small commercial customer to` `reflect the new or revised demand criteria for the purposes of` `this Section. After notice and hearing, the Commission shall` `enter an order approving, or approving with modification, the` `revised definition within 60 days after the utility files the` `petition.` (b-5) Within 30 days after the effective date of this` `amendatory Act of the 96th General Assembly, the Commission` `shall convene a workshop process during which interested` `participants may discuss issues related to the program,` `including program design, eligible electric energy efficiency` `measures, vendor qualifications, and a methodology for` `ensuring ongoing compliance with such qualifications,` `financing, sample documents such as request for proposals,` `contracts and agreements, dispute resolution, pre-installment` `and post-installment verification, and evaluation. The` `workshop process shall be completed within 150 days after the` `effective date of this amendatory Act of the 96th General` `Assembly.` (c) Not later than 60 days following completion of the` `workshop process described in subsection (b-5) of this Section,` `each electric utility subject to subsection (b) of this Section` `shall submit a proposed program to the Commission that contains` `the following components:` ``(1) A list of recommended electric energy efficiency` `measures that will be eligible for on-bill financing. An` `eligible electric energy efficiency measure ("measure")` `shall be a product or service for which one or more of the` `following is true:` `(A) (blank);` `(B) the projected electricity savings (determined` `by rates in effect at the time of purchase) are` `sufficient to cover the costs of implementing the` `measures, including finance charges and any program` `fees not recovered pursuant to subsection (f) of this` `Section; or` `(C) the product or service is included in a` `Commission-approved energy efficiency and` `demand-response plan under Section 8-103``or 8-103B``of` `this Act.` ``(1.5) Beginning no later than 2 years after the` `effective date of this amendatory Act of the 99th General` `Assembly, an eligible electric energy efficiency measure` `(measure) shall be a product or service that qualifies` `under subparagraph (B) or (C) of paragraph (1) of this` `subsection (c) or for which one or more of the following is` `true:` `(A) a building energy assessment, performed by an` `energy auditor who is certified by the Building` `Performance Institute or who holds a similar` `certification, has recommended the product or service` `as likely to be cost effective over the course of its` `installed life for the building in which the measure is` `to be installed; or` `(B) the product or service is necessary to safely` `or correctly install to code or industry standard an` `efficiency measure, including, but not limited to,` `installation work; changes needed to plumbing or` `electrical connections; upgrades to wiring or` `fixtures; removal of hazardous materials; correction` `of leaks; changes to thermostats, controls, or similar` `devices; and changes to venting or exhaust` `necessitated by the measure. However, the costs of the` `product or service described in this subparagraph (B)` `shall not exceed 25% of the total cost of installing` `the measure. ``(2) The electric utility shall issue a request for` `proposals ("RFP") to lenders for purposes of providing` `financing to participants to pay for approved measures. The` `RFP criteria shall include, but not be limited to, the` `interest rate, origination fees, and credit terms. The` `utility shall select the winning bidders based on its` `evaluation of these criteria, with a preference for those` `bids containing the rates, fees, and terms most favorable` `to participants;` ``(3) The utility shall work with the lenders selected` `pursuant to the RFP process, and with vendors, to establish` `the terms and processes pursuant to which a participant can` `purchase eligible electric energy efficiency measures` `using the financing obtained from the lender. The vendor` `shall explain and offer the approved financing packaging to` `those customers identified in subsection (b) of this` `Section and shall assist customers in applying for` `financing. As part of the process, vendors shall also` `provide to participants information about any other` `incentives that may be available for the measures.` ``(4) The lender shall conduct credit checks or undertake` `other appropriate measures to limit credit risk, and shall` `review and approve or deny financing applications` `submitted by customers identified in subsection (b) of this` `Section. Following the lender's approval of financing and` `the participant's purchase of the measure or measures, the` `lender shall forward payment information to the electric` `utility, and the utility shall add as a separate line item` `on the participant's utility bill a charge showing the` `amount due under the program each month.` ``(5) A loan issued to a participant pursuant to the` `program shall be the sole responsibility of the` `participant, and any dispute that may arise concerning the` `loan's terms, conditions, or charges shall be resolved` `between the participant and lender. Upon transfer of the` `property title for the premises at which the participant` `receives electric service from the utility or the` `participant's request to terminate service at such` `premises, the participant shall pay in full its electric` `utility bill, including all amounts due under the program,` `provided that this obligation may be modified as provided` `in subsection (g) of this Section. Amounts due under the` `program shall be deemed amounts owed for residential and,` `as appropriate, small commercial electric service.` ``(6) The electric utility shall remit payment in full to` `the lender each month on behalf of the participant. In the` `event a participant defaults on payment of its electric` `utility bill, the electric utility shall continue to remit` `all payments due under the program to the lender, and the` `utility shall be entitled to recover all costs related to a` `participant's nonpayment through the automatic adjustment` `clause tariff established pursuant to Section 16-111.8 of` `this Act. In addition, the electric utility shall retain a` `security interest in the measure or measures purchased` `under the program, and the utility retains its right to` `disconnect a participant that defaults on the payment of` `its utility bill.` ``(7) The total outstanding amount financed under the` `program in this subsection and subsection (c-5) of this` `Section shall not exceed $2.5 million for an electric` `utility or electric utilities under a single holding` `company, provided that the electric utility or electric` `utilities may petition the Commission for an increase in` `such amount.``Beginning after the effective date of this` `amendatory Act of the 99th General Assembly, the total` `maximum outstanding amount financed under the program in` `this subsection and subsections (c-5) and (c-10) of this` `Section shall increase by $5,000,000 per year until such` `time as the total maximum outstanding amount financed` `reaches $20,000,000. For purposes of this Section,` `"maximum outstanding amount financed" means the sum of all` `principal that has been loaned and not yet repaid. (c-5) Within 120 days after the effective date of this` `amendatory Act of the 98th General Assembly, each electric` `utility subject to the requirements of this Section shall` `submit an informational filing to the Commission that describes` `its plan for implementing the provisions of this amendatory Act` `of the 98th General Assembly on or before December 31, 2013.` `Such filing shall also describe how the electric utility shall` `coordinate its program with any gas utility or utilities that` `provide gas service to buildings within the electric utility's` `service territory so that it is practical and feasible for the` `owner of a multifamily building to make a single application to` `access loans for both gas and electric energy efficiency` `measures in any individual building.` (c-10) No later than 365 days after the effective date of` `this amendatory Act of the 99th General Assembly, each electric` `utility subject to the requirements of this Section shall` `submit an informational filing to the Commission that describes` `its plan for implementing the provisions of this amendatory Act` `of the 99th General Assembly that were incorporated into this` `Section. Such filing shall also include the criteria to be used` `by the program for determining if measures to be financed are` `eligible electric energy efficiency measures, as defined by` `paragraph (1.5) of subsection (c) of this Section. (d) A program approved by the Commission shall also include` `the following criteria and guidelines for such program:` ``(1) guidelines for financing of measures installed` `under a program, including, but not limited to, RFP` `criteria and limits on both individual loan amounts and the` `duration of the loans;` ``(2) criteria and standards for identifying and` `approving measures;` ``(3) qualifications of vendors that will market or` `install measures, as well as a methodology for ensuring` `ongoing compliance with such qualifications;` ``(4) sample contracts and agreements necessary to` `implement the measures and program; and` ``(5) the types of data and information that utilities` `and vendors participating in the program shall collect for` `purposes of preparing the reports required under` `subsection (g) of this Section.` (e) The proposed program submitted by each electric utility` `shall be consistent with the provisions of this Section that` `define operational, financial and billing arrangements between` `and among program participants, vendors, lenders, and the` `electric utility.` (f) An electric utility shall recover all of the prudently` `incurred costs of offering a program approved by the Commission` `pursuant to this Section, including, but not limited to, all` `start-up and administrative costs and the costs for program` `evaluation. All prudently incurred costs under this Section` `shall be recovered from the residential and small commercial` `retail customer classes eligible to participate in the program` `through the automatic adjustment clause tariff established` `pursuant to Section 8-103``or 8-103B``of this Act.` (g) An independent evaluation of a program shall be` `conducted after 3 years of the program's operation. The` `electric utility shall retain an independent evaluator who` `shall evaluate the effects of the measures installed under the` `program and the overall operation of the program, including,` `but not limited to, customer eligibility criteria and whether` `the payment obligation for permanent electric energy` `efficiency measures that will continue to provide benefits of` `energy savings should attach to the meter location. As part of` `the evaluation process, the evaluator shall also solicit` `feedback from participants and interested stakeholders. The` `evaluator shall issue a report to the Commission on its` `findings no later than 4 years after the date on which the` `program commenced, and the Commission shall issue a report to` `the Governor and General Assembly including a summary of the` `information described in this Section as well as its` `recommendations as to whether the program should be` `discontinued, continued with modification or modifications or` `continued without modification, provided that any recommended` `modifications shall only apply prospectively and to measures` `not yet installed or financed.` (h) An electric utility offering a Commission-approved` `program pursuant to this Section shall not be required to` `comply with any other statute, order, rule, or regulation of` `this State that may relate to the offering of such program,` `provided that nothing in this Section is intended to limit the` `electric utility's obligation to comply with this Act and the` `Commission's orders, rules, and regulations, including Part` `280 of Title 83 of the Illinois Administrative Code.` (i) The source of a utility customer's electric supply` `shall not disqualify a customer from participation in the` `utility's on-bill financing program. Customers of alternative` `retail electric suppliers may participate in the program under` `the same terms and conditions applicable to the utility's` `supply customers. `(Source: P.A. 97-616, eff. 10-26-11; 98-586, eff. 8-27-13.)