HB 368: Generally revise water supply requirements for coal-fired generating units
HB 368 status: Enacted — Chapter Number Assigned (updated Jun 17, 2025).
OpenStates summary
What this bill does
Overall score


Bill summary
OfficialGenerally revise water supply requirements for coal-fired generating units. Currently in House.
Key analysis
Impact analysis
Environment
Benefits
- Potential for continued operational efficiency of current energy infrastructure
Risks
- Possible reduction in regulatory oversight of industrial water usage
- Potential strain on local water resources
Economy
Benefits
- Supports continued viability of existing coal-fired generation facilities
- Provides regulatory clarity for energy providers
Risks
- Potential for increased costs related to water resource mitigation
Society
Benefits
- Potential stabilization of energy supply
- Protects jobs associated with existing power generation
Risks
- Community concern regarding long-term impact on water availability
How trustworthy & consequential it is
Source
OpenStates
Confidence
lowlow
Analysis status
OpenStates summary
LegiScan returned a PDF-only document. PDF extraction is not enabled in this build, so the pipeline used a safer fallback.
Analysis based solely on summary; full text was not provided
Where it stands
Introduced
CompleteCommittee
CompleteFloor
CompleteGovernor
CompleteEnacted
CompleteHow it affects your district
Set your location
Add your district to see how this bill may affect your community and who to contact.
Take action
Contact your representatives
Let them know how you feel about this bill.
Share your view
Join the discussion and see what others are saying.
Track this bill
Stay updated on progress and changes.