` (220 ILCS 5/16-115D)` Sec. 16-115D.``Renewable portfolio standard for alternative` `retail electric suppliers and electric utilities operating` `outside their service territories.` (a) An alternative retail electric supplier shall be` `responsible for procuring cost-effective renewable energy` `resources as required under item (5) of subsection (d) of` `Section 16-115 of this Act as outlined herein:` ``(1) The definition of renewable energy resources` `contained in Section 1-10 of the Illinois Power Agency Act` `applies to all renewable energy resources required to be` `procured by alternative retail electric suppliers.` ``(2)``Through May 31, 2017, the `The``quantity of renewable` `energy resources shall be measured as a percentage of the` `actual amount of metered electricity (megawatt-hours)` `delivered by the alternative retail electric supplier to` `Illinois retail customers during the 12-month period June 1` `through May 31, commencing June 1, 2009, and the comparable` `12-month period in each year thereafter except as provided` `in item (6) of this subsection (a).` ``(3)``Through May 31, 2017, the `The``quantity of renewable` `energy resources shall be in amounts at least equal to the` `annual percentages set forth in item (1) of subsection (c)` `of Section 1-75 of the Illinois Power Agency Act. At least` `60% of the renewable energy resources procured pursuant to` `items (1)``and `through``(3) of subsection (b) of this Section` `shall come from wind generation and, starting June 1, 2015,` `at least 6% of the renewable energy resources procured` `pursuant to items (1)``and `through``(3) of subsection (b) of` `this Section shall come from solar photovoltaics. If, in` `any given year, an alternative retail electric supplier` `does not purchase at least these levels of renewable energy` `resources, then the alternative retail electric supplier` `shall make alternative compliance payments, as described` `in subsection (d) of this Section.` ``(3.5) For the delivery year commencing June 1, 2017,` `the quantity of renewable energy resources shall be at` `least 13.0% of the uncovered amount of metered electricity` `(megawatt-hours) delivered by the alternative retail` `electric supplier to Illinois retail customers during the` `delivery year, which uncovered amount shall equal 50% of` `such metered electricity delivered by the alternative` `retail electric supplier. For the delivery year commencing` `June 1, 2018, the quantity of renewable energy resources` `shall be at least 14.5% of the uncovered amount of metered` `electricity (megawatt-hours) delivered by the alternative` `retail electric supplier to Illinois retail customers` `during the delivery year, which uncovered amount shall` `equal 25% of such metered electricity delivered by the` `alternative retail electric supplier. At least 32% of the` `renewable energy resources procured by the alternative` `retail electric supplier for its uncovered portion under` `this paragraph (3.5) shall come from wind or photovoltaic` `generation. The renewable energy resources procured under` `this paragraph (3.5) shall not include any resources from a` `facility whose costs were being recovered through rates` `regulated by any state or states on or after January 1,` `2017. ``(4) The quantity and source of renewable energy` `resources shall be independently verified through the PJM` `Environmental Information System Generation Attribute` `Tracking System (PJM-GATS) or the Midwest Renewable Energy` `Tracking System (M-RETS), which shall document the` `location of generation, resource type, month, and year of` `generation for all qualifying renewable energy resources` `that an alternative retail electric supplier uses to comply` `with this Section. No later than June 1, 2009, the Illinois` `Power Agency shall provide PJM-GATS, M-RETS, and` `alternative retail electric suppliers with all information` `necessary to identify resources located in Illinois,` `within states that adjoin Illinois or within portions of` `the PJM and MISO footprint in the United States that` `qualify under the definition of renewable energy resources` `in Section 1-10 of the Illinois Power Agency Act for` `compliance with this Section 16-115D. Alternative retail` `electric suppliers shall not be subject to the requirements` `in item (3) of subsection (c) of Section 1-75 of the` `Illinois Power Agency Act.` ``(5) All renewable energy credits used to comply with` `this Section shall be permanently retired.` ``(6) The required procurement of renewable energy` `resources by an alternative retail electric supplier shall` `apply to all metered electricity delivered to Illinois` `retail customers by the alternative retail electric` `supplier pursuant to contracts executed or extended after` `March 15, 2009.` (b)``Compliance obligations.` ``(1) Through May 31, 2017, an `An``alternative retail` `electric supplier shall comply with the renewable energy` `portfolio standards by making an alternative compliance` `payment, as described in subsection (d) of this Section, to` `cover at least one-half of the alternative retail electric` `supplier's compliance obligation``for the period prior to` `June 1, 2017.` ``(2) For the delivery years beginning June 1, 2017 and` `June 1, 2018, an alternative retail electric supplier need` `not make any alternative compliance payment to meet any` `portion of its compliance obligation, as set forth in` `paragraph (3.5) of subsection (a) of this Section.` ``(3) An alternative retail electric supplier shall use `and``any one or combination of the following means to cover` `the remainder of the alternative retail electric` `supplier's compliance obligation``, as set forth in` `paragraphs (3) and (3.5) of subsection (a) of this Section,` `not covered by an alternative compliance payment made under` `paragraphs (1) and (2) of this subsection (b) of this` `Section``:` `(A) `(1)``Generating electricity using renewable` `energy resources identified pursuant to item (4) of` `subsection (a) of this Section.` `(B) `(2)``Purchasing electricity generated using` `renewable energy resources identified pursuant to item` `(4) of subsection (a) of this Section through an energy` `contract.` `(C) `(3)``Purchasing renewable energy credits from` `renewable energy resources identified pursuant to item` `(4) of subsection (a) of this Section.` `(D) `(4)``Making an alternative compliance payment` `as described in subsection (d) of this Section.` (c) Use of renewable energy credits.` ``(1) Renewable energy credits that are not used by an` `alternative retail electric supplier to comply with a` `renewable portfolio standard in a compliance year may be` `banked and carried forward up to 2 12-month compliance` `periods after the compliance period in which the credit was` `generated for the purpose of complying with a renewable` `portfolio standard in those 2 subsequent compliance` `periods. For the 2009-2010 and 2010-2011 compliance` `periods, an alternative retail electric supplier may use` `renewable credits generated after December 31, 2008 and` `before June 1, 2009 to comply with this Section.` ``(2) An alternative retail electric supplier is` `responsible for demonstrating that a renewable energy` `credit used to comply with a renewable portfolio standard` `is derived from a renewable energy resource and that the` `alternative retail electric supplier has not used, traded,` `sold, or otherwise transferred the credit.` ``(3) The same renewable energy credit may be used by an` `alternative retail electric supplier to comply with a` `federal renewable portfolio standard and a renewable` `portfolio standard established under this Act. An` `alternative retail electric supplier that uses a renewable` `energy credit to comply with a renewable portfolio standard` `imposed by any other state may not use the same credit to` `comply with a renewable portfolio standard established` `under this Act.` (d) Alternative compliance payments.` ``(1) The Commission shall establish and post on its` `website, within 5 business days after entering an order` `approving a procurement plan pursuant to Section 1-75 of` `the Illinois Power Agency Act, maximum alternative` `compliance payment rates, expressed on a per kilowatt-hour` `basis, that will be applicable in the first compliance` `period following the plan approval. A separate maximum` `alternative compliance payment rate shall be established` `for the service territory of each electric utility that is` `subject to subsection (c) of Section 1-75 of the Illinois` `Power Agency Act. Each maximum alternative compliance` `payment rate shall be equal to the maximum allowable annual` `estimated average net increase due to the costs of the` `utility's purchase of renewable energy resources included` `in the amounts paid by eligible retail customers in` `connection with electric service, as described in item (2)` `of subsection (c) of Section 1-75 of the Illinois Power` `Agency Act for the compliance period, and as established in` `the approved procurement plan. Following each procurement` `event through which renewable energy resources are` `purchased for one or more of these utilities for the` `compliance period, the Commission shall establish and post` `on its website estimates of the alternative compliance` `payment rates, expressed on a per kilowatt-hour basis, that` `shall apply for that compliance period. Posting of the` `estimates shall occur no later than 10 business days` `following the procurement event, however, the Commission` `shall not be required to establish and post such estimates` `more often than once per calendar month. By July 1 of each` `year, the Commission shall establish and post on its` `website the actual alternative compliance payment rates` `for the preceding compliance year. For compliance years` `beginning prior to June 1, 2014, each alternative` `compliance payment rate shall be equal to the total amount` `of dollars that the utility contracted to spend on` `renewable resources, excepting the additional incremental` `cost attributable to solar resources, for the compliance` `period divided by the forecasted load of eligible retail` `customers, at the customers' meters, as previously` `established in the Commission-approved procurement plan` `for that compliance year. For compliance years commencing` `on or after June 1, 2014, each alternative compliance` `payment rate shall be equal to the total amount of dollars` `that the utility contracted to spend on all renewable` `resources for the compliance period divided by the` `forecasted load of``eligible``retail customers``for which the` `utility is procuring renewable energy resources in a given` `delivery year``, at the customers' meters, as previously` `established in the Commission-approved procurement plan` `for that compliance year. The actual alternative` `compliance payment rates may not exceed the maximum` `alternative compliance payment rates established for the` `compliance period. For purposes of this subsection (d), the` `term "eligible retail customers" has the same meaning as` `found in Section 16-111.5 of this Act.` ``(2) In any given compliance year, an alternative retail` `electric supplier may elect to use alternative compliance` `payments to comply with all or a part of the applicable` `renewable portfolio standard. In the event that an` `alternative retail electric supplier elects to make` `alternative compliance payments to comply with all or a` `part of the applicable renewable portfolio standard, such` `payments shall be made by September 1, 2010 for the period` `of June 1, 2009 to May 1, 2010 and by September 1 of each` `year thereafter for the subsequent compliance period, in` `the manner and form as determined by the Commission. Any` `election by an alternative retail electric supplier to use` `alternative compliance payments is subject to review by the` `Commission under subsection (e) of this Section.` ``(3) An alternative retail electric supplier's` `alternative compliance payments shall be computed` `separately for each electric utility's service territory` `within which the alternative retail electric supplier` `provided retail service during the compliance period,` `provided that the electric utility was subject to` `subsection (c) of Section 1-75 of the Illinois Power Agency` `Act. For each service territory, the alternative retail` `electric supplier's alternative compliance payment shall` `be equal to (i) the actual alternative compliance payment` `rate established in item (1) of this subsection (d),` `multiplied by (ii) the actual amount of metered electricity` `delivered by the alternative retail electric supplier to` `retail customers``for which the supplier has a compliance` `obligation``within the service territory during the` `compliance period, multiplied by (iii) the result of one` `minus the ratios of the quantity of renewable energy` `resources used by the alternative retail electric supplier` `to comply with the requirements of this Section within the` `service territory to the product of the percentage of` `renewable energy resources required under item (3)``or (3.5) `of subsection (a) of this Section and the actual amount of` `metered electricity delivered by the alternative retail` `electrical `electric``supplier to retail customers``for which` `the supplier has a compliance obligation``within the service` `territory during the compliance period.` ``(4)``Through May 31, 2017, all `All``alternative` `compliance payments by alternative retail electric` `suppliers shall be deposited in the Illinois Power Agency` `Renewable Energy Resources Fund and used to purchase` `renewable energy credits, in accordance with Section 1-56` `of the Illinois Power Agency Act. Beginning April 1, 2012` `and by April 1 of each year thereafter, the Illinois Power` `Agency shall submit an annual report to the General` `Assembly, the Commission, and alternative retail electric` `suppliers that shall include, but not be limited to:` `(A) the total amount of alternative compliance` `payments received in aggregate from alternative retail` `electric suppliers by planning year for all previous` `planning years in which the alternative compliance` `payment was in effect;` `(B) the amount of those payments utilized to` `purchased renewable energy credits itemized by the` `date of each procurement in which the payments were` `utilized; and` `(C) the unused and remaining balance in the Agency` `Renewable Energy Resources Fund attributable to those` `payments.` ``(4.5) Beginning with the delivery year commencing June` `1, 2017, all alternative compliance payments by` `alternative retail electric suppliers shall be remitted to` `the applicable electric utility. To facilitate this` `remittance, each electric utility shall file a tariff with` `the Commission no later than 30 days following the` `effective date of this amendatory Act of the 99th General` `Assembly, which the Commission shall approve, after notice` `and hearing, no later than 45 days after its filing. The` `Illinois Power Agency shall use such payments to increase` `the amount of renewable energy resources otherwise to be` `procured under subsection (c) of Section 1-75 of the` `Illinois Power Agency Act. ``(5) The Commission, in consultation with the Illinois` `Power Agency, shall establish a process or proceeding to` `consider the impact of a federal renewable portfolio` `standard, if enacted, on the operation of the alternative` `compliance mechanism, which shall include, but not be` `limited to, developing, to the extent permitted by the` `applicable federal statute, an appropriate methodology to` `apportion renewable energy credits retired as a result of` `alternative compliance payments made in accordance with` `this Section. The Commission shall commence any such` `process or proceeding within 35 days after enactment of a` `federal renewable portfolio standard.` (e) Each alternative retail electric supplier shall, by` `September 1, 2010 and by September 1 of each year thereafter,` `prepare and submit to the Commission a report, in a format to` `be specified by the Commission``on or before December 31, 2009``,` `that provides information certifying compliance by the` `alternative retail electric supplier with this Section,` `including copies of all PJM-GATS and M-RETS reports, and` `documentation relating to banking, retiring renewable energy` `credits, and any other information that the Commission` `determines necessary to ensure compliance with this Section.` An alternative retail electric supplier may file` `commercially or financially sensitive information or trade` `secrets with the Commission as provided under the rules of the` `Commission. To be filed confidentially, the information shall` `be accompanied by an affidavit that sets forth both the reasons` `for the confidentiality and a public synopsis of the` `information.` (f) The Commission may initiate a contested case to review` `allegations that the alternative retail electric supplier has` `violated this Section, including an order issued or rule` `promulgated under this Section. In any such proceeding, the` `alternative retail electric supplier shall have the burden of` `proof. If the Commission finds, after notice and hearing, that` `an alternative retail electric supplier has violated this` `Section, then the Commission shall issue an order requiring the` `alternative retail electric supplier to:` ``(1) immediately comply with this Section; and` ``(2) if the violation involves a failure to procure the` `requisite quantity of renewable energy resources or pay the` `applicable alternative compliance payment by the annual` `deadline, the Commission shall require the alternative` `retail electric supplier to double the applicable` `alternative compliance payment that would otherwise be` `required to bring the alternative retail electric supplier` `into compliance with this Section.` If an alternative retail electric supplier fails to comply` `with the renewable energy resource portfolio requirement in` `this Section more than once in a 5-year period, then the` `Commission shall revoke the alternative electric supplier's` `certificate of service authority. The Commission shall not` `accept an application for a certificate of service authority` `from an alternative retail electric supplier that has lost` `certification under this subsection (f), or any corporate` `affiliate thereof, for at least one year after the date of` `revocation.` (g) All of the provisions of this Section apply to electric` `utilities operating outside their service area except under` `item (2) of subsection (a) of this Section the quantity of` `renewable energy resources shall be measured as a percentage of` `the actual amount of electricity (megawatt-hours) supplied in` `the State outside of the utility's service territory during the` `12-month period June 1 through May 31, commencing June 1, 2009,` `and the comparable 12-month period in each year thereafter` `except as provided in item (6) of subsection (a) of this` `Section.` If any such utility fails to procure the requisite quantity` `of renewable energy resources by the annual deadline, then the` `Commission shall require the utility to double the alternative` `compliance payment that would otherwise be required to bring` `the utility into compliance with this Section.` If any such utility fails to comply with the renewable` `energy resource portfolio requirement in this Section more than` `once in a 5-year period, then the Commission shall order the` `utility to cease all sales outside of the utility's service` `territory for a period of at least one year.` (h) The provisions of this Section and the provisions of` `subsection (d) of Section 16-115 of this Act relating to` `procurement of renewable energy resources shall not apply to an` `alternative retail electric supplier that operates a combined` `heat and power system in this State or that has a corporate` `affiliate that operates such a combined heat and power system` `in this State that supplies electricity primarily to or for the` `benefit of: (i) facilities owned by the supplier, its` `subsidiary, or other corporate affiliate; (ii) facilities` `electrically integrated with the electrical system of` `facilities owned by the supplier, its subsidiary, or other` `corporate affiliate; or (iii) facilities that are adjacent to` `the site on which the combined heat and power system is` `located. (i) The obligations of alternative retail electric` `suppliers and electric utilities operating outside their` `service territories to procure renewable energy resources,` `make alternative compliance payments, and file annual reports,` `and the obligations of the Commission to determine and post` `alternative compliance payment rates, shall terminate after` `May 31, 2019, provided that alternative retail electric` `suppliers and electric utilities operating outside their` `service territories shall be obligated to make all alternative` `compliance payments that they were obligated to pay for periods` `through and including May 31, 2019, but were not paid as of` `that date. The Commission shall continue to enforce the payment` `of unpaid alternative compliance payments in accordance with` `subsections (f) and (g) of this Section. All alternative` `compliance payments made after May 31, 2016 shall be remitted` `to the applicable electric utility and used to purchase` `renewable energy credits, in accordance with Section 1-75 of` `the Illinois Power Agency Act.` This subsection (i) is intended to accommodate the` `transition to the procurement of renewable energy resources for` `all retail customers in the amounts specified under subsection` `(c) of Section 1-75 of the Illinois Power Agency Act and` `Section 16-111.5 of this Act, including but not limited to the` `transition to a single charge applicable to all retail` `customers to recover the costs of these resources. Each` `alternative retail electric supplier shall certify in its` `annual reports filed pursuant to subsection (e) of this Section` `after May 31, 2019, that its retail customers are not paying` `the costs of alternative compliance payments or renewable` `energy resources that the alternative retail electric supplier` `is not required to remit or purchase under this Section. The` `Commission shall have the authority to initiate an emergency` `rulemaking to adopt rules regarding such certification. `(Source: P.A. 96-33, eff. 7-10-09; 96-159, eff. 8-10-09;` `96-1437, eff. 8-17-10; 97-658, eff. 1-13-12.)` (220 ILCS 5/16-119A) ` Sec. 16-119A.``Functional separation. (a) Within 90 days after the effective date of this` `amendatory Act of 1997, the Commission shall open a rulemaking` `proceeding to establish standards of conduct for every electric` `utility described in subsection (b). To create efficient` `competition between suppliers of generating services and` `sellers of such services at retail and wholesale, the rules` `shall allow all customers of a public utility that distributes` `electric power and energy to purchase electric power and energy` `from the supplier of their choice in accordance with the` `provisions of Section 16-104. In addition, the rules shall` `address relations between providers of any 2 services described` `in subsection (b) to prevent undue discrimination and promote` `efficient competition. Provided, however, that a proposed rule` `shall not be published prior to May 15, 1999. (b) The Commission shall also have the authority to` `investigate the need for, and adopt rules requiring, functional` `separation between the generation services and the delivery` `services of those electric utilities whose principal service` `area is in Illinois as necessary to meet the objective of` `creating efficient competition between suppliers of generating` `services and sellers of such services at retail and wholesale.` `After January 1, 2003, the Commission shall also have the` `authority to investigate the need for, and adopt rules` `requiring, functional separation between an electric utility's` `competitive and non-competitive services. (b-5) If there is a change in ownership of a majority of` `the voting capital stock of an electric utility or the` `ownership or control of any entity that owns or controls a` `majority of the voting capital stock of an electric utility,` `the electric utility shall have the right to file with the` `Commission a new plan. The newly filed plan shall supersede any` `plan previously approved by the Commission pursuant to this` `Section for that electric utility, subject to Commission` `approval. This subsection only applies to the extent that the` `Commission rules for the functional separation of delivery` `services and generation services provide an electric utility` `with the ability to select from 2 or more options to comply` `with this Section. The electric utility may file its revised` `plan with the Commission up to one calendar year after the` `conclusion of the sale, purchase, or any other transfer of` `ownership described in this subsection. In all other respects,` `an electric utility must comply with the Commission rules in` `effect under this Section. The Commission may promulgate rules` `to implement this subsection. This subsection shall have no` `legal effect after January 1, 2005. (c) In establishing or considering the need for rules under` `subsections (a) and (b), the Commission shall take into account` `the effects on the cost and reliability of service and the` `obligation of the utility to provide bundled service under this` `Act. The Commission shall adopt rules that are a cost effective` `means to ensure compliance with this Section. (d) Nothing in this Section shall be construed as imposing` `any requirements or obligations that are in conflict with` `federal law. (e) Notwithstanding anything to the contrary, an electric` `utility may market and promote the services, rates and programs` `authorized by Sections 16-107, and 16-108.6 of this Act.` `(Source: P.A. 92-756, eff. 8-2-02.) (220 ILCS 5/16-127) `` Sec. 16-127.``Environmental disclosure. (a) Effective January 1, 2013, every electric utility and` `alternative retail electric supplier shall provide the` `following information, to the maximum extent practicable, to` `its customers on a quarterly basis: `` ``(i) the known sources of electricity supplied,` `broken-out by percentages, of biomass power, coal-fired` `power, hydro power, natural gas-fired power, nuclear` `power, oil-fired power, solar power, wind power and other` `resources, respectively; `` ``(ii) a``pie chart `pie-chart``that graphically depicts the` `percentages of the sources of the electricity supplied as` `set forth in subparagraph (i) of this subsection;``and ``(iii) a``pie chart `pie-chart``that graphically depicts` `the quantity of renewable energy resources procured` `pursuant to Section 1-75 of the Illinois Power Agency Act` `as a percentage of electricity supplied to serve eligible` `retail customers as defined in Section 16-111.5(a) of this` `Act``; and``.` ``(iv) after May, 31, 2017, a pie chart that graphically` `depicts the quantity of zero emission credits from zero` `emission facilities procured under Section 1-75 of the` `Illinois Power Agency Act as a percentage of the actual` `load of retail customers within its service area. (b) In addition, every electric utility and alternative` `retail electric supplier shall provide, to the maximum extent` `practicable, to its customers on a quarterly basis, a` `standardized chart in a format to be determined by the` `Commission in a rule following notice and hearings which` `provides the amounts of carbon dioxide, nitrogen oxides and` `sulfur dioxide emissions and nuclear waste attributable to the` `known sources of electricity supplied as set forth in` `subparagraph (i) of subsection (a) of this Section. (c) The electric utilities and alternative retail electric` `suppliers may provide their customers with such other` `information as they believe relevant to the information` `required in subsections (a) and (b) of this Section. All of the` `information required in subsections (a) and (b) of this Section` `shall be made available by the electric utilities or` `alternative retail electric suppliers either in an electronic` `medium, such as on a website or by electronic mail, or through` `the U.S. Postal Service. (d) For the purposes of subsection (a) of this Section,` `"biomass" means dedicated crops grown for energy production and` `organic wastes. (e) All of the information provided in subsections (a) and` `(b) of this Section shall be presented to the Commission for` `inclusion in its World Wide Web Site. `(Source: P.A. 97-1092, eff. 1-1-13.) (220 ILCS 5/16-128A)` Sec. 16-128A.``Certification of installers, maintainers, or` `repairers.` (a) Within 18 months of the effective date of this` `amendatory Act of the 97th General Assembly, the Commission` `shall adopt rules, including emergency rules, establishing` `certification requirements ensuring that entities installing` `distributed generation facilities are in compliance with the` `requirements of subsection (a) of Section 16-128 of this Act.` For purposes of this Section, the phrase "entities` `installing distributed generation facilities" shall include,` `but not be limited to, all entities that are exempt from the` `definition of "alternative retail electric supplier" under` `item (v) of Section 16-102 of this Act. For purposes of this` `Section, the phrase "self-installer" means an individual who` `(i) leases or purchases a cogeneration facility for his or her` `own personal use and (ii) installs such cogeneration or` `self-generation facility on his or her own premises without the` `assistance of any other person.` (b) In addition to any authority granted to the Commission` `under this Act, the Commission is also authorized to: (1)` `determine which entities are subject to certification under` `this Section; (2) impose reasonable certification fees and` `penalties; (3) adopt disciplinary procedures; (4) investigate` `any and all activities subject to this Section, including` `violations thereof; (5) adopt procedures to issue or renew, or` `to refuse to issue or renew, a certification or to revoke,` `suspend, place on probation, reprimand, or otherwise` `discipline a certified entity under this Act or take other` `enforcement action against an entity subject to this Section;` `and (6) prescribe forms to be issued for the administration and` `enforcement of this Section.` (c) No electric utility shall provide a retail customer` `with net metering service related to interconnection of that` `customer's distributed generation facility unless the customer` `provides the electric utility with (i) a certification that the` `customer installing the distributed generation facility was a` `self-installer or (ii) evidence that the distributed` `generation facility was installed by an entity certified under` `this Section that is also in good standing with the Commission.` `For purposes of this subsection, a retail customer includes` `that customer's employees, officers, and agents. An electric` `utility shall file a tariff or tariffs with the Commission` `setting forth the documentation, as specified by Commission` `rule, that a retail customer must provide to an electric` `utility. The provisions of this subsection (c) shall apply on` `or after the effective date of the Commission's rules` `prescribed pursuant to subsection (a) of this Section.` (d) Within 180 days after the effective date of this` `amendatory Act of the 97th General Assembly, the Commission` `shall initiate a rulemaking proceeding to establish` `certification requirements that shall be applicable to persons` `or entities that install, maintain, or repair electric vehicle` `charging stations. The notification and certification` `requirements of this Section shall only be applicable to` `individuals or entities that perform work on or within an` `electric vehicle charging station, including, but not limited` `to, connection of power to an electric vehicle charging` `station.` For the purposes of this Section "electric vehicle charging` `station" means any facility or equipment that is used to charge` `a battery or other energy storage device of an electric` `vehicle. Rules regulating the installation, maintenance, or repair` `of electric vehicle charging stations, in which the Commission` `may establish separate requirements based upon the` `characteristics of electric vehicle charging stations, so long` `as it is in accordance with the requirements of subsection (a)` `of Section 16-128 and Section 16-128A of this Act, shall:` ``(1) establish a certification process for persons or` `entities that install, maintain, or repair of electric` `vehicle charging stations;` ``(2) require persons or entities that install,` `maintain, or repair electric vehicle stations to be` `certified to do business and to be bonded in the State;` ``(3) ensure that persons or entities that install,` `maintain, or repair electric vehicle charging stations` `have the requisite knowledge, skills, training,` `experience, and competence to perform functions in a safe` `and reliable manner as required under subsection (a) of` `Section 16-128 of this Act;` ``(4) impose reasonable certification fees and penalties` `on persons or entities that install, maintain, or repair of` `electric vehicle charging stations for noncompliance of` `the rules adopted under this subsection;` ``(5) ensure that all persons or entities that install,` `maintain, or repair electric vehicle charging stations` `conform to applicable building and electrical codes;` ``(6) ensure that all electric vehicle charging stations` `meet recognized industry standards as the Commission deems` `appropriate, such as the National Electric Code (NEC) and` `standards developed or created by the Institute of` `Electrical and Electronics Engineers (IEEE), the Electric` `Power Research Institute (EPRI), the Detroit Edison` `Institute (DTE), the Underwriters Laboratory (UL), the` `Society of Automotive Engineers (SAE), and the National` `Institute of Standards and Technology (NIST);` ``(7) include any additional requirements that the` `Commission deems reasonable to ensure that persons or` `entities that install, maintain, or repair electric` `vehicle charging stations meet adequate training,` `financial, and competency requirements;` ``(8) ensure that the obligations required under this` `Section and subsection (a) of Section 16-128 of this Act` `are met prior to the interconnection of any electric` `vehicle charging station;` ``(9) ensure electric vehicle charging stations` `installed by a self-installer are not used for any` `commercial purpose;` ``(10) establish an inspection procedure for the` `conversion of electric vehicle charging stations installed` `by a self-installer if it is determined that the` `self-installed electric vehicle charging station is being` `used for commercial purposes;` ``(11) establish the requirement that all persons or` `entities that install electric vehicle charging stations` `shall notify the servicing electric utility in writing of` `plans to install an electric vehicle charging station and` `shall notify the servicing electric utility in writing when` `installation is complete;` ``(12) ensure that all persons or entities that install,` `maintain, or repair electric vehicle charging stations` `obtain certificates of insurance in sufficient amounts and` `coverages that the Commission so determines and, if` `necessary as determined by the Commission, names the` `affected public utility as an additional insured; and` ``(13) identify and determine the training or other` `programs by which persons or entities may obtain the` `requisite training, skills, or experience necessary to` `achieve and maintain compliance with the requirements set` `forth in this subsection and subsection (a) of Section` `16-128 to install, maintain, or repair electric vehicle` `charging stations.` Within 18 months after the effective date of this` `amendatory Act of the 97th General Assembly, the Commission` `shall adopt rules, and may, if it deems necessary, adopt` `emergency rules, for the installation, maintenance, or repair` `of electric vehicle charging stations.` All retail customers who own, maintain, or repair an` `electric vehicle charging station shall provide the servicing` `electric utility (i) a certification that the customer` `installing the electric vehicle charging station was a` `self-installer or (ii) evidence that the electric vehicle` `charging station was installed by an entity certified under` `this subsection (d) that is also in good standing with the` `Commission. For purposes of this subsection (d), a retail` `customer includes that retail customer's employees, officers,` `and agents. If the electric vehicle charging station was not` `installed by a self-installer, then the person or entity that` `plans to install the electric vehicle charging station shall` `provide notice to the servicing electric utility prior to` `installation and when installation is complete and provide any` `other information required by the Commission's rules` `established under subsection (d) of this Section. An electric` `utility shall file a tariff or tariffs with the Commission` `setting forth the documentation, as specified by Commission` `rule, that a retail customer who owns, uses, operates, or` `maintains an electric vehicle charging station must provide to` `an electric utility.` For the purposes of this subsection, an electric vehicle` `charging station shall constitute a distribution facility or` `equipment as that term is used in subsection (a) of Section` `16-128 of this Act. The phrase "self-installer" means an` `individual who (i) leases or purchases an electric vehicle` `charging station for his or her own personal use and (ii)` `installs an electric vehicle charging station on his or her own` `premises without the assistance of any other person.` (e) Fees and penalties collected under this Section shall` `be deposited into the Public Utility Fund and used to fund the` `Commission's compliance with the obligations imposed by this` `Section.` (f) The rules established under subsection (d) of this` `Section shall specify the initial dates for compliance with the` `rules.` (g)``Within 18 months of the effective date of this` `amendatory Act of the 99th General Assembly, the Commission` `shall adopt rules, including emergency rules, establishing a` `process for entities installing a new utility-scale wind` `project or a new utility-scale solar project to certify` `compliance with the requirements of this Section. For purposes` `of this Section, the phrase "entities installing a new` `utility-scale wind project or a new utility-scale solar` `project" shall include, but is not limited to, any entity` `installing new wind projects or new photovoltaic projects as` `such terms are defined in subsection (c) of Section 1-75 of the` `Illinois Power Agency Act.` The process shall include an option to complete the` `certification electronically by completing forms on-line. An` `entity installing a new utility-scale wind project or a new` `utility-scale solar project shall be permitted to complete` `certification after the subject work has been completed. The` `Commission shall maintain on its website a list of entities` `installing new utility-scale wind projects or new` `utility-scale solar projects measures that have successfully` `completed the certification process.` (h) In addition to any authority granted to the Commission` `under this Act, the Commission is also authorized to: (1)` `determine which entities are subject to certification under` `subsection (g) of this Section; (2) impose reasonable` `certification fees and penalties; (3) adopt disciplinary` `procedures; (4) investigate any and all activities subject to` `subsection (g) or this subsection (h) of this Section,` `including violations thereof; (5) adopt procedures to issue or` `renew, or to refuse to issue or renew, a certification or to` `revoke, suspend, place on probation, reprimand, or otherwise` `discipline a certified entity under subsection (g) of this` `Section or take other enforcement action against an entity` `subject to subsection (g) or this subsection (h) of this` `Section; (6) prescribe forms to be issued for the` `administration and enforcement of subsection (g) and this` `subsection (h) of this Section; and (7) establish requirements` `to ensure that entities installing a new wind project or a new` `photovoltaic project have the requisite knowledge, skills,` `training, experience, and competence to perform in a safe and` `reliable manner as required by subsection (a) of Section 16-128` `of this Act. (i)``The certification of persons or entities that install,` `maintain, or repair``new wind projects, new photovoltaic` `projects,``distributed generation facilities``,``and electric` `vehicle charging stations as set forth in this Section is an` `exclusive power and function of the State. A home rule unit or` `other units of local government authority may subject persons` `or entities that install, maintain, or repair``new wind` `projects, new photovoltaic projects,``distributed generation` `facilities``,``or electric vehicle charging stations as set forth` `in this Section to any applicable local licensing, siting, and` `permitting requirements otherwise permitted under law so long` `as only Commission-certified persons or entities are` `authorized to install, maintain, or repair``new wind projects,` `new photovoltaic projects,``distributed generation facilities``, `or electric vehicle charging stations. This Section is a` `limitation under subsection (h) of Section 6 of Article VII of` `the Illinois Constitution on the exercise by home rule units of` `powers and functions exclusively exercised by the State.` `(Source: P.A. 97-616, eff. 10-26-11; 97-1128, eff. 8-28-12.)` (220 ILCS 5/16-128B new)` Sec. 16-128B.``Qualified energy efficiency installers.` (a) Within 18 months after the effective date of this` `amendatory Act of the 99th General Assembly, the Commission` `shall adopt rules, including emergency rules, establishing a` `process for entities installing energy efficiency measures to` `certify compliance with the requirements of this Section.` The process shall include an option to complete the` `certification electronically by completing forms on-line. An` `entity installing energy efficiency measures shall be` `permitted to complete the certification after the subject work` `has been completed.` The Commission shall maintain on its website a list of` `entities installing energy efficiency measures that have` `successfully completed the certification process.` (b) In addition to any authority granted to the Commission` `under this Act, the Commission may:` ``(1) determine which entities are subject to` `certification under this Section;` ``(2) impose reasonable certification fees and` `penalties;` ``(3) adopt disciplinary procedures;` ``(4) investigate any and all activities subject to this` `Section, including violations thereof;` ``(5) adopt procedures to issue or renew, or to refuse to` `issue or renew, a certification or to revoke, suspend,` `place on probation, reprimand, or otherwise discipline a` `certified entity under this Act or take other enforcement` `action against an entity subject to this Section; and` ``(6) prescribe forms to be issued for the administration` `and enforcement of this Section.` (c) An electric utility may not provide a retail customer` `with a rebate or other energy efficiency incentive for a` `measure that exceeds a minimal amount determined by the` `Commission unless the customer provides the electric utility` `with (1) a certification that the person installing the energy` `efficiency measure was a self-installer; or (2) evidence that` `the energy efficiency measure was installed by an entity` `certified under this Section that is also in good standing with` `the Commission.` (d) The Commission shall:` ``(1) require entities installing energy efficiency` `measures to be certified to do business and to be bonded in` `this State;` ``(2) ensure that entities installing energy efficiency` `measures have the requisite knowledge, skill, training,` `experience, and competence to perform functions in a safe` `and reliable manner as required under subsection (a) of` `Section 16-128 of this Act;` ``(3) ensure that entities installing energy efficiency` `measures conform to applicable building and electrical` `codes;` ``(4) ensure that all entities installing energy` `efficiency measures meet recognized industry standards as` `the Commission deems appropriate;` ``(5) include any additional requirements that the` `Commission deems reasonable to ensure that entities` `installing energy efficiency measures meet adequate` `training, financial, and competency requirements;` ``(6) ensure that all entities installing energy` `efficiency measures obtain certificates of insurance in` `sufficient amounts and coverages that the Commission so` `determines; and` ``(7) identify and determine the training or other` `programs by which persons or entities may obtain the` `requisite training, skill, or experience necessary to` `achieve and maintain compliance with the requirements of` `this Section.` (e) Fees and penalties collected under this Section shall` `be deposited into the Public Utility Fund and used to fund the` `Commission's compliance with the obligations imposed by this` `Section.` (f) The rules adopted under this Section shall specify the` `initial dates for compliance with the rules.` (g) For purposes of this Section, entities installing` `energy efficiency measures shall endeavor to support the` `diversity goals of this State by attracting, developing,` `retaining, and providing opportunities to employees of all` `backgrounds and by supporting female-owned, minority-owned,` `veteran-owned, and small businesses.` Section 20.``The Energy Assistance Act is amended by` `changing Sections 13 and 18 as follows:` ` (305 ILCS 20/13) ` (Section scheduled to be repealed on December 31, 2018)` Sec. 13.``Supplemental Low-Income Energy Assistance Fund. (a) The Supplemental Low-Income Energy Assistance Fund is` `hereby created as a special fund in the State Treasury. The` `Supplemental Low-Income Energy Assistance Fund is authorized` `to receive moneys from voluntary donations from individuals,` `foundations, corporations, and other sources, moneys received` `pursuant to Section 17, and, by statutory deposit, the moneys` `collected pursuant to this Section. The Fund is also authorized` `to receive voluntary donations from individuals, foundations,` `corporations, and other sources, as well as contributions made` `in accordance with Section 507MM of the Illinois Income Tax` `Act. Subject to appropriation, the Department shall use moneys` `from the Supplemental Low-Income Energy Assistance Fund for` `payments to electric or gas public utilities, municipal` `electric or gas utilities, and electric cooperatives on behalf` `of their customers who are participants in the program` `authorized by Sections 4 and 18 of this Act, for the provision` `of weatherization services and for administration of the` `Supplemental Low-Income Energy Assistance Fund. The yearly` `expenditures for weatherization may not exceed 10% of the` `amount collected during the year pursuant to this Section. The` `yearly administrative expenses of the Supplemental Low-Income` `Energy Assistance Fund may not exceed 10% of the amount` `collected during that year pursuant to this Section, except` `when unspent funds from the Supplemental Low-Income Energy` `Assistance Fund are reallocated from a previous year; any` `unspent balance of the 10% administrative allowance may be` `utilized for administrative expenses in the year they are` `reallocated. (b) Notwithstanding the provisions of Section 16-111 of the` `Public Utilities Act but subject to subsection (k) of this` `Section, each public utility, electric cooperative, as defined` `in Section 3.4 of the Electric Supplier Act, and municipal` `utility, as referenced in Section 3-105 of the Public Utilities` `Act, that is engaged in the delivery of electricity or the` `distribution of natural gas within the State of Illinois shall,` `effective January 1, 1998, assess each of its customer accounts` `a monthly Energy Assistance Charge for the Supplemental` `Low-Income Energy Assistance Fund. The delivering public` `utility, municipal electric or gas utility, or electric or gas` `cooperative for a self-assessing purchaser remains subject to` `the collection of the fee imposed by this Section. The monthly` `charge shall be as follows: ``(1) $0.48 per month on each account for residential` `electric service; ``(2) $0.48 per month on each account for residential gas` `service; ``(3) $4.80 per month on each account for non-residential` `electric service which had less than 10 megawatts of peak` `demand during the previous calendar year; ``(4) $4.80 per month on each account for non-residential` `gas service which had distributed to it less than 4,000,000` `therms of gas during the previous calendar year; ``(5) $360 per month on each account for non-residential` `electric service which had 10 megawatts or greater of peak` `demand during the previous calendar year; and ``(6) $360 per month on each account for non-residential` `gas service which had 4,000,000 or more therms of gas` `distributed to it during the previous calendar year.` The incremental change to such charges imposed by this` `amendatory Act of the 96th General Assembly shall not (i) be` `used for any purpose other than to directly assist customers` `and (ii) be applicable to utilities serving less than 100,000` `customers in Illinois on January 1, 2009.` In addition, electric and gas utilities have committed, and` `shall contribute, a one-time payment of $22 million to the` `Fund, within 10 days after the effective date of the tariffs` `established pursuant to Sections 16-111.8 and 19-145 of the` `Public Utilities Act to be used for the Department's cost of` `implementing the programs described in Section 18 of this` `amendatory Act of the 96th General Assembly, the Arrearage` `Reduction Program described in Section 18, and the programs` `described in Section 8-105 of the Public Utilities Act. If a` `utility elects not to file a rider within 90 days after the` `effective date of this amendatory Act of the 96th General` `Assembly, then the contribution from such utility shall be made` `no later than February 1, 2010. (c) For purposes of this Section: ``(1) "residential electric service" means electric` `utility service for household purposes delivered to a` `dwelling of 2 or fewer units which is billed under a` `residential rate, or electric utility service for` `household purposes delivered to a dwelling unit or units` `which is billed under a residential rate and is registered` `by a separate meter for each dwelling unit; ``(2) "residential gas service" means gas utility` `service for household purposes distributed to a dwelling of` `2 or fewer units which is billed under a residential rate,` `or gas utility service for household purposes distributed` `to a dwelling unit or units which is billed under a` `residential rate and is registered by a separate meter for` `each dwelling unit; ``(3) "non-residential electric service" means electric` `utility service which is not residential electric service;` `and ``(4) "non-residential gas service" means gas utility` `service which is not residential gas service. (d) Within 30 days after the effective date of this` `amendatory Act of the 96th General Assembly, each public` `utility engaged in the delivery of electricity or the` `distribution of natural gas shall file with the Illinois` `Commerce Commission tariffs incorporating the Energy` `Assistance Charge in other charges stated in such tariffs,` `which shall become effective no later than the beginning of the` `first billing cycle following such filing. (e) The Energy Assistance Charge assessed by electric and` `gas public utilities shall be considered a charge for public` `utility service. (f) By the 20th day of the month following the month in` `which the charges imposed by the Section were collected, each` `public utility, municipal utility, and electric cooperative` `shall remit to the Department of Revenue all moneys received as` `payment of the Energy Assistance Charge on a return prescribed` `and furnished by the Department of Revenue showing such` `information as the Department of Revenue may reasonably` `require; provided, however, that a utility offering an` `Arrearage Reduction Program``or Supplemental Arrearage` `Reduction Program``pursuant to Section 18 of this Act shall be` `entitled to net those amounts necessary to fund and recover the` `costs of such``Programs `Program``as authorized by that Section` `that is no more than the incremental change in such Energy` `Assistance Charge authorized by``Public Act 96-33 `this` `amendatory Act of the 96th General Assembly``. If a customer` `makes a partial payment, a public utility, municipal utility,` `or electric cooperative may elect either: (i) to apply such` `partial payments first to amounts owed to the utility or` `cooperative for its services and then to payment for the Energy` `Assistance Charge or (ii) to apply such partial payments on a` `pro-rata basis between amounts owed to the utility or` `cooperative for its services and to payment for the Energy` `Assistance Charge. (g) The Department of Revenue shall deposit into the` `Supplemental Low-Income Energy Assistance Fund all moneys` `remitted to it in accordance with subsection (f) of this` `Section; provided, however, that the amounts remitted by each` `utility shall be used to provide assistance to that utility's` `customers. The utilities shall coordinate with the Department` `to establish an equitable and practical methodology for` `implementing this subsection (g) beginning with the 2010` `program year. (h) On or before December 31, 2002, the Department shall` `prepare a report for the General Assembly on the expenditure of` `funds appropriated from the Low-Income Energy Assistance Block` `Grant Fund for the program authorized under Section 4 of this` `Act. (i) The Department of Revenue may establish such rules as` `it deems necessary to implement this Section. (j) The Department of Commerce and Economic Opportunity may` `establish such rules as it deems necessary to implement this` `Section. (k) The charges imposed by this Section shall only apply to` `customers of municipal electric or gas utilities and electric` `or gas cooperatives if the municipal electric or gas utility or` `electric or gas cooperative makes an affirmative decision to` `impose the charge. If a municipal electric or gas utility or an` `electric cooperative makes an affirmative decision to impose` `the charge provided by this Section, the municipal electric or` `gas utility or electric cooperative shall inform the Department` `of Revenue in writing of such decision when it begins to impose` `the charge. If a municipal electric or gas utility or electric` `or gas cooperative does not assess this charge, the Department` `may not use funds from the Supplemental Low-Income Energy` `Assistance Fund to provide benefits to its customers under the` `program authorized by Section 4 of this Act. In its use of federal funds under this Act, the Department` `may not cause a disproportionate share of those federal funds` `to benefit customers of systems which do not assess the charge` `provided by this Section. This Section is repealed``on January 1, 2025 `effective` `December 31, 2018``unless renewed by action of the General` `Assembly.``The General Assembly shall consider the results of` `the evaluations described in Section 8 in its deliberations. `(Source: P.A. 98-429, eff. 8-16-13; 99-457, eff. 1-1-16``.) (305 ILCS 20/18) Sec. 18.``Financial assistance; payment plans.` (a) The Percentage of Income Payment Plan (PIPP or PIP` `Plan) is hereby created as a mandatory bill payment assistance` `program for low-income residential customers of utilities` `serving more than 100,000 retail customers as of January 1,` `2009. The PIP Plan will:` ``(1) bring participants' gas and electric bills into the` `range of affordability;` ``(2) provide incentives for participants to make timely` `payments;` ``(3) encourage participants to reduce usage and` `participate in conservation and energy efficiency measures` `that reduce the customer's bill and payment requirements;` `and` ``(4) identify participants whose homes are most in need` `of weatherization.` (b) For purposes of this Section:` ``(1) "LIHEAP" means the energy assistance program` `established under the Illinois Energy Assistance Act and` `the Low-Income Home Energy Assistance Act of 1981.` ``(2) "Plan participant" is an eligible participant who` `is also eligible for the PIPP and who will receive either a` `percentage of income payment credit under the PIPP criteria` `set forth in this Act or a benefit pursuant to Section 4 of` `this Act. Plan participants are a subset of eligible` `participants.` ``(3) "Pre-program arrears" means the amount a plan` `participant owes for gas or electric service at the time` `the participant is determined to be eligible for the PIPP` `or the program set forth in Section 4 of this Act.` ``(4) "Eligible participant" means any person who has` `applied for, been accepted and is receiving residential` `service from a gas or electric utility and who is also` `eligible for LIHEAP.` (c) The PIP Plan shall be administered as follows:` ``(1) The Department shall coordinate with Local` `Administrative Agencies (LAAs), to determine eligibility` `for the Illinois Low Income Home Energy Assistance Program` `(LIHEAP) pursuant to the Energy Assistance Act, provided` `that eligible income shall be no more than 150% of the` `poverty level. Applicants will be screened to determine` `whether the applicant's projected payments for electric` `service or natural gas service over a 12-month period` `exceed the criteria established in this Section. To` `maintain the financial integrity of the program, the` `Department may limit eligibility to households with income` `below 125% of the poverty level.` ``(2) The Department shall establish the percentage of` `income formula to determine the amount of a monthly credit,` `not to exceed $150 per month per household, not to exceed` `$1,800 annually, that will be applied to PIP Plan` `participants' utility bills based on the portion of the` `bill that is the responsibility of the participant provided` `that the percentage shall be no more than a total of 6% of` `the relevant income for gas and electric utility bills` `combined, but in any event no less than $10 per month,` `unless the household does not pay directly for heat, in` `which case its payment shall be 2.4% of income but in any` `event no less than $5 per month. The Department may` `establish a minimum credit amount based on the cost of` `administering the program and may deny credits to otherwise` `eligible participants if the cost of administering the` `credit exceeds the actual amount of any monthly credit to a` `participant. If the participant takes both gas and electric` `service, 66.67% of the credit shall be allocated to the` `entity that provides the participant's primary energy` `supply for heating. Each participant shall enter into a` `levelized payment plan for, as applicable, gas and electric` `service and such plans shall be implemented by the utility` `so that a participant's usage and required payments are` `reviewed and adjusted regularly, but no more frequently` `than quarterly. Nothing in this Section is intended to` `prohibit a customer, who is otherwise eligible for LIHEAP,` `from participating in the program described in Section 4 of` `this Act. Eligible participants who receive such a benefit` `shall be considered plan participants and shall be eligible` `to participate in the Arrearage Reduction Program` `described in item (5) of this subsection (c).` ``(3) The Department shall remit, through the LAAs, to` `the utility or participating alternative supplier that` `portion of the plan participant's bill that is not the` `responsibility of the participant. In the event that the` `Department fails to timely remit payment to the utility,` `the utility shall be entitled to recover all costs related` `to such nonpayment through the automatic adjustment clause` `tariffs established pursuant to Section 16-111.8 and` `Section 19-145 of the Public Utilities Act. For purposes of` `this item (3) of this subsection (c), payment is due on the` `date specified on the participant's bill. The Department,` `the Department of Revenue and LAAs shall adopt processes` `that provide for the timely payment required by this item` `(3) of this subsection (c).` ``(4) A plan participant is responsible for all actual` `charges for utility service in excess of the PIPP credit.` `Pre-program arrears that are included in the Arrearage` `Reduction Program described in item (5) of this subsection` `(c) shall not be included in the calculation of the` `levelized payment plan. Emergency or crisis assistance` `payments shall not affect the amount of any PIPP credit to` `which a participant is entitled.` ``(5) Electric and gas utilities subject to this Section` `shall implement an Arrearage Reduction Program (ARP) for` `plan participants as follows: for each month that a plan` `participant timely pays his or her utility bill, the` `utility shall apply a credit to a portion of the` `participant's pre-program arrears, if any, equal to` `one-twelfth of such arrearage provided that the total` `amount of arrearage credits shall equal no more than $1,000` `annually for each participant for gas and no more than` `$1,000 annually for each participant for electricity. In` `the third year of the PIPP, the Department, in consultation` `with the Policy Advisory Council established pursuant to` `Section 5 of this Act, shall determine by rule an` `appropriate per participant total cap on such amounts, if` `any. Those plan participants participating in the ARP shall` `not be subject to the imposition of any additional late` `payment fees on pre-program arrears covered by the ARP. In` `all other respects, the utility shall bill and collect the` `monthly bill of a plan participant pursuant to the same` `rules, regulations, programs and policies as applicable to` `residential customers generally. Participation in the` `Arrearage Reduction Program shall be limited to the maximum` `amount of funds available as set forth in subsection (f) of` `Section 13 of this Act. In the event any donated funds` `under Section 13 of this Act are specifically designated` `for the purpose of funding the ARP, the Department shall` `remit such amounts to the utilities upon verification that` `such funds are needed to fund the ARP.``Nothing in this` `Section shall preclude a utility from continuing to` `implement, and apply credits under, an ARP in the event` `that the PIPP or LIHEAP is suspended due to lack of funding` `such that the plan participant does not receive a benefit` `under either the PIPP or LIHEAP.` ``(5.5) In addition to the ARP described in paragraph (5)` `of this subsection (c), utilities may also implement a` `Supplemental Arrearage Reduction Program (SARP) for` `eligible participants who are not able to become plan` `participants due to PIPP timing or funding constraints. If` `a utility elects to implement a SARP, it shall be` `administered as follows: for each month that a SARP` `participant timely pays his or her utility bill, the` `utility shall apply a credit to a portion of the` `participant's pre-program arrears, if any, equal to` `one-twelfth of such arrearage, provided that the utility` `may limit the total amount of arrearage credits to no more` `than $1,000 annually for each participant for gas and no` `more than $1,000 annually for each participant for` `electricity. SARP participants shall not be subject to the` `imposition of any additional late payment fees on` `pre-program arrears covered by the SARP. In all other` `respects, the utility shall bill and collect the monthly` `bill of a SARP participant under the same rules,` `regulations, programs, and policies as applicable to` `residential customers generally. Participation in the SARP` `shall be limited to the maximum amount of funds available` `as set forth in subsection (f) of Section 13 of this Act.` `In the event any donated funds under Section 13 of this Act` `are specifically designated for the purpose of funding the` `SARP, the Department shall remit such amounts to the` `utilities upon verification that such funds are needed to` `fund the SARP. ``(6) The Department may terminate a plan participant's` `eligibility for the PIP Plan upon notification by the` `utility that the participant's monthly utility payment is` `more than 45 days past due.` ``(7) The Department, in consultation with the Policy` `Advisory Council, may adjust the number of PIP Plan` `participants annually, if necessary, to match the` `availability of funds``from LIHEAP``.``Any plan participant who` `qualifies for a PIPP credit under a utility's PIPP shall be` `entitled to participate in and receive a credit under such` `utility's ARP for so long as such utility has ARP funds` `available, regardless of whether the customer's` `participation under another utility's PIPP or ARP has been` `curtailed or limited because of a lack of funds. ``(8) The Department shall fully implement the PIPP at` `the earliest possible date it is able to effectively` `administer the PIPP. Within 90 days of the effective date` `of this amendatory Act of the 96th General Assembly, the` `Department shall, in consultation with utility companies,` `participating alternative suppliers, LAAs and the Illinois` `Commerce Commission (Commission), issue a detailed` `implementation plan which shall include detailed testing` `protocols and analysis of the capacity for implementation` `by the LAAs and utilities. Such consultation process also` `shall address how to implement the PIPP in the most` `cost-effective and timely manner, and shall identify` `opportunities for relying on the expertise of utilities,` `LAAs and the Commission. Following the implementation of` `the testing protocols, the Department shall issue a written` `report on the feasibility of full or gradual` `implementation. The PIPP shall be fully implemented by` `September 1, 2011, but may be phased in prior to that date.` ``(9) As part of the screening process established under` `item (1) of this subsection (c), the Department and LAAs` `shall assess whether any energy efficiency or demand` `response measures are available to the plan participant at` `no cost, and if so, the participant shall enroll in any` `such program for which he or she is eligible. The LAAs` `shall assist the participant in the applicable enrollment` `or application process.` ``(10) Each alternative retail electric and gas supplier` `serving residential customers shall elect whether to` `participate in the PIPP or ARP described in this Section.` `Any such supplier electing to participate in the PIPP shall` `provide to the Department such information as the` `Department may require, including, without limitation,` `information sufficient for the Department to determine the` `proportionate allocation of credits between the` `alternative supplier and the utility. If a utility in whose` `service territory an alternative supplier serves customers` `contributes money to the ARP fund which is not recovered` `from ratepayers, then an alternative supplier which` `participates in ARP in that utility's service territory` `shall also contribute to the ARP fund in an amount that is` `commensurate with the number of alternative supplier` `customers who elect to participate in the program.` (d) The Department, in consultation with the Policy` `Advisory Council, shall develop and implement a program to` `educate customers about the PIP Plan and about their rights and` `responsibilities under the percentage of income component. The` `Department, in consultation with the Policy Advisory Council,` `shall establish a process that LAAs shall use to contact` `customers in jeopardy of losing eligibility due to late` `payments. The Department shall ensure that LAAs are adequately` `funded to perform all necessary educational tasks.` (e) The PIPP shall be administered in a manner which` `ensures that credits to plan participants will not be counted` `as income or as a resource in other means-tested assistance` `programs for low-income households or otherwise result in the` `loss of federal or State assistance dollars for low-income` `households.` (f) In order to ensure that implementation costs are` `minimized, the Department and utilities shall work together to` `identify cost-effective ways to transfer information` `electronically and to employ available protocols that will` `minimize their respective administrative costs as follows:` ``(1) The Commission may require utilities to provide` `such information on customer usage and billing and payment` `information as required by the Department to implement the` `PIP Plan and to provide written notices and communications` `to plan participants.` ``(2) Each utility and participating alternative` `supplier shall file annual reports with the Department and` `the Commission that cumulatively summarize and update` `program information as required by the Commission's rules.` `The reports shall track implementation costs and contain` `such information as is necessary to evaluate the success of` `the PIPP.` ``(3) The Department and the Commission shall have the` `authority to promulgate rules and regulations necessary to` `execute and administer the provisions of this Section.` (g) Each utility shall be entitled to recover reasonable` `administrative and operational costs incurred to comply with` `this Section from the Supplemental Low Income Energy Assistance` `Fund. The utility may net such costs against monies it would` `otherwise remit to the Funds, and each utility shall include in` `the annual report required under subsection (f) of this Section` `an accounting for the funds collected. `(Source: P.A. 96-33, eff. 7-10-09.) Section 85.``The Public Utilities Act is amended by changing` `Section 2-202 as follows:` ` (220 ILCS 5/2-202) `(from Ch. 111 2/3, par. 2-202) ` Sec. 2-202.``Policy; Public Utility Fund; tax. (a) It is declared to be the public policy of this State` `that in order to maintain and foster the effective regulation` `of public utilities under this Act in the interests of the` `People of the State of Illinois and the public utilities as` `well, the public utilities subject to regulation under this Act` `and which enjoy the privilege of operating as public utilities` `in this State, shall bear the expense of administering this Act` `by means of a tax on such privilege measured by the annual` `gross revenue of such public utilities in the manner provided` `in this Section. For purposes of this Section, "expense of` `administering this Act" includes any costs incident to studies,` `whether made by the Commission or under contract entered into` `by the Commission, concerning environmental pollution problems` `caused or contributed to by public utilities and the means for` `eliminating or abating those problems. Such proceeds shall be` `deposited in the Public Utility Fund in the State treasury. (b) All of the ordinary and contingent expenses of the` `Commission incident to the administration of this Act shall be` `paid out of the Public Utility Fund except the compensation of` `the members of the Commission which shall be paid from the` `General Revenue Fund. Notwithstanding other provisions of this` `Act to the contrary, the ordinary and contingent expenses of` `the Commission incident to the administration of the Illinois` `Commercial Transportation Law may be paid from appropriations` `from the Public Utility Fund through the end of fiscal year` `1986. (c) A tax is imposed upon each public utility subject to` `the provisions of this Act equal to .08% of its gross revenue` `for each calendar year commencing with the calendar year` `beginning January 1, 1982, except that the Commission may, by` `rule, establish a different rate no greater than 0.1%. For` `purposes of this Section, "gross revenue" shall not include` `revenue from the production, transmission, distribution, sale,` `delivery, or furnishing of electricity. "Gross revenue" shall` `not include amounts paid by telecommunications retailers under` `the Telecommunications Infrastructure Maintenance Fee Act. (d) Annual gross revenue returns shall be filed in` `accordance with paragraph (1) or (2) of this subsection (d). `` ``(1) Except as provided in paragraph (2) of this` `subsection (d), on or before January 10 of each year each` `public utility subject to the provisions of this Act shall` `file with the Commission an estimated annual gross revenue` `return containing an estimate of the amount of its gross` `revenue for the calendar year commencing January 1 of said` `year and a statement of the amount of tax due for said` `calendar year on the basis of that estimate. Public` `utilities may also file revised returns containing updated` `estimates and updated amounts of tax due during the` `calendar year. These revised returns, if filed, shall form` `the basis for quarterly payments due during the remainder` `of the calendar year. In addition, on or before March 31 of` `each year, each public utility shall file an amended return` `showing the actual amount of gross revenues shown by the` `company's books and records as of December 31 of the` `previous year. Forms and instructions for such estimated,` `revised, and amended returns shall be devised and supplied` `by the Commission. `` ``(2) Beginning with returns due after January 1, 2002,` `the requirements of paragraph (1) of this subsection (d)` `shall not apply to any public utility in any calendar year` `for which the total tax the public utility owes under this` `Section is less than $10,000. For such public utilities` `with respect to such years, the public utility shall file` `with the Commission, on or before March 31 of the following` `year, an annual gross revenue return for the year and a` `statement of the amount of tax due for that year on the` `basis of such a return. Forms and instructions for such` `returns and corrected returns shall be devised and supplied` `by the Commission. (e) All returns submitted to the Commission by a public` `utility as provided in this subsection (e) or subsection (d) of` `this Section shall contain or be verified by a written` `declaration by an appropriate officer of the public utility` `that the return is made under the penalties of perjury. The` `Commission may audit each such return submitted and may, under` `the provisions of Section 5-101 of this Act, take such measures` `as are necessary to ascertain the correctness of the returns` `submitted. The Commission has the power to direct the filing of` `a corrected return by any utility which has filed an incorrect` `return and to direct the filing of a return by any utility` `which has failed to submit a return. A taxpayer's signing a` `fraudulent return under this Section is perjury, as defined in` `Section 32-2 of the Criminal Code of 2012. (f) (1) For all public utilities subject to paragraph (1)` `of subsection (d), at least one quarter of the annual amount of` `tax due under subsection (c) shall be paid to the Commission on` `or before the tenth day of January, April, July, and October of` `the calendar year subject to tax. In the event that an` `adjustment in the amount of tax due should be necessary as a` `result of the filing of an amended or corrected return under` `subsection (d) or subsection (e) of this Section, the amount of` `any deficiency shall be paid by the public utility together` `with the amended or corrected return and the amount of any` `excess shall, after the filing of a claim for credit by the` `public utility, be returned to the public utility in the form` `of a credit memorandum in the amount of such excess or be` `refunded to the public utility in accordance with the` `provisions of subsection (k) of this Section. However, if such` `deficiency or excess is less than $1, then the public utility` `need not pay the deficiency and may not claim a credit. (2) Any public utility subject to paragraph (2) of` `subsection (d) shall pay the amount of tax due under subsection` `(c) on or before March 31 next following the end of the` `calendar year subject to tax. In the event that an adjustment` `in the amount of tax due should be necessary as a result of the` `filing of a corrected return under subsection (e), the amount` `of any deficiency shall be paid by the public utility at the` `time the corrected return is filed. Any excess tax payment by` `the public utility shall be returned to it after the filing of` `a claim for credit, in the form of a credit memorandum in the` `amount of the excess. However, if such deficiency or excess is` `less than $1, the public utility need not pay the deficiency` `and may not claim a credit. (g) Each installment or required payment of the tax imposed` `by subsection (c) becomes delinquent at midnight of the date` `that it is due. Failure to make a payment as required by this` `Section shall result in the imposition of a late payment` `penalty, an underestimation penalty, or both, as provided by` `this subsection. The late payment penalty shall be the greater` `of: `` ``(1) $25 for each month or portion of a month that the` `installment or required payment is unpaid or `` ``(2) an amount equal to the difference between what` `should have been paid on the due date, based upon the most` `recently filed estimated, annual, or amended return, and` `what was actually paid, times 1%, for each month or portion` `of a month that the installment or required payment goes` `unpaid. This penalty may be assessed as soon as the` `installment or required payment becomes delinquent. The underestimation penalty shall apply to those public` `utilities subject to paragraph (1) of subsection (d) and shall` `be calculated after the filing of the amended return. It shall` `be imposed if the amount actually paid on any of the dates` `specified in subsection (f) is not equal to at least one-fourth` `of the amount actually due for the year, and shall equal the` `greater of: `` ``(1) $25 for each month or portion of a month that the` `amount due is unpaid or `` ``(2) an amount equal to the difference between what` `should have been paid, based on the amended return, and` `what was actually paid as of the date specified in` `subsection (f), times a percentage equal to 1/12 of the sum` `of 10% and the percentage most recently established by the` `Commission for interest to be paid on customer deposits` `under 83 Ill. Adm. Code 280.70(e)(1), for each month or` `portion of a month that the amount due goes unpaid, except` `that no underestimation penalty shall be assessed if the` `amount actually paid on or before each of the dates` `specified in subsection (f) was based on an estimate of` `gross revenues at least equal to the actual gross revenues` `for the previous year. The Commission may enforce the` `collection of any delinquent installment or payment, or` `portion thereof by legal action or in any other manner by` `which the collection of debts due the State of Illinois may` `be enforced under the laws of this State. The executive` `director or his designee may excuse the payment of an` `assessed penalty or a portion of an assessed penalty if he` `determines that enforced collection of the penalty as` `assessed would be unjust. (h) All sums collected by the Commission under the` `provisions of this Section shall be paid promptly after the` `receipt of the same, accompanied by a detailed statement` `thereof, into the Public Utility Fund in the State treasury. (i) During the month of October of each odd-numbered year` `the Commission shall: `` ``(1) determine the amount of all moneys deposited in the` `Public Utility Fund during the preceding fiscal biennium` `plus the balance, if any, in that fund at the beginning of` `that biennium; `` ``(2) determine the sum total of the following items: (A)` `all moneys expended or obligated against appropriations` `made from the Public Utility Fund during the preceding` `fiscal biennium, plus (B) the sum of the credit memoranda` `then outstanding against the Public Utility Fund, if any;` `and `` ``(3) determine the amount, if any, by which the sum` `determined as provided in item (1) exceeds the amount` `determined as provided in item (2). If the amount determined as provided in item (3) of this` `subsection exceeds 50% of the previous fiscal year's` `appropriation level, the Commission shall then compute the` `proportionate amount, if any, which (x) the tax paid hereunder` `by each utility during the preceding biennium, and (y) the` `amount paid into the Public Utility Fund during the preceding` `biennium by the Department of Revenue pursuant to Sections 2-9` `and 2-11 of the Electricity Excise Tax Law, bears to the` `difference between the amount determined as provided in item` `(3) of this subsection (i) and 50% of the previous fiscal` `year's appropriation level. The Commission shall cause the` `proportionate amount determined with respect to payments made` `under the Electricity Excise Tax Law to be transferred into the` `General Revenue Fund in the State Treasury, and notify each` `public utility that it may file during the 3 month period after` `the date of notification a claim for credit for the` `proportionate amount determined with respect to payments made` `hereunder by the public utility. If the proportionate amount is` `less than $10, no notification will be sent by the Commission,` `and no right to a claim exists as to that amount. Upon the` `filing of a claim for credit within the period provided, the` `Commission shall issue a credit memorandum in such amount to` `such public utility. Any claim for credit filed after the` `period provided for in this Section is void. (i-5) During the month of October of each year the` `Commission shall:` ``(1) determine the amount of all moneys expected to be` `deposited in the Public Utility Fund during the current` `fiscal year, plus the balance, if any, in that fund at the` `beginning of that year;` ``(2) determine the total of all moneys expected to be` `expended or obligated against appropriations made from the` `Public Utility Fund during the current fiscal year; and` ``(3) determine the amount, if any, by which the amount` `determined in paragraph (2) exceeds the amount determined` `as provided in paragraph (1).` If the amount determined as provided in paragraph (3) of` `this subsection (i-5) results in a deficit, the Commission may` `assess electric utilities and gas utilities for the difference` `between the amount appropriated for the ordinary and contingent` `expenses of the Commission and the amount derived under` `paragraph (1) of this subsection (i-5). Such proceeds shall be` `deposited in the Public Utility Fund in the State treasury. The` `Commission shall apportion that difference among those public` `utilities on the basis of each utility's share of the total` `intrastate gross revenues of the utilities subject to this` `subsection (i-5). Payments required under this subsection` `(i-5) shall be made in the time and manner directed by the` `Commission. The Commission shall permit utilities to recover` `Illinois Commerce Commission assessments effective pursuant to` `this subsection through an automatic adjustment mechanism that` `is incorporated into an existing tariff that recovers costs` `associated with this Section, or through a supplemental` `customer charge.` Within 6 months after the first time assessments are made` `under this subsection (i-5), the Commission shall initiate a` `docketed proceeding in which it shall consider, in addition to` `assessments from electric and gas utilities subject to this` `subsection, the raising of assessments from, or the payment of` `fees by, water and sewer utilities, entities possessing` `certificates of service authority as alternative retail` `electric suppliers under Section 16-115 of this Act, entities` `possessing certificates of service authority as alternative` `gas suppliers under Section 19-110 of this Act, and` `telecommunications carriers providing local exchange` `telecommunications service or interexchange telecommunications` `service under sections 13-204 or 13-205 of this Act. The` `amounts so determined shall be based on the costs to the agency` `of the exercise of its regulatory and supervisory functions` `with regard to the different industries and service providers` `subject to the proceeding. No less often than every 3 years` `after the end of a proceeding under this subsection (i-5), the` `Commission shall initiate another proceeding for that purpose.` The Commission may use this apportionment method until the` `docketed proceeding in which the Commission considers the` `raising of assessments from other entities subject to its` `jurisdiction under this Act has concluded. No credit memoranda` `shall be issued pursuant to subsection (i) if the amount` `determined as provided in paragraph (3) of this subsection` `(i-5) results in a deficit. (j) Credit memoranda issued pursuant to subsection (f) and` `credit memoranda issued after notification and filing pursuant` `to subsection (i) may be applied for the 2 year period from the` `date of issuance, against the payment of any amount due during` `that period under the tax imposed by subsection (c), or,` `subject to reasonable rule of the Commission including` `requirement of notification, may be assigned to any other` `public utility subject to regulation under this Act. Any` `application of credit memoranda after the period provided for` `in this Section is void. (k) The chairman or executive director may make refund of` `fees, taxes or other charges whenever he shall determine that` `the person or public utility will not be liable for payment of` `such fees, taxes or charges during the next 24 months and he` `determines that the issuance of a credit memorandum would be` `unjust. `(Source: P.A. 97-1150, eff. 1-25-13.) Section 97.``Severability.``The provisions of this Act are` `severable under Section 1.31 of the Statute on Statutes.`
Modeled effects across six domains, estimated from bill text and comparable legislation.
Sourcing already shown above, this is what the analysis found worth flagging.

Set your location
Add your district to see how this bill may affect your community and who to contact.
Your Representatives
Your representatives appear here once you add your location.

Contact your representatives
Let them know how you feel about this bill.

Share your view
Join the discussion and see what others are saying.

Track this bill